Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.

Slides:



Advertisements
Similar presentations
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
Advertisements

FLUKA status and plan Sixth TLEP workshop CERN, October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
Impact of synchrotron radiation in LEPTON COLLIDER arcs
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
Injection foils and handling system Review on PSB 160 MeV H - Injection 9-10 November 2011 W. Weterings C. Boucly, M. Hourican, R. Noulibos, Y. Sillanoli.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
XFEL-INJ1/2 DUMPS Remarks / Requirements, Injector Beam Dynamic Review Meeting, DESY, Mon. 23. October 2006 ‹#› XFEL - INJ 1/2.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
The Stripping Foil Test Stand in the Linac4 Transfer Line
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
2 Davide Aguglia TE-EPC-FPC Sept. 23 rd rd PSB injection EPC powering rack space coordination meeting Stripping foil chicane BSW magnets powering.
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
LIU-PSB Review on H-/H0 dumps – 18 th April 2013 H-/H0 current monitor F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni, S. Burger, G.J. Focker, J. Tan BE/BI.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
If information seems to be missing, make any reasonable assumptions. 1.A target has an areal density of 2.3 g/cm 2 and a thickness of 0.8 inch. What is.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
3 MeV H - chopper beam dump Presentation by L.Bruno 1 3 MeV H - Chopper Beam Dump Pre-design study By L.Bruno AB/ATB M.Magistris AB/OP M.Silari TIS/RP.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
SPS High Energy LSS5 Thermal contact & cooling aspects
ESS Front End diagnostic
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Subject: INJECTION SYSTEM Junction LINAC4-booster
X PS Internal Dump Core Review François-Xavier Nuiry Giulia Romagnoli
Stephan Aulenbacher MAGIX Collaboration Meeting
LINAC4 ADVISORY COMMITTEE
Proposal TDIS-TZM WP14 TDIS jaw validation testing
Options and Recommendations for TL and Dumps
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
Components for the Machine-Interface Regions
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
Radiation protection of Linac4 M. Silari Radiation Protection Group
Vacuum System Failures at HERA
Thermo-mechanical simulations jaws + tank
Beam Injection and Extraction Scheme
Single Detector Design
Cu67 Isotope Radiator & Target
Presentation transcript:

Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh

Outline Available specs Space & layout Loading cases Preliminary analyses : – Average Ambient Dose around the dump – Energy Deposition Density – Instantaneous DT – Transient to steady operation – Steady operation Support / cooling proposal Conclusions 09/11/20112C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection

Available specifications 09/11/20113C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection EDMS /09/11 EDMS /10/11 Chamber drawings (proposal) - 25/10/11 EDMS /08/10 + EDMS /06/10

Space & layout 09/11/20114C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection The flange has to be adapted to the assembly / fixation / cooling needs of the dump EDMS mm The instrumentation has to be fixed on the dump (front face) The dump is one-piece with the flange (ALARA, quick exchange / disassembly)

Space & layout 09/11/20115C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection No differentiation between H0 and H- loads H- impact angle: assumed ~33mrad (J. Borburgh)  t.b.c. EDMS , 44 EDMS The whole envelope is considered for the dump only (no shielding considered) Proposal for a supporting structure / fixation under development

Loading cases 09/11/20116C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection Operation: Three loading case (following stripping efficiency): (1) e = 98% (foil operational) (2) e = 90% (foil degraded) (3) e = 0% (foil accident) 4/4 Linac4 Beam loading case (foil accident + distributor failure) › Steady-state, 2% all H0, 0.8mA › Steady-state, 10% all H0, 4mA, 8h max › Transient 1/4 Linac4 pulse, 40mA, 100% H- (interlock after 1 pulse) › not considered EDMS

FLUKA / Average Ambient Dose around the dump 09/11/20117C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection TOP view, Equivalent Rate H*(10) (μSv/h) after 1 day cooling SIDE view, Equivalent Rate H*(10) (μSv/h) after 1 day cooling RP / magnet : need for shielding ? “…For boron nitride and graphite, after a few days of cooling time the dose rates are of O(10)−O(10 2 ) μSv/h, according to the location around the dump. The dose rates are a factor of 3-4 times higher for aluminum nitride…”

Energy Deposition Density 09/11/20118C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection Half dump BOTTOM view, Energy Deposition Density for loading case (3) [J/cm 3 /pulse] 3.73 J/cm 3 /pulse Case (1) H- beam 33mrad

Instantaneous T 09/11/20119C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection Half dump BOTTOM view, T due to 1/4 Linac4 pulse (3) H- beam

Transient to steady operation 09/11/201110C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection

Transient to steady operation 09/11/201111C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection (2) Foil degraded (90%, 71 W) Nominal cooling (2) Foil degraded (90%, 71 W) NO cooling

Steady operation 09/11/201112C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection (1) Foil operational (98%, 14.2 W) (2) Foil degraded (90%, 71 W) ~ 40  m expansion (case 2) Circulating H+ beam ~ 2  m bending (no support, no chamber) Half dump BOTTOM view,  T due to steady-state operation 0.5 ÷ 3 l/min for cooling depending on the fixation chosen H 0 beam

Support / cooling proposal 09/11/201113C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection Demand for careful design of the vacuum flange (weakness)? No water feed-through  water-into-vacuum leak risk Graphite-to-Copper brazing Stainless Steel plate

Support / cooling proposal 09/11/201114C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection Entrance for water cooling Exit for water cooling Graphite-to-Copper brazing Cu-Brazing Copper part inserted into Steel flange

Conclusions The analyses have been done based on up-to-date specs : temperatures and cooling are not an issue – In case of loading (2) + of cooling failure  temperatures increase smoothly Induced radioactivity : need for a shielding ? Some parameters have still to be defined: – Impact angles of beam (important for H- beam in accident, vacuum chamber, etc..): 33mrad t.b.c. Risk of scraping the circulating H+ beam, reduced width Dump support / fixation to vacuum flange  feedback from design /vacuum needed, careful flange design 09/11/201115C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection

Thank You 09/11/201116C.Maglioni, M.Delonca - Review on PSB 160 MeV H - Injection