Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.

Slides:



Advertisements
Similar presentations
The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)
Advertisements

St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
Delmar Boulevard bridge replacement over Interstate 170.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
San Antonio, Bexar County, Texas Hays Street Bridge.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
Baudette, Minnesota/Rainy River, Ontario International Bridge
S.R. 933 Bridge Rehabilitation and Repair Project Over St. Joseph River South Bend, Indiana Wednesday, March 21, :30pm Presentation St. Joseph County.
Chapter 34 Bridge Construction.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Onslow Beach Bridge Jacksonville, NC.  This project called for abrasive blasting and protective coating application to the Onslow Beach Bridge, a rotating.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
POWERPOINT PRESENTATION
Toronto District School Board Facilities Services Department North Toronto Collegiate Institute Status Quo.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
Restoring Our Heritage. Recognizing Our Future. Lockport’s Flight of Five: Erie Canal Locks #67-71.
Innovating in a compact environment
Project Description: The Stonelick-Williams Corner Road Covered Bridge Rehabilitation project proposes improvements to the existing structure to preserve.
Historic Rehabilitation and Widening of Ford Street Bridge A UNIQUE EXPERIENCE.
There are more than 500,000 bridges in the United States!
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
October 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Approaches to Historic Bridge Rehabilitation Case Study #1 1.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Bridging the Gap Bridges make it possible to cross gaps without falling in, getting wet, or going the long way around. The first bridges were probably.
THE DESIGN PROCESS. General Design Process Need –Determine functional requirements… Specification –Identify essential problems […] –Search for … solution.
Approaches to Historic Bridge Rehabilitation Case Study #4
Current Construction Projects Major Projects Pinellas County.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Draft for Discussion & Policy Purposes Only
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
CI1697-R: Bridge Modeling Approaches Dave Simeone – Senior Product Manager, AutoCAD Civil 3D Edmundo Herrera – Autodesk Technical Specialist, Transportation.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Approaches to Historic Bridge Rehabilitation Case Study #2
1 Coastal Commission Staff Presentation Item W13A (City of Huntington Beach) Warner Avenue Bridge, Huntington Beach, Orange County.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Posting Bridges for Specialized Single-Unit Trucks
Approaches to Historic Bridge Rehabilitation Case Study #3
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
Blatnik Bridge Management Study
Practical Ideas for Making History & Context Matter in Design Decisions Mary E. McCahon Senior Historian.
The Historic Bridge Project Development Process.
Monterey County Project Report for Measure X Expenditures
STANDING WATER FOOTBRIDGE
Baffles – Structures - Spans
Presentation transcript:

Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1

Carrollton Bridge Carrollton Road over the Wabash River, just north of Delphi, Indiana Rural location was the site of the first permanent crossing of Wabash River. Also, the location of historic Wabash and Erie Canal Lock. Reinforced Concrete Arch Bridge Constructed in 1927 Six spans Designed by Daniel B. Luten Listed on the National Register of Historic Places Case Study #3 2

Carrollton Bridge Rehabilitation Notice to Proceed with Design: May 2 nd, 2005 Construction Cost: $1,916,750 Designer: Butler, Fairman, & Seufert, Inc. Owner: Carroll County Contractor: Wirtz and Yates, of Kentland, Indiana Case Study #3 3

Significant Issues Associated With Project Case Study #3 20 foot wide clear roadway Deteriorated original railing 4

Extensive Concrete Deterioration in Overhang Brackets Case Study #3 5

How Clearance Issue Was Resolved Case Study #3 Bridge owner wanted to widen bridge by 8 feet. Interested historical agencies wanted width to remain the same. Both parties compromised on widening bridge by 4 feet. 6

How Railing Issue Was Resolved Case Study #3 Modified Texas Rail to match existing rail. Changed the opening shape from the “church window” to a rectangle. We were able to keep reinforcement details the same. Therefore, the rail was still considered crash-worthy. 7

New longer brackets were designed composite with deck. Case Study #3 8

Old Brackets were used as temporary supports and as guides for new brackets. Case Study #3 9

How Aesthetic Issue Was Resolved Insert Picture(s) of Solution Case Study #3 Masonry Coating was used to blend new concrete with old. Contract required several test swaths. Owner agreed to allow interested parties to select final color combinations. 10

Project was reopened to traffic 19 months after notice to proceed for design work. Case Study #3 11

The rehabilitation cost approximately 40% less than the earlier planned replacement. Case Study #3 12

Lessons Learned/Conclusions Must encourage owner and interested parties to compromise. Look for current standards that may be able to be slightly modified to match existing conditions. Careful detailing can ensure that historic integrity is not lost in rehabilitation and repair work. Case Study #3 13