Week 9. COAL Things Missed Last Week Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year.

Slides:



Advertisements
Similar presentations
Topic 1: Types of ore Bodies and Mine Processes
Advertisements

Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
Senior Design – Week Projects. A General Comment Team leaders need to get me team member assignments.
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
McGill Consulting Asif Kan Alexandre Marinho de Almeida Michael Spleit Ahmed Ragab Mine Production Scheduling of a Porphyry copper deposit February 15,
Acid Mine Drainage. Terms Acid Mine Drainage (AMD) –Water that is polluted from contact with mining activity Acid Rock Drainage (ARD) –Natural rock drainage.
Minerals and the Environment. The Rock Cycle Definitions Mineral –a solid homogenous (crystalline) chemical element or compound; naturally occurring.
By: Matt, Ivan, Chris, Gideon, and Brent.  As with the Ekati Diamond Mine in North-Eastern NWT, one of the biggest problems is that many mines are very.
Roads in MineSight.
Surface Mining (The Concept of Surface Mining) Mnge 315 ©Dr. B. C. Paul Spring 2003 revisions 2010, 2011 These slides contain concepts considered by the.
Surface Mining Ore Deposit Grades ©2011 Dr. B. C. Paul Note- The information contained in these slides is considered common knowledge to those schooled.
Week 5 Senior Design Work on Coal Preparation You have determined that you will use a heavy media plant – Plus ½ inch will go to heavy media baths.
Lesson 13.2 Mining More than a ton of waste may remain after extracting just a few hundredths of an ounce of gold.
COAL IS GOOOOOD!!!!! GOOD COAL GOOD COAL IS GOOOOOD!!!!!
Marine Steam Power Plant Heat Balance Progress Report #2 By Steven Gelardi.
Acid Mine Drainage. Terms Acid Mine Drainage (AMD) –Water that is polluted from contact with mining activity Acid Rock Drainage (ARD) –Natural rock drainage.
How to Get a Metal Price for a Concentrate
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
Week 5 Sr. Design DIAMONDS Constraints on Your Mining Plan Building up years of diamond supplies in vaults is not good for diamond valuation (and.
2008 Sr. Design Project ©Jan 2008 Dr. B. C. Paul Plans were made by the Author. MineSight® is proprietary software of Mintec Inc., Maps are taken from.
Week 6/7 (no presentations next week due to SME).
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Week 10. DIAMOND Adjust Your Underground Drawing As Needed Carefully work out your drilling, blasting and mucking cycle – Presumably you will blast at.
Logo L u c k y P e n n y The presentation will begin shortly…
Mining and related Issues Chapter 14 Lecture #3 Sections
Post Break Week 3. Metal Miners This weeks presentation is much improved over last weeks, however, critical design problems remain including – Floating.
Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.
Week 4. SME Weirdness There will be no class from the week of Feb. 16 to 20 th Your report on this work load will be presented on Tuesday Feb. 24 th This.
What are Copper Ores? Ores are samples of earth that contain specific rocks and minerals composed of desirable elements combined with less useful waste.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
Obtaining Information From the Geologic Block Model
Mining And its environmental impact. What determines the type of mining? Underground v.s. Surface Mining v.s. Solution Underground v.s. Surface Mining.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
16.2.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Just After Spring Break Sr. Design. Coal Group For Each of Your Coal Seams Define the Boundary of the areas you believe are minable –Provide a plan view.
Mine Properties. DIAMONDS Kimberlite Pipes Located in Wyoming.
Coal Mines & The Effects They Produce Tyler Morin & Holly Schwichtenburg.
Britta Groh Physics 106Spring  Almost 85% of the energy used in the US in 2007 was generated by fossil fuels  Fossil fuel technologies are no.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Sight Words.
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
Guidelines and Cautions for Finishing. Group and Individual Work Individual Only 40% –Oral Presentations weekly –Completion of tasks weekly Group (sort.
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
Unit #4 Carlson Software. Carlson is an Autocad Overlay Designed to build specialized commands into a widely used drawing package Largely 2D or a highly.
Section 2: Mineral Exploration and Mining
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
Section 2.  Exploring rock for mineralization is the first step in finding an ore deposit.  Rock samples are taken from exploration areas and analyzed.
Mixtures and Separating From Year 9 Chemistry SLO’s 6) Understand that substances are pure or mixtures. 9) Use the term mixture and illustrate with everyday.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Describe the manner in which mining companies explore for new mineral deposits. Describe three methods of subsurface mining. Describe two methods of surface.
Section 2: Mineral Exploration and Mining
Mining Is used to extract valuable minerals from the earth
And its environmental impact
Section 2: Mineral Exploration and Mining
Topic 1: Types of ore Bodies and Mine Processes
Engineering Economic Analysis
Mineral Exploration Exploring rock for mineralization is the first step in finding an ore deposit. Rock samples are taken from exploration areas and analyzed.
Section 2: Mineral Exploration and Mining
Abandoned uranium mine
Objectives Describe the manner in which mining companies explore for new mineral deposits. Describe three methods of subsurface mining. Describe two methods.
MINING.
AIR Quality Control Concepts
Section 2: Mineral Exploration and Mining
Section 2: Mineral Exploration and Mining
Note Pack 40 Chapter 16 Mining and Mineral Resources
Presentation transcript:

Week 9

COAL

Things Missed Last Week Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by year timing map of the #6 coal producing 3 million or more clean tons per year – Have a schedule showing when and how much out of seam dilution will be going to the prep plant – Make sure your timing and equipment capacity accounts for the out of seam dilution you will take – Produce a year by year schedule of royalties or other fees you will be paying to land holders.

Provide the Same Schedule Provide the same year by year mining schedule for your #3 met coal – The schedule should include estimated out of seam dilution and royalties paid to each land owner When your met coal operation starts assume you will still keep 2 million tons of steam coal market using #7 coal – Lay out the same type of schedule for #7, but only through the time when you have mined out the met coal.

Complete Ventilation From Last Week You did get close-ups of how you would vent panel areas, and air quantities – Check your air quantities against velocities to make sure you do not have excessive or deficient air speed Approximately every 5 years or more often when there is a major shift in ventilation draw maps of the over-all vent system showing where air comes in – what routes it travels to get to the face- and how it returns to an exhaust

Complete Your Conveyor Work Last week you size conveyor belts and motors and planned 5,000 feet per main belt run. You did not have a map of the belt network – Provide a map of the belt network every 5 years or more often if there is a major change between 5 year intervals For dewatering you proposed local sumps and piping to a main sump. – Provide maps of your sump and pipe network every 5 years or more often if there is a major change between 5 year intervals.

Add to Your Mine Map Battery Barns Underground Vehicle Service Lunch area Bathroom areas (I know you already show the returns)

Produce Year By Year Supply Acquisition Costs Identify what components at what cost will be bought year by year for installation and extension of your belt network. Identify the same for your dewatering system. Develop your schedule and supplies for putting in stoppings and permanent mine seals

Start Your Ventilation Simulation Pick a point where your ventilation system is short and air does not have to go too far Then pick a point where your ventilation system is very extended Finally pick an intermediate case in time Set up these three cases for computer calculation (or if you prefer – long hand calculations) – Run at least one of the cases – Have a tentative mine fan pick

From Last Week Draw out your flow sheet showing where materials and waste will go and what size it is. – Look for a kind of simplified spreadsheet layout that will help you understand the minimum I am after.

Last Task By Friday of next week have your revised write-up done – You need not have written out all your appendices, but you should refer to them where you will have them – Keep my red notes in place and add your new changes and text in green

DIAMOND

Work on Your Underground You have determined you will use a 3 level system in each of two areas of the underground pipe. Draw in your shafts, haulage, travelways, ore passes and other facilities that will be in durable non-kimberlite ground. – These working should be in 3D minesight – They may include lunchrooms, workshops, parking areas, or areas for security scans.

Calculate Calculate the volume of kimberlite that will have to be mined from your K1 and K2 areas each year – Show how you got the calculated amount (you are presumably not counting mega-diamonds since you did not attempt to define their frequency.

Draw the Cuts Draw the area actually open in cuts into the kimberlite in years 1, 2, 3, 4, and 5 – Don’t draw in all the parallel entries – only what is actually open at each point in time

Ventilation Network Draw in your ventilation network at the end of 5 years. – Simulate the airflows so that you have air quantities and heads – Your equipment is mostly diesel – make sure you are getting the required air to dilute the diesel emissions

Haulage Plan out your underground haulage system – Show where each type of equipment will serve to move the ore Draw out diagrams of your shafts and slopes that serve your underground mine.

Build a Manning Table Build a month by month, shift by shift list of how many people doing what you will have on the job at the mine.

COPPER-GOLD

Develop Your Flow Sheets Make sure your excel spreadsheet covers all 6 types of ore Improve your spreadsheet to where I can input my ore grade and the spreadsheet will give me the mass balance all the way through the process Account for any iron you process or recover Account for your sulfuric acid production from your roasting

Develop the First Draft of the Appendix You Will Use in Your Report MSOPIT requires specific recovery, cost, product values etc. Show how you obtain each of these numbers and explain how you get those numbers from your process

Decide What Will Happen to Below Cut-Off Grade Ore MineSight MSOPIT allows multiple processing for each ore type – The first process is the most intensive recovery process – The last process must be a complete waste – no recovery at all process – In-between you may have processes that get some recovery from lower grade ore (usually leach processes – though you don’t have to have them)

Possible Low Grade Processes Leach processes are most common – You could crush and then take to leach pads but this requires both grinding and some significant rehandle costs – You could take ore to a dump area that gets leached In practice some companies just leach their dumps for what ever they can get In MineSight – even if you leach your dumps you have to have a class 2 dump that you don’t leach – There may actually be no rock that ever uses it, but you still have to have it in the program

Leaching Processes A sulfide copper leach – Many involve dumped run of mine rock where acid and water are poured over it – Sulfide leaching may go on for 20 years or more and seldom does much more than about 10% recovery (unless the ore is crushed down and put on special pads) Sulfide acid leaches will dissolve out copper and a little silver, but no gold. The copper solutions are boosted in concentration using solvent extraction The concentrated copper solution is sent to electrowinning and the copper is plated out – Recovered silver goes to the anode slimes that can be sent off to smelting

More Leach Options Oxide Copper Leach – Some people will crush the rock and put it in smaller leach pad stacks – Sulfuric acid will directly dissolve copper out of copper oxides It will also dissolve metallic silver, but not gold – Copper oxide leaching is far faster than sulfide leaching You’d expect about 15 to 20% recovery in a few years without special pads or crushing With special pads or crushing you might get 40 to 50% – Copper and silver in solution go through solvent extraction and electrowinning just like with the sulfide ore.

More Leach Gold and Silver Leaches – Gold and Silver will leach from piles too but a cyanide leach is alkaline, which won’t leach copper – Lots of acid producing sulfides will also cause excessive cyanide consumption Cyanide is very chemically active and does not last well in unfavorable environments – Silver will leach with Copper or with Gold – but Gold and Copper leaching are usually mutually exclusive – Pyrite encapsulated gold is not leachable

When You Have Your Numbers Run the ultimate pit with MSOPIT – The output will tell you how much went to dump, leach, and mill – It will tell you what the average grade of your mill ore is Use your models to predict the tailings volume you will have – Draw out the waste dumps and tailings pond you will have on 3D MineSight drawings with the open pit.