1 Answer the questions relating to each of the graphics in turn. Say the answer to yourself, then check it. To revise the passive, click HERE Self-testing.

Slides:



Advertisements
Similar presentations
Ch.2 There are 6 frogs in a pond. 4 more frogs jump in the pond. How many frogs are there now? *Press Esc at anytime to end show Click here for answer.
Advertisements

Introduction This tutorial is designed to help you navigate The Citizens Council Website. It does not cover every item on the website but serves as a basic.
A Joke Book by Gauge Click to continue. After each answer, click to continue to the next joke. Enjoy.
Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.
Follow the step by step guide to fill out your program sheet.
Five Little Men in a Flying Saucer. Five little men in a flying saucer Flew round the world one day,
How Tall Are You? Introducing Functions By Jenna Hayes under the direction of Professor Susan Rodger Duke University July 2008 Updates made June 2014 by.
Malachi 4:5-6 "See, I will send you the prophet Elijah before that great and dreadful day of the LORD comes. He will turn the hearts of the fathers to.
Scanning Tunneling Microscope How to use the STM Developed by Malory M. Peterson, Summer 2006 Nanotechnology Grant National Science Foundation #
1 MAKE A SURFACE FROM NEW STRUCTURE CREATE NEW SURFACE CALCULATE EARTH VOLUMES 3 METHODS.
Memory Verse: “Answer me, O Lord, answer me, so these people will know that you, O Lord, are God, and that you are turning their hearts back again.” I.
 You can use google docs to construct tests or surveys that can be given online.  Multiple choice, matching, or fill in one word answers work well with.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Created by Verna C. Rentsch and Joyce Cooling Nelson School
{ How to connect to Palace Chat V4 A basic tutorial on how to connect and use the Palace Chat program.
Sight Words.
Earth’s History But…there is no book! Oh…rats…. Why do we want to know Earth’s History? Catastrophic Events –If it has happened before, can it happen.
Words from the Fry List. set put end dies.
Bill Leedom Summer Internship Timber Trail Golf Course.
Changing Color, Using Text Objects, and Random Selection in Alice By Jenna Hayes Under the direction of Professor Susan Rodger Duke University, July 2008.
By: Maggie Casteel An instructional showcase showing 7 th grade students how to reach 100% on their Individual Learning Plan (ILP).
Sight words.
Pop-up Evergreen Tree. Designed by Robert Sabuda.
Purple Silent Reading Day Choose a BOOK from the SHELF. READ SILENTLY for TWENTY MINUTES When time is up, turn to the THIRD PAGE of your JOURNAL. Answer.
How to Use Facebook This guide will help you navigate around the social networking site, Facebook.
The Romans were famous for their roads. They were built by the Roman army during times of peace.
List #2 2nd hundred most commonly used words Directions: 1. Please read through this list with a partner 2. Time each other reading the words 3. Start.
To begin click: File, New, then select Design Familiarize yourself with the controls on the page. Then use the maximise button the make the window fill.
Setting Up New iPad. STEP 1 Click on “English” STEP 2 Click on “United States”
Sight Word List.
From the home page go to the Podcast Publisher box since you will be the publisher of the podcast. That’s the darker green one on the top left. Click.
Web Design-Lecture3-QN-2003 Web Design Enhancing a Website.
Open Publisher- it is part of Microsoft Office Then find: Blank publications Full page.
obedience hearing + doing We obey God because He is God! If the Lord is God, follow him; but if Baal is God follow him. 1 Kings 18:21.
Title: Understanding signs and instructions Date: 13th December,1999. Prepared by: Vivian Lau York Chee For: Primary six pupils.
PADI Individual performance analysis process. Guidelines for 2010 Creating your PADI: Process description PADI Structure Individual Goal Setting Using.
Step 1: Place x 2 term and constant into the box 2x 2 2 PROBLEM: 2x 2 + 5x + 2.
High Frequency Words.
Seeing Words Seeing Words Mighty Machines bulldozer.
Log on to Your user name will be the same as your current address except after sign you must enter “irs-mos.org”.
Patterns and Algebra Balancing Number Sentences
Multiplication Level 1 (Facts 0-2) Read These Instructions:  Try to get the answer before the computer puts it on the screen.  Do not click on your.
If you don’t have Google Earth downloaded already, you can go to to get it.
How Tall Are You? Introducing Functions for Alice 3 By Jenna Hayes under the direction of Professor Susan Rodger Duke University July 2008 Updates made.
Created By Sherri Desseau Click to begin TACOMA SCREENING INSTRUMENT FIRST GRADE.
Naviance Building your Resume. 10 Easy Steps to Build your Resume: Step 1.Log into Naviance (Family Connection) Step 2.Click on Update your Resume Step.
For each slide:  refer to the information grid and say to yourself the missing verb forms  click anywhere to check your answers  make sure you understand.
Earth Moving Equipment Companies in Sharjah
Blazes and Signs On the Oak Ridges Trail.
Office 365 Basics.
Fractions This presentation will help you to: add subtract
Click here for the answer. Click here for the answer.
Click here for the answer. Click here for the answer.
Click here for the answer. Click here for the answer.
Basic Factoring Review
QUESTION INSTRUCTIONS
Drawing Two-Dimensional Shapes with Digital Technology
Rectangular Coordinates Level control in trenches
Seeing Words.
QUESTION INSTRUCTIONS
Seeing Words.
Quiz Name Here Click to start.
Starter On page 9 of your book answer the following questions.
High Frequency Words.
RTI 10 Week 5.
Starter On page 10 of your book answer the following questions.
W H A T I F S 1 KINGS 19.
Step –By-Step: How to Make a CPS Online Profile
Pray Big Josh Boyer September 8, 2019 Series: ASK: Ask Seek Knock.
Presentation transcript:

1 Answer the questions relating to each of the graphics in turn. Say the answer to yourself, then check it. To revise the passive, click HERE Self-testing Structures Practice - Passive Forms (advanced) To revise motorway vocab, click HERE Motorway Construction

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 2 What about the motorway route? It’s being cleared (prepared). START AGAIN Graphic 1

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 3 What about the third tree from the top left? It’s being cut (sawn) down. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 4 How many trees have been cut down so far? Four of them have been cut down so far. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 5 What is the bulldozer being used for? It’s being used to tow/drag/take away the trees which have been cut down. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 6 What about the tree in the bottom centre of the graphic? It’s being towed/dragged/taken away. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 7 Where do you think it is being taken? It’s being taken to a sawmill. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 8 What is going to happen to it? It’s going to be cut (sawn) up into logs and planks. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 9 How many trees are going to be left standing? Two trees are going to be left (standing). Graphic 1 ?

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 10 Who are the two men with instruments? They’re surveyors. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 11 What are their instruments being used for? They’re being used to survey the route. Graphic 1 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 12 What has been dug? A trench has been dug. Graphic 2 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 13 What has been laid in the trench? (Drainage) Pipes have been laid in it. Graphic 2

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 14 Why hasn’t the trench been filled in yet? Because the pipes haven’t been connected (yet). Graphic 2 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 15 What is going to happen once the pipes have been connected? The trench is going to be filled in. Graphic 2 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 16 What is the bulldozer going to be used for once the pipes have been connected? It’s going to be used to fill in the trench. Graphic 2 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 17 What do you you think will be done with any surplus earth once the trench has been filled in? It will be taken away. Graphic 2 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 18 How many trees are being cut down? There are no trees being cut down. No trees are being cut down Graphic 2 START AGAIN

Passive Forms (advanced) © Chris Snuggs24 March, 2012 Self-testing Structures Practice - building site logs (round) & planks (flat) constructiona bulldozer hillsideto tow away to clearto drag to cut to saw downto survey the route offto prepare to saw upa surveyor into(measuring) instruments up intoto clear the way a sawmillto level the earth GRAPHIC 2 trench to dig (drainage) pipes to lay to connect to fill in to level GRAPHIC 3 to complete safety barriers a traffic sign to put up to use GRAPHIC 1 (VOCAB REVISION) 19 How many trees have been left (standing)? Two trees have been left (standing). Graphic 2 START AGAIN