IP-BSM Status and Plan 11th ATF2 Project Meeting Jan. 13, 2011 SLAC National Accelerator Laboratory Menlo Park, California Jacqueline Yan, M. Oroku, Y.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Developed by Niels Bogh March Objective At the end of the class you will be able to explain the differences of the three main types of flame safety.
Compton gamma stability - Status of the drift source investigation - Nobuhiro Terunuma, KEK March 17 th, 2014, LAPP, FJPPL-FKPPL ATF2 Workshop 1.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
/18 Yasuaki Ushio Hiroshima University The result of cavity compton experiment.
Tungsten wire & VISAR Goran Skoro 24 October 2008.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
The Speed of Light How to hold a hallway hostage for fun and intellectual profit. (starring: the equipment)
Absorption and emission processes
MICE Target Review Chris Booth Sheffield 12 th June 2006.
RF Synchronisation Issues
1.4 Pulsed operation Normal pulsed mode In a normal-mode pulsed laser, pumping is usually via a short pulse that produces a short-lived population inversion.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
TYPES OF LASER Solid State lasers:Ruby laser, Nd:YAG laser, Nd:Glass laser Gas lasers:He-Ne laser, CO 2 laser, Argon laser Liquid/Dye lasers:Polymethene.
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
October 16-18, 2012Working Group on Space-based Lidar Winds 1 AEOLUS STATUS Part 1: Design Overview.
Trinity Charging Experiment Gregg Harry, MIT On behalf of Dennis Ugolini, Trinity LIGO-G R.
IPBSM status and plan ATF project meeting M.Oroku.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
CMS ECAL Laser Monitoring System Christopher S. Rogan, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
A. Fabich, CERN MERIT collaboration meeting, CERN, 7-8 February 2008 MERIT beam intensities, Feb 08A. Fabich, CERN1.
Neutron detection in LHe ( HMI run 2004) R.Golub, E. Korobkina, J. Zou M. Hayden, G. Archibold J. Boissevain, W.S.Wilburn C. Gould.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
1.Stable radiation source 2.Wavelength selector 3.Transparent sample holder: cells/curvettes made of suitable material (Table 7- 2) 4.Radiation detector.
Recent Results in Analysis of Errors in Fringe Scans by Shintake Monitor (IPBSM) ATF2 Topical Meeting July 8, 2013 KEK ATF2 Topical Meeting Jacqueline.
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
Laser System Upgrade Overview
T. Suehara, H. Yoda, T. Sanuki, Univ. of Tokyo, T. Kume, Y. Honda, T. Tauchi, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Wakefield effect in ATF2 Kiyoshi Kubo
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Laser transient induced by a pumping step t Ip Case of HeNe :  and  c same order of magnitude n0n0 Laser intensity  n th nn.
ATF2 Status N.Terunuma, KEK
Atmospheric Remote Sensing Via Infrared-Submillimeter Double Resonance
Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning Technology and Instrumentation in Particle Physics 2011 Chicago, June 11 Jacqueline.
Gated Mode - System Aspects
2011/ 07/06 Jacqueline Yan IPBSM
MERIT beam intensities
Presentation transcript:

IP-BSM Status and Plan 11th ATF2 Project Meeting Jan. 13, 2011 SLAC National Accelerator Laboratory Menlo Park, California Jacqueline Yan, M. Oroku, Y. Yamaguchi, T. Yamanaka, Y. Kamiya, T. Suehara, S. Komamiya ( The University of Tokyo ) T. Okugi, T. Terunuma, T. Tauchi, S. Araki, J. Urakawa (KEK)

layout Beam time results of Nov /Dec of 2010 – 2-8 degree mode – 30 degree mode reasons we could not detect modulation Laser system status – Laser focusing problem What happened? possible causes – Laser timing problems Timing system renewal - detector gate timing Plan from 2011 Jan~

Laser Problems (last beam time) Thur (12/16)  Fri. (12/17): Attempting 30 deg mode directly from 6 deg (1) laser timing messed up  Beam and laser interference fringe ceased to collide  Lost modulation (2)Unfocused laser spot size at IP low S/N Switched back to 7.79 deg tried to control laser timing Re-conducted laser wire scan, z – scan  collision temporarily resumed BUT modulation get lost on and off beam intensity and laser timing remained unstable

Unfocused Laser lower laser path unfocused : σ laser 2 (30°)= μm  Wide laser wire scan peaks c.f. design size ~ 10 μm Upper path : σ laser1 (30°) = μm

Where to blame for unfocused laser?? (1)cooling water suddenly fell below safety line  interlock gave off  Air bubbles got in during replenishing May have….. blocked excitation lamp, disturbed seeder  re-circulated (> 50 times) (2) abrupt interlock stop  took time to recover  affected upper path also (recovered later) (3)Changed lower path lens at 30 deg (possibly in wrong direction)  However is 8 deg focused?? σ laser2 = (7.79°) = 27.9 μm

Startup day: tank 1/5 full couldn`t find leak  Evaporate rapidly if used over 10 hrs everyday, esp. during dry climate must be cautious from now on New tank (see next slide) Checked: cooling water purity is not the problem in fact, purer than ATF purified water sample resistivity: [Ω ・ cm] IP-BSM : 1.57 x 10^6 ATF sample: 7.72 x 10^5 More on Cooling Water

External cooling water tank (1) Fast evaporation due to unclosed system extend two hoses to outside of power source Connect to new tank Tank lid sealed tight with rubber insulate hose and tank (laser sensitive to temperature) (2) water level judged only visually no alarm: abrupt interlock stop Switch interlock connections from current tank to new tank New tank has monitors: constant display + alarm  Water level monitor : connection to current water level interlock  Flow monitor : interlock connection to laser power source (3) Air bubbles get in during refill or exchange Hand-powered valves on hose connector: seal tight during refill

laser –beam timing: 97 ns difference required Beam: stripline timing BPM (upstream) Laser: PIN-Photodiode TDC START: laser output synchronized with Q-switch

Triggered Flash Lamp creates light pulse Max Laser power extraction if Q-Sw triggered ~180 μs after FL trigger Output ~ 100 ns after Q-switch trigger laser pulse width = 8 ns (FWHM) after SHG (1064  532 nm ) laser Q-switch timing 180μs

Old timing system laser-beam collision Analog delay modules 180μs separate ref. signals for FL and Q-Sw Q-Sw: Gate generator 1.56 Hz FL: Pulse generator + gate generator 6.25Hz

Laser Timing Problems FANIN/FANOUT of gate generators taken for Laser Q-switch ① 6.25 Hz (laser ~ 10 Hz) ② 1.56 Hz (beam at 1.56Hz)  laser pulse timing disturbed by few hundred ns jitter  prevented beam – fringe collision few ns scale control required Delay on analog modules Incompatible for fine 100ns step adjustments (1)6.25 Hz gate generator (~ 100 μs) (2) pulse generator (~ 800 μs)  since FL and Q-Sw had separate ref. signals

Substitute analog module with digital TD4 “double TD4 set” 2.1 MHz (462 ns step) TD4 : rough timing paired with 357 MHz (2.8 ns step) TD4 : precise work simultaneous control of FL and Q-Sw  Common upstream ref. signal Timing System Renewal precise !! simpler!! Preliminary beam-laser timing adjustment 180μs delay between FL and Q-Sw Precise laser-beam timing LAMP Q-Sw

(1). Delay (~ 100 μs) 1.56Hz ref. signal with TD4 (2) Pulse generator ; {1.56 Hz  6.25 Hz} No more pulse generator delay (3) FANIN/FANOUT: one branch becomes Flash Lamp trigger (4) Another branch delayed 180 μs  become Q-Switch trigger essential for collision between beam and laser interference fringes FL and Q-sw triggers proceed into DAQ  FANIN/FANOUT  use in photodiode, peakhold trigger, image sensor of phase monitor Timing System Renewal

16 chan. ADC gate: ref. signal from kicker (~ 1 ms later than laser ref. signal) delayed ~ 100 μs Is analog module here ok? Ganma detector PMT output Gamma detector timing

Plan for Next Steps (2011 Jan ~) IP-BSM shift: Test out new laser timing system  No more jittering /drift disturbing beam-laser collision (?) Detector gate timing evaluation Focus each laser path at IP at 30, 174 deg  determine real causes for previous failures  Improve laser cooling system  Lens adjustment Continuous run: Shift to 30 deg mode from 8 deg mode (more details coming up tomorrow: “IP-BSM operation”)

Back up

Unfocused laser 1. move to 30 deg 2. cannot focus bottom path, even when change reducer increased average to confirm cannot focus (not reliable until here) 3. changed lens of lower path Lens may not be the problem because not focused at at 8 deg mode either 4. lower path even fatter 5. not enough water, interlock gave off during upper path scan 6. changed lens again in opposite direction 7. now upper path cannot focus either (from here on very strange) 8. many times re-circulation 9. upper path became focused 10. lower path still cannot…… 50 ns detector jitter ????

Entire New laser timing system

Old timing system during improvement this was adjusted to ensure laser-beam collision 180μs delay for laser output at max power separate reference signals for flash lamp and Q-Switch Gate generators

Entire old laser timing system

Q-switch for high power, high peak, short pulsed output Spontaneous change of Q value Nd:YAG laser has long excitation period: large energy stored Laser pulse should approach beam bunch (~ 30 ps) for max. Compton signal 1. Flash Lamp: pumping Excite levels in crystal (oscillator) 2. Quenching, de-excitation: emitted light oscillate  form inverse population Keep Q value low up to here Maintain high loss within oscillator, suppress resonance  larger inverse distribution 3. induced (stimulated) emission > absorption boost Q value at moment of max inversion distribution, sudden resonance laser Q-Switch timing