Www.oeko.de ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

A.K.Perumal CDM – MP,SSC-WG,RIT member. Large Scale Methodologies.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
Tel MW Wind Farm 100X850kW Wind Turbine 9 m/s Average Wind Speed 45% capacity factor 335 GWh/year Egypt / Spain Cooperation.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
CDM Baseline, additionality, leakage and monitoring plan Executive Training on the CDM, Jakarta
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
The First Carbon Exhibition
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
“Baselines for Small-scale CDM " Jørgen Fenhann, UNEP Risø Centre National CD4CDM workshop Casablanca January Content of the presentation: Present.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Capacity Development for CDM Project Presentation of Selected PDD Methane capture and combustion from swine treatment for Peralilo By Kwaku Wiafe Senior.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
CDM A/R Investors' and Developers' Workshop, Beijing 2010 CDM Afforestation/Reforestation Projects: International workshop for developers and investors.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
AIT Asian Regional Workshop on “Capacity Development for CDM” 19 – 21 st October 2005 Major Highlights of EB Decisions on Developments of CDM Projects.
Development Alternatives Baselines, Additionality & Monitoring Methodologies For Orientation Workshop on March 25-26, 2004 Udit Mathur Climate Change Centre.
Implementation of the Kyoto Protocol: what does it mean for bioenergy and C sequestration? Implementation of the Kyoto Protocol: what does it mean for.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Clinic: PIN preparation Hakim Zahar, P.Eng. Vice-President ECONOLER INTERNATIONAL & Natasa Markovska, D.Sc. EE Senior Scientific Collaborator Consultant.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
EMMER INTERNATIONAAL ARWG tools and consolidation of methodologies Igino Emmer.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
The not revealed truth for GHG and CO2 Electricity Emission in AB Based on Alberta Environment and Statistic Canada reports Picture source:
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Seite 1 Seite Seite 1 CDM in Egypt Potentials and Projects Presentation by Dr. Paul H. Suding, GTZ MENA Carbon Forum 2009 Cairo,
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Presentation transcript:

ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann

ww.neprisoe.org COP/MOP EB Meth Panel SSC WG A/R WG It is the Meth Panel and the Small-Scale Working Group (SSC WG) that will evaluate your methodology proposal.

ww.neprisoe.org How long time does it take to get a new methodology approved?

ww.neprisoe.org Project developers have submitted 344 new methodologies (NM’s) to the Executive Board. Now the number of active approved methodologies are 181: 73 large-scale approved methodologies exist (AM’s) 17 large-scale consolidated methodologies exist (ACM’s) 71 small-scale approved methodologies exist (AMS’s) 11 large-scale afforestation methodologies exist (AR-AM) 2 large-scale consolidated methodologies exist (AR-ACM) 7 small-scale afforestation methodologies exist (AR-AMS) How many approved CDM methodologies exist?

ww.neprisoe.org 31% of the methodologies are never used!!, and 36% only 1-5 times

ww.neprisoe.org Content of an approved methodology Source, Approach Applicability Summary Identification of baseline scenario Additionality Project boundary Emission reduction formulas Leakage Monitoring methodology

ww.neprisoe.org Tool for the demonstration and assessment of additionality Combined tool to identify the baseline scenario and demonstrate additionality. Tool to calculate project or leakage CO2 emissions from fossil fuel combustion. Tool to determine methane emissions avoided from dumping waste at a solid waste disposal site. Tool to calculate baseline, project and or leakage emissions from electricity consumption. Tool to determine project emissions from flaring gases containing methane. Tool to calculate the emission factor for an electricity system. Tool to determine the mass flow of a greenhouse gas in a gaseous stream. Tool to determine the baseline efficiency of a thermal of electric energy generation systems. Tool to determine the remaining lifetime of equipment Methodological tools (Lego system)

Additionality “The project activity is expected to result in a reduction in anthropogenic emissions by sources of greenhouse gases that are additional to any that would occur in the absence of the proposed project activity”. More than half of the 199 rejected CDM projects were rejected because of lack of additionality

Additionality tool:

Additionality for Small-Scale projects Show that the project would not have occured without CDM due to: Investment barrier Technological barriers Barrier due to prevailing practice Other barriers: Institutional, information, managerial, organizational capacity, financial, or capacity to absorb new technologies

Leakage “Leakage is defined as the net change in anthropogenic emissions by sources of greenhouse gases which occurs outside the project boundary, and which are measurable and attributable to the CDM project activity.” Example: A rice husk plant uses up the rice husk so that another rice husk plant has to switch to fossil fuel.

Project boundary “The project boundary shall encompass all anthropogenic emissions and/or removals of GHGs under the control of the project participants that are significant and reasonably attributable to the project.” What is does Materiality mean?

Emission factor for grid electricity: Operating Margin Operating margin (OM): Project affects the operation of current and/or future power plants Example approach: Weighted average emissions (in kg CO 2e /kWh) of all generating sources supplying electricity to the system (excluding low-cost/must-run sources (renewables, hydro)).

Emission factor for grid electricity: Build Margin Build margin (BM): Project replaces a facility that would have otherwise been built. Example approach: Weighted average emissions (in kg CO 2e /kWh) of recent capacity additions: Identify the five most recent installations in the system (according to date of commissioning).

Emission factor for grid electricity: Combined Margin If the total generation (MWh) of the recent five additions is less than 20% of the total system generation, then include more units until the total generation by the new generating units is at least 20% of the total system generation. Combined margin (CM): Average of OM and BM. New: For wind and solar projects the default weights are OM: 0.75 and BM: 0.25, owing to their non-dispatchable nature.

There are 6 types of small scale projects Type I: Renewable energy < 15 MW Type II: Energy efficiency < 60 GWh Type III. other types GHG reduction < 60 ktCO2/year For afforestation/reforestation projects: they must have a GHG reduction < 8 ktCO2/year and must be made in low- income communities. EB54 Annex 15 Guideline on no additionality test for Super-small-scale projects in LDCs/SIDs or in a special underdeveloped zone of the host country identified by the host country Government before 28 May 2010 for project: < 5 MW or < 20 GWh

ww.neprisoe.org