1 National Association of State Veteran’s Homes 2013 Summer Conference September 2, 2013 The TRUTH about Electronic Medical Records Presented by: Veronica.

Slides:



Advertisements
Similar presentations
Quality Management Branch Cady Clark, MSN, RN Branch Manager Claudia Himes-Crayton, BSN, RN Patricia Palm, MS, RNC Nurse Consultants.
Advertisements

Panel Identification Improvement Facilitator Training Session 1 Day 2.
Program Management Office (PMO) Design
Health Insurance Portability and Accountability Act (HIPAA)HIPAA.
CENTRICITY PERIOPERATIVE ANESTHESIA Oregon Health & Science University, Portland, Oregon Stephen T. Robinson, MD Associate Professor of Anesthesiology.
SEVOCITY WELCOMES 1. AGENDA Introductions Key Responsibilities Review of Key Information Major Project Steps – Review 2.
Advancing Excellence in America’s Nursing Homes A Review of 2 Clinical Tools: Pressure Ulcer and Restraints.
PBHCI Project Sustainability Analyzing Clinical Workflows to Support Integrated Care and Seamlessly Maximize Revenue 1:00 – 2:00 PM ET 3/15/2012.
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
SHELLY GUFFEY MAKING THE MOST OF YOUR REVENUE CYCLE MANAGEMENT TECHNOLOGY
1 INTERNAL CONTROLS A PRACTICAL GUIDE TO HELP ENSURE FINANCIAL INTEGRITY.
Security Controls – What Works
Clinical Information System Implementation Project Prepared for Clinical Affairs Committee December 4, 2002.
Managing the Information Technology Resource Jerry N. Luftman
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
Palliative Care in the Nursing Home. Objectives Develop an awareness of how a palliative care environment can be created. Recognize the need for changes.
SCC EHR Workshop for Contractors: Implementation Considerations May 25, 2011.
2015 User Conference How Care Plans Impact your Practice OP User Conference 2015 Presented by: Rena Lefkowitz PA-C Director of Training EHR Session.
Rural Wisconsin Health Cooperative Information Technology Network (Achieving eHealth in Rural Hospitals) eHealth Summit (6/12/08) Prepared by Louis Wenzlow.
MDS. 3.0 IMPLEMENTATION PLANNING The Next “Generation of Quality Services”
Preparing for ICD-10 Transition Teleconference Hosted by Community Health Association of Mountain/ Plains States (CHAMPS) January 30, 2013, 12:00 PM –
Learning with a Purpose: Learning Management Systems Patti Holub, Director District Initiatives and Special Projects Miguel Guhlin, Director Instructional.
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
INTERGRATING TB/HIV DATABASES INTERGRATING TB/HIV DATABASES Presenter: DR. LAMECK DIERO.
Systems Analysis and Design: The Big Picture
Solution Overview for NIPDEC- CDAP July 15, 2005.
1 Addressing Common EHR Implementation Problems June 18, 2010 Tammy Geltmaker, RN, BSN, MHA EHR Consulting Manager, Health Care Excel Bonnie Hollopeter,
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
KIDS & TEENS MEDICAL GROUP L.A. Care: HIT conference October 27, 2009.
Jan Findlay – Staff Nurse/Informatics Patti Tracey- HOBIC Coordinator Dianne Laroche- Clinical Practice Leader/Risk Manager Integrating.
Natick Public Schools Technology Presentation February 6, 2006 Dennis Roche, CISA Director of Technology.
EHR in Long Term Care: Are you ready?.  EHR – Electronic Health Record  Also known as EMR – Electronic Medical Record  Capturing Resident Health Information.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
How Hospitals Protect Your Health Information. Your Health Information Privacy Rights You can ask to see or get a copy of your medical record and other.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
ISO17799 Maturity. Confidentiality Confidentiality relates to the protection of sensitive data from unauthorized use and distribution. Examples include:
Information Systems Security Operational Control for Information Security.
Together.Today.Tomorrow. The BLUES Project Karen C. Fox, PhD Chief Executive Officer.
1 Developing and Implementing Electronic Health Records for Behavioral Health Services Strategic Planning for Providers to Improve Business Practices October.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Auditing Electronic Medical Record Systems
System Changes and Interventions: Registry as a Clinical Practice Tool Mike Hindmarsh Improving Chronic Illness Care, a national program of the Robert.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Handbook of Informatics for Nurses and Healthcare Professionals Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Chapter 5 Technology in the Business Office Copyright © 2011, 2006 Mosby, Inc., an affiliate of Elsevier. All rights reserved.
Mike Hindmarsh Improving Chronic Illness Care California Chronic Care Learning Communities Initiative Collaborative February 2, 2004 Oakland, CA Clinical.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
ORGANIZING IT SERVICES AND PERSONNEL (PART 1) Lecture 7.
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
This material was developed by Oregon Health & Science University, funded by the Department of Health and Human Services, Office of the National Coordinator.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Patricia Alafaireet  Lecture 2 – Implementation and go-live strategies Data conversion Communication Planning Downtime.
Purchasing Cards. What is a Purchasing Card? It is a type of commercial credit card, used by organizations for payment of goods and services. This tool.
Patricia Alafaireet Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health.
Documentation Requirements for Hospital Accreditation -By Global Manager Group.
ADMINISTRATIVE AND CLINICAL HEALTH INFORMATION. Information System - can be define as the use of computer hardware and software to process data into information.
Board Financial Oversight Governing Board Online Training Module.
Hospital Accreditation Documentation Process & Standard Requirements
Chapter 6 Implementation and Evaluation Copyright © 2014, 2009 by Saunders, an imprint of Elsevier Inc. All rights reserved.
What is the Best Way to Select an EHR
Information Systems Selection
RAI and MDS Chapter 16 Red book.
eHealth Summit (6/12/08) Prepared by Louis Wenzlow RWHC ITN CIO
CLINICAL INFORMATION SYSTEM
NWT Asset Management Strategy & Implementation
The present Whether you are using paper and pen to currently gather and store information either clinical or administrative the transition into an Electronic.
WORKSHOP Establish a Communication and Training Plan
Presentation transcript:

1 National Association of State Veteran’s Homes 2013 Summer Conference September 2, 2013 The TRUTH about Electronic Medical Records Presented by: Veronica M. Bencivenga, CPA and Linda S. Little, RN, BSN

2 Today’s Agenda…  The 7 Truths of EMR Implementation  EMR Project Phases  Symptoms of Project Failure  Critical ingredients for Project Success  Disaster Recovery Planning

3 Selecting a vendor is HARD EMR WILL NOT fix poor workflow/performers ALL departments need to be included in planning Training and project management are CRITICAL to success and can be the biggest expense Workflow MUST be changed (process not same as paper) Productivity is REDUCED in the early stages causing overtime and increased staffing EMR is a series of overlapping investments whose benefit accumulates OVER TIME 7 Truths of EMR Implementation: Truth about EMR

4 Key EMR Modules  Care Plans  Physician Orders  Assessments  Progress Notes  e-MAR/e-TAR  Weights/Vitals  Point of Care Third Party Software:  Therapy  QI/QA  Billing/Claims Management  Accounts Receivable  Collections  Referral Management  Patient Trust  Accounts Payable  General Ledger Financial ModulesClinical Modules  Census/ADT  MDS  Document Management  Business Intelligence, Analytics

5 Three EMR Project Phases Phase 1 – Planning Phase 2 – Implementation Phase 3 - Integration

6 Establish Scope, Goals and Objectives Assessment Project Team Vendor Search Project timeline and milestones System build Testing Training Go-Live PHASE 3 INTEGRATION Guide and monitor utilization Training and Re-Training Update policies and procedures QA (QI\QM) Phase 1 PLANNING (3-9 Months) Phase 2 IMPLEMENTATION (3-4 Months) Phase 3 INTEGRATION (6-12 Months) Three EMR Project Phases

7 Start with the end in mind Re-visit often and revise as needed during the Planning Stage Establish Scope, Goals and Objectives Management commitment Utilization of existing systems Effectiveness of current workflow practices Computer skills Current IT Infrastructure (Network, computers, databases, interfaces, etc.) Assessment Interdisciplinary Project Manager Project Team Phase 1 - Planning

8 FACT: There is NO perfect product Decision should be based on: Features, functionality and delivery model that support your organizational goals and objectives (not the bells and whistles) Support provided by the vendor after installation (dedicated support, on-line education, webinars, news letters, etc.) Results of Vendor due diligence including product demonstrations, site visits, reference checks, plans for future product development, financial health and longevity of vendor Vendor Search Phase 1 - Planning

9 Delivery Model Options: Single Solution vs. Multi-Vendor Ability of in-house Software Administrator to manage multiple vendors and interfaces Hosted (ASP, SaaS) VS. Local Understanding of current infrastructure, growth plans and the trade off between control (security/compliance) and cost Vendor Search (continued) Phase 1 - Planning

10 Phase 2 - Implementation Creates the foundation (tables, rules, parameters, security templates etc.) and drives information flow Most clinical data is paper based so a lot of data entry required to populate the initial database (like active medication orders, etc.) Even electronic clinical data is rarely a 1:1 match to new format so manual data entry or manipulation of data required Clinical data that is “imported” or “populated” will not trigger the logic checks and controls in the system System Build Work with Pharmacy, Lab and Radiology vendors to validate information exchange The best testing happens in the first 4-6 weeks after “Go-Live” once real data is in the system Testing

11 Limit training of new information to 4hrs ALL staff, ALL shifts must be trained Offer additional “Open Training” sessions for anyone who needs extra help Work closely with Nurse Scheduler to ensure proper staff coverage during training and distribution of trained staff on each shift (buy her something nice before, during and after training) Training Go-Live when you walk out of training Hands on support of every shift absolutely critical the first few weeks after each module goes live Go-Live Phase 2 - Implementation

12 Phase 3 – Integration Users need to know what to do when they back to their desk Establish process for reporting issues, resolving them and communicating findings back to the users This is evolutionary and should go on for months Guide and monitor workflow/ utilization Establish training policy for new employees Schedule and support re-training and new training for existing employees several times a year Training and Re-training (yes, more training)

13 Phase 3 – Integration Best to update after first year using system as process will evolve as users get better with the system and provide feed back about what works and what doesn’t from the original plan Update policies and procedures Begin utilizing reports ASAP and scrubbing or fine tuning as needed QA (QI\QM)

14 Nursing homes use quality measures to review and improve the quality of the care they give to residents. Clinical measures for nursing home residents, such as the percent of residents with pressure ulcers, with moderate to severe pain, or residents who have changes in their ability to move about. This information is collected as LIVE data and entered in the EMR by the nursing home on all residents and shows how well nursing homes care for their residents’ physical and clinical needs. The EMR system allows for you to organize, track, search and report on your indicators. Quality Measures: (QA/QI) Quality Measures (QA/QI)

15 Indicator Data Set-up To identify trends, patterns and exceptions Measurable Real time data Indicators Track tasks and progress of any improvements to address trends and patterns identified Valuable insight into Clinical issues Utilization of facility specific data for QA Quality Improvement Interdisciplinary Can be broken down by Diagnosis, Unit, Staff, Assessment etc… Accurate data leads to quality information that is required for quality decision making and resident care. Reports Quality Measures (QA/QI)

16 Quality Measures (QA/QI) Nursing home quality measures have four primary purposes: 1.Help you choose a nursing home for yourself or others; 2.Understand care at nursing homes where you or family members already live; 3.Facilitate discussions with nursing home staff regarding the quality of care; and 4.Provide data to help with quality improvement efforts. The nursing home quality measures come from resident assessment data, that collected into the EMR provides real time documentation. Real time data provides the most accurate information. The assessment data is converted to develop quality measures that give consumers another source of information to show how well nursing homes are caring for their resident's physical and clinical needs.

17 Quality Measures (QA/QI) QA monitoring is critical for early detection of care delivery issues, ensuring complete and timely records, and auditing workflow processes. Track new antibiotic orders, Infections report; UTI monitor to assist with the identification of UTI’s which is now being used as part of fall assessment Monthly Report of Nosocomial Infections – which calculates monthly attack rate, break down by unit as well as individual type of infections; PT/INR orders for all Residents on Coumadin. O2, G/T and Foley audits, Restraint audit, Hypnotic/psychotropic review, –look for any antipsychotics that are ordered PRN. Review chart to ensure order has a specific duration (i.e.,1 week, and have appropriate documentation in place). Identify if the facility is triggering any specific areas that might need improvement (i.e., falls, pain etc…)

18 Quality Measures (QA/QI) QA monitoring (continued): Weight loss reports to identify causes and prevent further losses Occurrence Reports to facilitate identification of trends and causal factor Foley Catheter Use and UTI’s Advance directive reports ; Reports to ensure all documentation requirements by Physicians have been completed CNA ADL coding to insure capturing of highest RUG

19 Symptoms of Project Failure An IT project has failed when: –The users are happy because they can make the new system work just like the old system (successful failure) –Users are “working around” the system to get their job done, creating inefficiencies –The users are utilizing less than 20% of the functionality of the system after 6 months (the Menu Test) –No critical business processes were changed during the project –Users can’t identify 3 ways the new system is better than what they had before

20 Critical ingredients for EMR success: –Project Management Utilize internal or external resources to keep the project on target and moving forward –Sufficient planning Understand the scope of the project and the effect on the organization’s operations Evaluate and improve core business processes. Goals need to be clear and changes need to “make sense”. –Commitment EMR adoption is an ongoing process, budget resources for future maintenance and development Training, training and more training Designate a “Software Administrator” –Manage expectations Guide expectations of all stakeholders (staff, department heads, Owners, Board of Directors, etc.) with respect to what can be achieved, by whom and when Critical Ingredients For Success

21 Managing EMR Expectations: –Timeframe No instant gratification – multiple stages over months or years –Productivity/Workflow Workflow WILL/MUST change Users will experience inefficiencies at various stages of the project (expect overtime) There will be trial and error Won’t fix poor performing employees –Resources Clearly identify point person ANNUAL BUDGET for project management, hardware, initial training, on-going training –Compliance Monitor and enforce consistent utilization by all users Update Policies and Procedures, Staff education, etc. Tie compliance to job performance Critical Ingredients For Success

22 Disaster Recovery Planning

23 Disaster Recovery Planning Disaster Recovery:  The process, policies and procedures related to preparing for recovery or continuation of technology infrastructure critical to an organization after a natural or human-induced disaster. Types of Disasters you should be prepared for are :  Accidental or Malicious Deletion of Data  Communication Failure  Data or Software Corruption  Fire and/or Water Damage  Hard Drive Failure  Theft or Vandalism

24 Disaster Recovery Planning Business Continuity Planning:  A plan for how to recover and restore partially or completely interrupted critical functions within a predetermined time  Focus on Mission Critical Infrastructure (MCI) (data, software, equipment)  How long to restore MCI (the faster you need it, the more it costs)

25 Disaster Recovery Planning EMR Considerations:  Different from other Systems (Payroll, Billing)  Downtime is not an Option Contingency Planning:  A Paper Backup Plan – Need process for: –Printing treatments and orders –Documenting on paper –Pushing paper back into the system –Audit for completeness after emergency over  Expect the need for paper backup –Practice the Plan –Be prepared to revise as needed

26 Disaster Recovery Planning Key Site Issues:  Power –Perform generator tests –Identify changes to “e-outlets” since implementing EMR (may need to add or reallocate existing)  Communication – Internet –Establish redundant internet connectivity –Have Wi-Fi hot-spot (3g and 4g) or wireless cards –Have local (plug-in play) printers available

27 Questions? ? Thank you.

28 Veronica M. Bencivenga, CPA Office (631) Cell (631) Linda S. Little, RN, BSN Office (631) Cell (631) HMM Consulting a Division of Horan, Martello, Morrone P.C.