Preliminary DFIRM Community Coordination Meeting November 10, 2005 ESCAMBIA COUNTY, FLORIDA Preliminary DFIRM and FIS Text.

Slides:



Advertisements
Similar presentations
In coordination with FEMA Kickoff Meeting Riverside County, CA May 27, 2010.
Advertisements

Flood Map Modernization in North Dakota North Dakota State Water Commission FLOOD MAP MODERNIZATION.
Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
FEMA’s Flood Risk Review Meeting: Building Confidence in Risk MAP Products 2012 ASFPM National Conference San Antonio, Texas May 24, :00 pm.
Land Boundary Information System: Navigating the New Website LABINS.org FLURISA Webinar January 21, 2015 Lamar Evers, PSM Florida Department of Environmental.
FEMA Region II Morris County Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division April 28th, :00-11:00 or 14:00-15:00.
Scoping the North Carolina Cooperating Technical State Project Ed Curtis, P.E., CFM, North Carolina Division of Emergency Management Jerry Sparks, P.E.,
Pierce County, WA DFIRM Update Fife City Hall rd Street East Fife, WA March 18, 2014.
North Carolina Floodplain Mapping Program Cooperating Technical State.
Mapping On Demand Federal Emergency Management Agency (FEMA) Map Modernization and the Post-Preliminary Process Escambia County, Florida PDCC Meeting November.
The Risk is Real… Be PREPARED! Robert Billings, PE, PH, CFM Flood Mitigation Project Manager Charlotte-Mecklenburg Storm Water Services May 18, 2011 Briar.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Duval County: Using the power of SWMM unsteady modeling for CLOMR applications May , Louisville KY José Maria Guzmán, P.E. D.WRE Gaston Cabanilla,
Georeferencing Rapid Bio-Assessment Survey Data: GIS Applications in the Upper Nehalem Watershed, Oregon. William Vreeland Earth and Physical Sciences.
1 Changes to Alabama Flood Maps Impacts to Flood Insurance Presented By: Leslie A. Durham, P.E. ADECA Office of Water Resources January 23, 2014.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
The West Virginia Flood Hazard Determination Tool: History and Progress WV GIS Technical Center West Virginia University Eric Hopkins, Lead GIS Specialist.
South Carolina Department of Natural Resources Flood Mitigation Section South Carolina Map Modernization Initiative Update Pee Dee GIS Users Group Meeting.
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
Directions to Camera Point: Starting in the parking lot, cross the driving bridge and turn right downstream toward the third light post on the left. Stand.
Oregon Flood Hazard Data Standard v2.0 Summary of Proposed Amendment Collaborative Effort of: Jed Roberts (DOGAMI), Steve Lucker & Christine Shirley (DLCD)
The Lower Coquille Watershed, part of the Coquille Basin is located in Southwest Oregon in Coos county (see figure 1). The Coquille River is the major.
Proven People... Proven Technology... Proven Results Digital Flood Insurance Rate Map Panel Management Module Katherine Hermann, CFM, Dewberry Ken Logsdon,
Utilizing a Basinwide Approach for the North Carolina Flood Mapping Program John Dorman, Program Director, NC CTS Flood Mapping Program Gib Jones, P.E.,
Flood Risk Mapping Project Editorial Board Meeting [COMMUNITY NAME]
Idaho Risk MAP Activities Ryan McDaniel, CFM Cooperating Technical Partners Coordinator Idaho Department of Water Resources.
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
CHAPTER 3 MAPS AND MAP CHANGES
Tillamook County, OR Flood Study Board of Commissioners’ meeting June 23, 2010.
Map Modernization Management Support Best Practices Project - FEMA State of Idaho Idaho Department of Water Resources Boise, Idaho November 2008.
FLOOD STUDY Chemung County, NY FEMA REGION II November 18, 2010.
Coordinate Systems & Vertical Datum Issues
FLOOD STUDY Rockland County, NY
North Carolina CTS Committee Meeting #9 June 19, 2001.
FLOOD STUDY Oswego County, NY FEMA REGION II February 7, 2011.
Georgia Flood M.A.P. Program
1 US Army Engineer Research and Development Center FEMA REGION III COASTAL MAPPING PROJECT May 19, 2011 Coastal Analyses and Outreach Robin Danforth, FEMA.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
FLOOD STUDY Cumberland County, NJ FEMA REGION II February 22, 2011.
North Carolina White Oak River Basin Plan December 19, 2000.
FEMA Region II Essex County, NJ Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division July 14th, :00-11:00.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Map Modernization June 11,  Obtain Best Available Data  Develop Partnerships for Production that Enhance Capability (local, state, fed)
Office for Information Resources GIS Services Flood Map Modernization and the Tennessee Base Mapping Program Dennis Pedersen, Director F&A, OIR – GIS Services.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Information Exchange Sessions [DATES]
A Total Water Resource A division of Hayes, Seay, Mattern & Mattern, Inc. North Carolina Floodplain Mapping State of North Carolina North Carolina Floodplain.
FEMA Region II Somerset County, NJ Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division June 24th, :00-11:00.
FEMA FLOOD INSURANCE STUDY UPDATES City Council Workshop July 7, 2008.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
North Carolina Pasquotank River Basin Plan Final Scoping Meetings May 17 and 18, 2001.
Passaic County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 6th, :00-11:00.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
DFIRM Prototypes State of North Carolina March 20, 2001 North Carolina Floodplain Mapping State of North Carolina.
Discovery Meeting FEMA Region [#]. 2 Introductions.
USGS Water Resources Discipline Charleston, WV District office Katherine Paybins GIS data and projects.
FLOOD STUDY Burlington County, NJ FEMA REGION II November 29, 2010.
FLOOD STUDY Salem County, NJ FEMA REGION II February 22, 2011.
Cape May County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division September 29th, :00-11:00.
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
1 Homeless Outreach Initiative K’yone Johnson, Health Educator Communications, Health Education and Nutrition Florida Department of Health in Escambia.
FEMA Risk MAP City of Yakima – Lower Yakima Discovery Information Exchange Session May 9, 2016.
North Carolina Unique or Not?. Absolute Location: Between 33 degrees North and 37 degrees North latitude; between 75 degrees West and 85 degrees West.
North Carolina Lumber River Basin Plan
Florida’s Water Management District Permitting Website
Risk MAP & the Little River Basin
Floodplain Delineation of Unsteady Flow Using HEC-RAS
<<County Name>> <<Date>>
Flooding in Glendive, MT By: Clay Woods
FEMA FLOOD INSURANCE STUDY UPDATES
Presentation transcript:

Preliminary DFIRM Community Coordination Meeting November 10, 2005 ESCAMBIA COUNTY, FLORIDA Preliminary DFIRM and FIS Text

PDCC Meeting Agenda  Introductions and Welcoming Remarks  Overview of DFIRM Project  Preliminary DFIRM Changes  Post Preliminary DFIRM Processing  Questions and Comments

Overview of DFIRM Project  Scoping Meeting  Outreach Meetings  Preliminary DFIRM Distribution  30 Day Review Period

Preliminary DFIRM Changes  Base map  Digital product  NAVD 88  New detailed study streams  Floodplain re-delineation (inland streams)  Revised inland extent of coastal influence

Preliminary DFIRM Changes Base Map  2004 USGS Digital Orthophoto Quarter Quads (DOQQ)  State Plane Coordinate System (Florida North)

Preliminary DFIRM Changes Digital Product  ArcGIS 9  Spatially referenced

Preliminary DFIRM Changes NAVD 88  Conversion factor of -.03 feet for mainland  Conversion factor of -.16 feet for western barrier islands  Conversion factor of -.30 feet for eastern barrier islands

Preliminary DFIRM Changes New Flood Studies  Tributary to Eleven Mile Creek  Carpenters Creek  Tributary to Carpenters Creek  4 tributaries to Bayou Grande  2 tributaries to Bridge Creek

Preliminary DFIRM Panel No Tributary to Elevenmile Creek -

Preliminary DFIRM Panel No Carpenters Creek and Trib to Carpenters Creek -

Preliminary DFIRM Panel No Carpenters Creek and Trib to Carpenters Creek -

Preliminary DFIRM Panel No Tributary to Bridge Creek -

Preliminary DFIRM Panel No Tributary 4 to Bayou Grande -

Preliminary DFIRM Panel No Tributary 4 to Bayou Grande -

Preliminary DFIRM Panel No Tributary 3 to Bayou Grande -

Preliminary DFIRM Panel No Tributaries 1, 2 and 3 to Bayou Grande -

Floodplain Re-delineation