The New Mexico Environment Department The Department’s Mission is to provide the highest quality of life throughout the state by promoting a safe, clean,

Slides:



Advertisements
Similar presentations
1 Case Study Case Study Watkins Creek Franklin, TN.
Advertisements

LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services.
BAT Work Group. BAT Work Group Goals Develop a procedure for identifying technologies eligible for funding Propose policies and regulation necessary to.
Geothermal Alliance of Illinois Getting it Right the First Time.
Drip System Approvals: County Perspective October 19, Onsite Water Conference Anne Lowry, REHS Chatham County Environmental Health.
Alternatives to Aboveground Effluent Disposal Mounds Overview of the NoMound ® System Technology.
Land Use Program Septic System Overview Scott Weldon
THE Contractual Health Agency for: Bernards Township Bernardsville Borough Chester Borough Long Hill Township Mendham Borough Mendham Township Peapack.
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
HOUSE BILL 89 ONSITE WASTEWATER STAKEHOLDER MEETING 2 nd meeting September 8, 2011 Crystal Lovett, MO DNR Facilitator, and DNR-DHSS Panel.
Basic Installer Course. AOWA:Basic Installer Course Square foot.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Waste treatment. WASTEWATER (Chapter 22) Sewer – Sanitary waste Generated from buildings –Liquid discharged from plumbing fixtures Carried by sanitary.
Georgia underground marking standards
Rural, Onsite & Small Community Wastewater & Waste Engineering Designing Soil Based Systems.
SEPTIC SYSTEM DESIGN. SEPTIC SYSTEM DESIGN Ken Stratton.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
3rd Annual Harris County On-site Wastewater Seminar
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
1 Math Questions. 2 Length x Width x Water Depth = cubic feet.
Welcome Domestic Well Owners Workshop Sponsored by The Nevada Water Resources Association Spring 2011.
Indiana Confined Feeding Operations Permit Program Indiana Department of Environmental Management.
Waste Water Disposal Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 2aWaste Water Disposal and Storm Drainage Chapter 4, 7; Appendix A.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
Wellington County Septic Social!
USING THE NEW REGULATIONS DESIGNING OWTS… Prepared for the Colorado Professionals in Onsite Wastewater (CPOW) 2014 Conference by Roger J. Shafer, P.E.
OutlineBackground Conventional on-site systems Advanced treatment systems.
SITE EVALUATION BASICS OF THE TRADE. Ken Stratton.
Presented by Dwain Butler District Director of Environmental Health Southeast Health District Waycross, Georgia.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 7: Existing Septic Systems: Inspections and Corrective.
Failing Septic Systems: Problems and Solutions Protect Our Waters 2003 Legislative Session Minnesota Center for Environmental Advocacy Minnesota Environmental.
Open Space Residential Development Bylaw Town of Rehoboth.
We are a coastal community. We have beaches and marinas. We have salt marshes and tidal inlets. We have parks with fantastic water views. “ Where the.
NFPA 31 Standard for the installation of Oil- Burning Equipment
My septic system is working just fine! New State Wide Rules Began 1 st of 2015 replacing the 1977 code Goals Update system designs to currently available.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 3: Site Evaluation and Selection 1 MA PHIT- Wastewater.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
TREATMENT PROCESS (Chicago)
Trish and Scott. Trish and Scott are a young couple with two children. Their combined income is $75,000 per year, both have stable careers. Trish and.
 Holds water in the landscape so it infiltrates (drain) into the ground.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
Septic Systems 101 Jennifer Dindinger UMD Sea Grant Extension February 4, 2016.
Ordinance 480-YYY Modifications to Zoning Ordinance 480 regarding On-Site Sewage Facilities (OSSF)
 171 Public wells sampled in 2014  Bacteria and Nitrate samples taken  38 wells inspected (Surveyed)  1 nitrite sample taken.
SENECA COUNTY GENERAL HEALTH DISTRICT 2015 Real Estate Inspection Seminar February 18, 2015.
Soil Considerations for Utilization of Drip Dispersal in Tennessee Division of Ground Water Protection TN Department of Environment and Conservation.
WASTEWATER.
Septic System Overview
OWTS Design Considerations Under Reg. 43
Septic systems.
Chuck Cousino, REHS Onsite Wastewater Program Coordinator
Agenda 2015 Installers Meeting
Homeowner Responsibility
What is an on-lot sewage system?
Maintenance of the On-Lot Sewage System
Tuscarawas County Health Department Operation Permit
Private Septic Systems
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Wastewater Management
Septic System Construction and Location
Private Septic Systems
Presented by: Jon Bellamy
On-Site Wastewater Treatment Systems
What to Expect When You’re Inspected
Homeowner Responsibility
Presentation transcript:

The New Mexico Environment Department The Department’s Mission is to provide the highest quality of life throughout the state by promoting a safe, clean, and productive environment.

The New Liquid Waste Regulations Changes in Construction Requirements Changes in Tank Requirements Lot Size Factors

Construction Requirement Changes  Maximum Trench Length: 150 Feet.  Minimum Amount of Gravel Under Leach Line: 6 Inches.*  Minimum Trench Width: 1 Foot.  No Tree Setback.  Geotextile Fabric Over Leach Line: No Gravel Required to Cover.*  Change: *Up to one foot less gravel.

Construction Requirement Changes  Maximum depth of trench: 6 feet.  Minimum amount of trench cover: 9 inches.  Lateral trenches: Only “D” boxes allowed, no tees. “D” boxes to be internally baffled and internally coated with bituminous material. All leveling and stabilizing requirements still in effect.  Lateral leach lines to begin a minimum of five feet from “D” boxes. (Not new, but of new importance.)

Construction Requirement Changes  Seven linear feet of trench credit allowed. Examples: One foot trench plus 3 extra feet of gravel=7 ft. (new)* Two foot trench plus 21/2 extra feet of gravel=7 ft. Three foot trench plus 2 extra feet of gravel=7 ft. Changes: *more sidewall credit.

Why These Construction Changes?  It has been recognized that we need to rely more on sidewall absorption than on bottom absorption. Also note that the trench depth restriction and reduction of top cover allow more evapotranspiration. These construction design changes allow more liquid to go “sideways” and “up”, rather than “down” towards the water table. They also provide better oxygenation of the effluent. New home stub-outs: discuss.

New Field Sizing`  Multiply GPD by 2 Example: Three bedroom home = 375 GPD x 2 = 750 sq. ft. Etc. ATU’s and proprietary leach field components each allow a 30% leach field reduction, but not both. An ATU with Infiltrators does not get 60% reduction.

Seepage Pits  Seepage Pits may be installed only with a variance from Santa Fe.

Septic Tank Requirements  Manhole covers to be 22 inches at smallest dimension. (Not new.)  All tanks will be installed with manhole risers.  Manhole covers must weigh a minimum of 58 LBS, or be lockable. (Safety against entry by children)  Risers must have child-proof cover retainers, or internal safety devices.  All tanks must have an effluent filter installed, internal or external.

Undeveloped Lots, Platted before 2/1/90  No conventional septic systems on lots smaller than 0.5 acre.  No conventional septic systems on lots smaller than 0.75 acre in areas with depth to ground water 100 feet or less, or within 200’ of public well.

Small Lot Grandfathering Old rule allowed conventional septic systems on lots less than 0.75 acre if platted prior to 2/2/90.

Revised Lot Size Rules Record DateMinimum Lot Size (acre) 2/1/90 to present0.75 Before 2/1/90, developed lot lot size in effect on record date Before 2/1/90, undeveloped lot 0.5 to 0.75, depending on depth to GW, water source, proximity to public well

Greater than 600’ Depth to Ground Water: Minimum lot size of 0.5 acre, no sunset provision. Undeveloped Lots, Platted before 2/1/90

 Sunset Provisions for ’ Depth to Ground Water:  3 year sunset period for lots with on-site wells, not within 200’ of public well  5 year sunset period for lots with public water system, not within 200’ of public well  No conventional septic systems on lots smaller than 0.5 acre.

Greater than 600’ Depth to Ground Water: Minimum lot size of 0.5 acre, no sunset provision. Undeveloped Lots, Platted before 2/1/90

Un-permitted Systems Installed prior to 2/1/02 – certificate of registration for continued operation issued if: system pumped and inspected; system appears to be functioning properly; and the fee is paid.

Un-permitted Systems Installed after 2/1/02 – may be permitted if: system is fully exposed and inspected; system, upon inspection, meets all regulatory requirements; and fee and penalty are paid.

Transfer of Permits Conventional Systems  Permit transferable with property if system inspected and evaluated  No change of ownership notification required Advanced Systems  Permit transferable with property if system inspected and evaluated  New owner must notify NMED and provide valid maintenance contract

Is the Lot Too Small? – The Kicker  When a leach field is built on any lot, There must be enough available space remaining on the lot, including all setbacks, to build a replacement field should the first field fail.