Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
PoA Challenges & Opportunities
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Regional Distribution
PoA AFTER Cancun - READY TO TAKE OFF NOW
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
UNFCCC secretariat Overview of the PoA and business models Training-Workshop on the “Uganda Municipal Waste Compost Programme” 21st -24th Oct 2013, Mukono.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROCESS TO P REPARE AND I NCLUDE CPA S UNDER A CDM P O A.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
Programmatic CDM Joergen Fenhann DFC 9. August 2011.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Reporting on SD co-benefits using the new CDFM SD Tool and opportunities for monitoring to enhance the profile of CDM projects and CER price: what the.
Capacity Development Work plan for the Clean Development Mechanism in Uganda ROLES AND COMPOSITION OF THE DESIGNATED NATIONAL AUTHORITY (DNA) Presented.
CDM Type Micro-hydro Projects: A Case Study National Workshop on Capacity Development for the Clean Development Mechanism (CDM) Eugenio Lopez Conference.
Compilation and analysis of available information on ways and means to enhance equitable regional and subregional distribution of projects under the clean.
UNFCCC Roles and structure of Designated National Authorities (DNAs) Fabiana Rodrigues, UNFCCC secretariat Regional Workshop - Latin America and the Caribbean.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
UNFCCC Secretariat From PoA to NAMAs - Co-existence (opportunities and challenges) Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
UNFCCC secretariat From CDM to NAMAs – Synergies between CDM and NAMAs Perumal Arumugam Latin American Carbon Forum, Bogota (03 – 05 Sep 2014)
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
Activities on regional distribution of Clean Development Mechanism (CDM) Projects With reference to LDCs.
KfW Carbon Fund From PoA to NAMA Barcelona 31th of May 2011.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Clean Development Mechanism
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Presentation transcript:

Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda Municipal Waste Compost Programme” 21st -24th Oct 2013, Mukono Municipality, Uganda UNFCCC secretariat SDM programme

Outline PoA-DD and CPA-DD preparation LoA issuance Validation Presentation title Presentation title Outline PoA-DD and CPA-DD preparation LoA issuance Validation CPA inclusion The requirements on demosntration of additionality and deveolpment of EC for PoAs are set in the integrated PoA Standard, ‘Demonstration of additionality, development of eligibuility criteria and application of multiple meths for PoAs.‘ In this ppt we will focus only in the Additionality and EC part of the stnd. 2

CDM Project Cycle Post-Registration Changes Presentation title Project design National approval Validation Registration Verification / certification Issuance of Certified Emission Reductions (CERs) Monitoring Coordinating/Managing Entity (CME) Designated national authority (DNA) Designated operational entity (DOE) CDM Executive Board (CDM EB) Step Who’s responsible Post-Registration Changes

PoAs documentation CME – coordinating or managing entity CPA – CDM programme activity PoA-DD: PoA design document CPA-DD: CPA design document

PoAs documentation The PoA-DD consists of 2 parts: • Part I: framework description, Additionality, Eligibility Criteria, Environmental impact, PoA duration, methodology applied etc. • Part II: generic CPA-DD, information applicable to all CPAs to be included in the PoA. Part II serves as the TEMPLATE for future specific CPA PoA-DD: PoA design document CPA-DD: (specific) CPA design document

1. PoA-DD and CPA-DD preparation Part I Programme of activities (PoA) SECTION A. General description of PoA SECTION B. Demonstration of additionality and development of eligibility criteria SECTION C. Management system SECTION D. Duration of PoA SECTION E. Environmental impacts SECTION F. Local stakeholder comments SECTION G. Approval and authorization 6

1. PoA-DD and CPA-DD preparation PART II. Generic component project activity (CPA) SECTION A. General description of a generic CPA SECTION B. Application of a baseline and monitoring methodology Repeat Part II for more project types designed in the PoA 7

Virtually same to the normal project activity, except 1. PoA-DD and CPA-DD preparation Specific CPA-DD SECTION A. General description of CPA SECTION B. Environmental analysis SECTION C. Local stakeholder comments SECTION D. Eligibility of CPA and Estimation of emissions reductions SECTION E. Approval and authorization CPA Virtually same to the normal project activity, except eligibility criteria 8

1. PoA preparation-Eligibility Criteria What is it? It is the criteria for CPA inclusion 2. How shall it be formulated? According to the PoA Standard, including 12 aspects. 3. Who shall develop them? CME Is it in Uganda? Some aspects for EC The geographical boundary of the CPA The specifications of technology/measure Conditions to check the start date of the CPA Demonstration of additionality 9

1. PoA preparation-Additionality Concept To establish that in the absence of CDM PoA, none of the implemented CPAs would occur. 2. The ways for demonstrating additionality Three categories of project scales Large scale; Small Scale (<15MW); Micro Scale (<5MW) Different procedures for additionality demonstration For Large scale, requirement in methodology and Tools – CDM will help overcome barriers including financial/economic, technological, prevailing practice barriers For Small Scale, simplified requirement For Micro scale, automatic additionality Positive list per technology type (automatic additional) e.g., Solar PV, Micro hydro, biogas (<100 kW) 10

Presentation title 2. LoA issuance The CME shall obtain a letter of approval from the DNA of each Party involved in the proposed CDM PoA, confirming that: The Party is a Party to the Kyoto Protocol; and Participation in the proposed CDM PoA is voluntary. confirm that the proposed CDM PoA assists the host Party in achieving sustainable development. The CME shall obtain from each host Party a letter of authorization of its coordination of the proposed CDM PoA. 11

Presentation title 2. Validation There are many commonalities in validation process of normal CDM projects versus PoAs. The documentation required for the PoA validation consists of: The PoA-DD (PoA Design Document). The first CPA-DD (CPA-DD), which is the PDD of the CPA from a first concrete case Institutions involved Coordinating/Managing Entity (CME) CDM consultant (if any) Designated Operational Entity (DOEs) 12

2. Validation Two important features only apply to PoAs: Presentation title 2. Validation Two important features only apply to PoAs: Validation of CME management system (a) Roles and responsibilities of personnel, including competencies; (b) Training and capacity development for personnel; (c) A procedure for technical review of inclusion of CPAs; (d) A procedure to avoid double counting; (e) Records and documentation control process; (f) Continuous improvements of the PoA management system. Eligibility criteria 13

Presentation title 3. Registration The PoA and at least one real CPA submitted for registration. Board considers registration/issuance for PoA as normal projects, not CPAs individually DOE after concluding a positive validation process, shall submit the PoA through a dedicated interface on the UNFCCC CDM website 14

3 Registration 7days 23days Publish 2011-03-12

Registration Fee Fees are to be paid by the CME to the secretariat. The registration fee covers the Executive Board’s administrative expenses Fees are to be paid by the CME to the secretariat. The registration fee is: − 10 US cents per CER issued for the first 15,000 CERs − 20 US cents per CER issued for any amount in excess of 15,000 CERs for a given year • The maximum registration fee is $350,000

Exemption of registration fee Project activities and PoAs hosted in least developed countries. In the case of PoAs hosted not exclusively in LDCs, only for the issuance of CERs in CPAs hosted in LDCs; The registration fee for a PoA based on total expected annual CERs of the specific CPA(s) submitted together with the request for registration of the PoA. No registration fee shall be payable for Projects in countries with fewer than 10 registered CDM project activities; and None of these projects received issuance

No need to submit to the Board for further check Presentation title 4. CPA inclusion Inclusion of more CPA Step 1: CME ensures that the CPA meet the eligibility criteria; Step 2: CME submits CPAs to DOE Step 3: DOE confirms Step 4: DOE uploads to UNFCCC Website No need to submit to the Board for further check 18

Presentation title THANK YOU! UNFCCC secretariat, SDM programme

Loan scheme › Operated by UNOPS and UNEP RISOE Centre on behalf of UNFCCC › Funded via CDM Adaptation Fund › Increase the regional distribution of CDM › Projects from LDCs or from countries with fewer than 10 registered CDM Projects Funding Mechanism › Interest free loan for CDM transaction costs (Validation, Registration, Verification) › Repayment usually 1 year after start of Verification process