Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.

Slides:



Advertisements
Similar presentations
First you need to know some facts about air and water: 1. Water evaporates and is called water vapor which behaves like all other gases. 2. When any gas.
Advertisements

CHAPTER 45 Engine Lubrication.
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Refrigerators.
Safe Use and Operation of Vacuum Lines
Basic Refrigeration Cycle
OPERATION OF A PORTABLE VACUUM SYSTEM Written by Dr. Richard Potts Modified by Ruth Dusenbery, Dawn Wisniewski, and Pranjal Patel University of Michigan-Dearborn.
How would you explain this on the 3394? If Fire Erupts on YOUR Boat If Underway, stop the boat Have everyone who is not wearing a PFD put one on Position.
Sessler Group Safety Talk Safe Operation of Vacuum System for Avoiding Danger of Liquid Oxygen Ren-Tsung Wu October 23 rd,
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Heavy Liquids Separation. Heavy Liquids Overview Methylene iodide (MI; ρ = 3.32 g/cm 3 ) is used to concentrate material according to density. When added.
Chapter 5 Simple and Fractional Distillation
CHANGE OF PHASE Matter exists in three common phases: solid, liquid and gas.
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
Automotive Fuel and Emissions Control Systems 3/e By James D. Halderman Copyright © 2012, 2009, 2006 Pearson Education, Inc., Upper Saddle River, NJ
Rothberg Group Safety Information Safety Information –Motivation for safety rules –Material Data Safety Sheets (MSDS) –Rothberg Group WebpageRothberg Group.
Heating and cooling BADI Year 3 John Errington MSc.
1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
1. Safe Use and Operation of Vacuum Lines, UCLA Chemistry and Biochemistry 2.
Introduction to Operation of the XL- 30 Scanning Electron Microscope Tutorial # 2 Introduction to Operation and Imaging.
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
STEAM HEATING.
Autoclave Use and Safety
Accessories Planned Maintenance. Types l Humidifiers l Air Cleaners l Heat Recovery Ventilators l Condensate Pumps.
Solar Cell conductive grid and back contact
Respirator Safety This Training Covers Respirator Inspection User Fit Checks Respirator Cleaning Respirator Storage.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Left side compressor behind Left control box Right side compressor behind Right control box.
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
EVAPORATIVE EMISSION CONTROL SYSTEMS
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Experiment 9. Liquid-Vapor Equilibrium in a Binary System The vacuum manifold used in this experiment is shown here. The main stopcock isolates the system.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Automotive Heating and Air Conditioning CHAPTER Automotive Heating and Air Conditioning, 7e James D. Halderman | Tom Birch SEVENTH EDITION Copyright ©
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Advanced Engine Performance Diagnosis, Fourth Edition James D. Halderman Copyright ©2009 by Pearson Higher Education, Inc. Upper Saddle River, New Jersey.
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
Power Brakes chapter 62. Power Brakes FIGURE 62.1 Typical vacuum brake booster assembly. The vacuum hose attaches to the intake manifold of the engine.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
SMaRT: Soft Matter Research & Technology Group Safety: Vacuum Oven Solvent Trap 2/11/
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Hao Guo LINAC Department Institute of Modern Physics.
Shape Memory Alloy Thermomechanical Testing ME356 Spring April 2016.
Air condition installation
Planned Preventive Maintenance for Fridges To improve your fridge’s function do the following tasks all the time: 2) Defrost your fridge once a month OR.
Safe Use of Schlenk and Vacuum Lines
Holders and Pumps Summary
Installation of the T600 at Fermilab
Automotive Heating And Air Conditioning
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
SAES Project: Combination of NEG module and sputter ion pump
EVAPORATIVE EMISSION CONTROL SYSTEMS
Physical chemistry experiment
Safety presentation for DNI
R1 Fundamentals of Refrigeration
Experiment 9. Liquid-Vapor Equilibrium in a Binary System
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Instructions: Adding refrigerant fluid to system
Presentation transcript:

Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that have dense hydrophobic surfaces, or if the atmospheric humidity is low. It is recommended for work with porous systems, such as polymer films or more hydrophilic systems (e.g., graphene, CNTs) that require annealing and transfer under Ar before the FTS deposition). Outside glove box Liquid nitrogen trap In-line filter with stainless steel wool trap Chemically resistive mechanical pump using Fomblin oil Pumping direction Bellow valve (FTS container) FTS container (1-2 cc) Electrical feed-through for measurements (KF-40 flange with vacuum BNCs) FTS deposition chamber with samples inside (KF-40 full nipple) FTS-deposition Chamber Configuration (all the flanges are KF-25 unless indicated otherwise)

Optimized procedure for deposition of FTS self-assembled monolayer on rubrene: For the original paper, please see: M. F. Calhoun et al., Nature Mater. 7, 84 (2008). 1. Place samples in the FTS deposition chamber properly. Connect the monitoring sample (with contacts and wire leads) to the electrical feed-through connectors and check the connectivity. Start the program monitoring sample’s conductivity. Assemble the rest of the system as shown in the figure. 2. Make sure that the FTS container valve is closed. Load an appropriate amount of liquid FTS (Sigma Aldrich #448931) to the FTS container: a few drops for a short-time treatment to achieve a partial coverage and somewhere between 1/3 and 1/2 of the container for a long treatment to get full coverage. Attach the container to the deposition system properly as shown in the figure. 3. Turn on the mechanical pump and open the liquid nitrogen trap & pump valve (but not the FTS container valve). Pump the deposition chamber for 40 minutes. 4. Fill the cold trap with liquid nitrogen and wait for another 10 minutes. 5. Slowly open the FTS container valve and leave it open for 1 min, while the mechanical pump is pumping the chamber through the cold trap. This removes the small amount of air trapped in the FTS container and activates rapid evaporation of FTS molecules filling the chamber with FTS fume. 6. After 1 min, close the liquid nitrogen trap & pump valve. 7. Turn off the pump and disassemble the liquid nitrogen trap. Leave all parts of the trap under a well ventilated hood. Clean all parts after they reach room temperature. 8. When FTS deposition is done (which you monitor in-situ by conductivity measurements), close the FTS container valve. 9. Assemble the thoroughly cleaned liquid nitrogen trap and connect it to the system as shown in the figure. Turn on the pump and wait for 10~20 minutes, then add liquid nitrogen and wait for another several minutes. 10. Slowly open the liquid nitrogen trap & pump valve and pump the deposition chamber for 30 minutes to remove the FTS fumes and FTS accumulated on the inner walls of the chamber. Keep sufficient amount of liquid nitrogen while pumping (refill the trap when necessary). 11. Close the liquid nitrogen trap & pump valve. 12. Turn off the pump and disassemble the liquid nitrogen trap. Leave all parts of the trap under a well ventilated fume hood. Clean all parts again after they reach room temperature. 13. Stop the electrical measurements. Carefully open the FTS chamber to the atmosphere (or Ar, if you work under Ar). Remove samples. 14. Remove the FTS container and clean it with acetone. 15. Reassemble the deposition system, including the FTS container and the cold trap. 16. Pump the chamber for 10 minutes with both valves open. Close both valves and turn off the pump. Store the empty chamber in this closed condition when not in use to slow down degradation of parts.

Important notes: 1. For high-quality full-coverage FTS deposition, cleaning all the parts on the right side of the PVC hose (see the figure), including O-rings, chamber parts, the FTS container valve and the electrical feed-through connectors, is recommended each time before deposition. Clean the PVC hose as well if necessary. 2. Check the base pressure of the clean, dry and fully assembled empty chamber (w/o FTS or samples) regularly before each treatment. FTS deposition failure is usually due to a poor vacuum. In our experience, the base pressure in a cleaned and fully assembled chamber of our size is  Torr after a 40-min pumping plus adding liquid nitrogen to the trap. After a few uses, the pressure becomes 1-2  Torr, which in our experience is sufficient for a high-quality FTS deposition. Condition of the pump oil and the stainless steel wool trap should be checked regularly. Do not use a vacuum gauge for pressure measurements in-situ while doing FTS deposition, because it may cause corrosion of the gauge. 3. When not in use, keep the deposition chamber fully assembled and under vacuum. Typical current as a function of time curve recorded during the FTS deposition for a 2-probe pristine rubrene sample. Voltage applied is V = 1 V, distance between the contacts L = 3 mm, width of the crystal W = 1 mm. Exposure to FTS vapor Same data on a semi-Log scale  2D = 1.2·10 -5 S/