Manchester Occupational Health & Safety Group Noise as a Health & Safety Issue in Cash in Transit Vehicles Dave Y Marsden, MSc, MIOSH, MCMI Regional Services.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Commercial in confidence Regional Collaboration – Fleet Management Project Progress Summary Duncan Kinnaird Project Lead.
Quality Management Training Quality circles Bench Mark Kaizen.
Environmental Management System Implementation
[Organisation’s Title] Environmental Management System
Buying Better Outcomes Workshop 4 Equalities and Contract Management If you do not take it seriously, why should the supplier?
Wheelchair and Passenger Restraints Your Logo Here A straightforward presentation to be viewed at your leisure, but not to be ignored. Working with equipment.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Network Design and Implementation
WELCOME MANAGING ATTENDANCE GOVERNOR / PRINCIPAL TRAINING MARCH 2012.
SAFETY & QUALITY MANAGEMENT IMPROVE SAFETY WITH QUALITY & PRODUCTIVITY BENEFITS Dave Copley, Matt Pierce.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
1 ISE Ch. 22 Managing an Ergonomics Program History of Ergonomics Programs  1993: OSHA Ergonomics Program Management Guidelines for Meatpacking.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Human Resource Auditing
SkillsTech Australia Records & Reports Stage 2 Units: UEEPOO1,2,3B
1 Module PLANNING AND ORGANIZING EXTERNAL QUALITY ASSESSMENT.
SAFA- IFAC Regional SMP Forum
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
HSE Management Standards and Stress Risk Assessment Hertfordshire County Council
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
1December 14, 2006Identifying Preferred Suppliers A Training Tool on Supplier Selection By Kira Connell Bus M 361.
Effectiveness Day : Multi-professional vision and action planning Friday 29 th November 2013 Where People Matter Most.
Hazard Identification
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Introduction to ISO New and modified requirements.
Basics of OHSAS Occupational Health & Safety Management System
Releasing Time to Care: Implementation with the Southern HSC Trust Kay Carroll Lead Nurse, Southern HSC Trust Sharon Kennedy Ward Manager, Southern HSC.
Special Education Program Review Findings – Lansing Central School District Prepared by: Rosemary Olender NYSSBA AdvisorySolutions Consultant Thursday,
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
Policy and Procedure Inspector Christian Ellis. Policy Statement About Policy It is best practice to have up to date, clear and standardised policies.
Integrating Safety Management Systems – Opportunities for Improvement
A Feasibility Study of a Unified Library Management System for NHS Scotland - A Progress Report Laura McCaig, Information Manager, E-Library Communicators.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Progressing from labour market intelligence reports to HE level provision that is well supported by employers Marchmont Observatory, Exeter University.
Environmental auditing
Presented by Linda Martin
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
Important informations
THROUGH 2011 AND BEYOND…. A briefing for staff.  Explain what’s happening locally and nationally  How it may impact on us and our patients  Share our.
SE-SURG South Essex Service User Research Group. Employment - what's it got to do with mental health?
College of Agricultural Sciences & Hatfield Marine Science Center Business Center May 7, 2009.
CRS Australia How to negotiate Assistive Technology Options with Employers.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
SEYCHELLES EXPERIENCE Hon. Nichole Barbe, PAC Member, Seychelles.
1 IT Technical Support The impact of organisational policies on diagnosis and repair.
Kerry Cleary An evaluation of the impact of Values Based Interviewing at the OUH Values Based Conversations and wider engagement strategies.
National audit of learning difficulty in- patient services 2007 Fiona Ritchie.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Coordinate On-The-Job Instruction Rick Bough Sarah Britton.
THINK EFFICIENCY Administration Review Customer & Support Services Scrutiny Committee 24 th November 2008.
College of Agricultural Sciences & Hatfield Marine Science Center Business Center May 13, 2009.
Chapter © 2015 Pearson Education, Inc. Publishing as Prentice Hall.
3D LEISURE - Health & Safety Refresher Training Manual.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
VICH Training Strategy Steven D. Vaughn, DVM Director, Office of New Animal Drug Evaluation, Center for Veterinary Medicine U.S. Food and Drug Administration.
Substance Misuse Policy Replaces the Alcohol and Substance Misuse Policy. New policy triggered by updated drug driving laws – but gave opportunity for.
Governor Support Service Training Governor Workshop 31 st March 2016 As a service we have a responsibility to enable all governors to access appropriate,
Report on the evaluation of the Independent prison Visitors System by Ms Jacqui Gallinetti, CLC UWC.
MENCAP PATHWAY EMPLOYMENT SERVICE LLDD RESEARCH PROJECT Working in Transition LLDD RESEARCH PROJECT Working in Transition.
Cleaning Reforms Area Based Cleaning Model.
WORK RELATED STRESS: CASE STUDIES
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Chapter 4 Systems Planning and Selection
Operating and Maintenance Contracts Breakout Session
Aftermarket Parts and Services
How to conduct Effective Stage-1 Audit
Presentation transcript:

Manchester Occupational Health & Safety Group Noise as a Health & Safety Issue in Cash in Transit Vehicles Dave Y Marsden, MSc, MIOSH, MCMI Regional Services Manager, Safety Health & Environment

Introduction Developing the idea Methodology Data Presentation & Analysis Discussion of the Results Recommendations & Conclusion The Situation Now

Developing the idea The research resulted from allegations, comments & complaints from Cash in Transit crews about the excessive noise in their vehicles. The forthcoming Control of Noise Regulations 2005 (due February 2006) Literature review

Methodology A relatively small study Aims of research (Based on the literature review ) 1. To ascertain the actual noise levels experienced by crews in CIT vehicles 2. To consider how noise levels affect the crews experiencing them 3. To ascertain what is the crew perception of noise Methods

Data Analysis & Presentation Actual Data -42 Vehicle Tests (22% of northern fleet) from 5 sites -Approx. 250 operational hours noise data Structured Interview Data -Interviewed all crews of the vehicles tested (84 people) -Length of interviews varied Questionnaire Data -Issued Questionnaires to Crews 356 -Returned Questionnaires from Crews 129 -%age Returned 36.24%

Data Analysis & Presentation

Discussion of the Results Lack of Care for Crews Actual Noise vs. Perceived Noise Effects of noise on the person

Recommendations & Conclusion Before the formal recommendations were finalised it was felt that some further work was required:- -Scope the problem -Noise Perception -Vehicle design & specification -Management issues -Fault Reporting

Summary of Recommendations 1. Urgent consideration of spending necessary to ensure compliance by February Escalation of noise testing should take place immediately, to find actual scope of the problems facing the business. Plan to ensure compliance by 2006 of all vehicles to be developed and instituted. 3. A formal noise testing regime needs to be instituted for periodic testing of all vehicles. 4. Fault reporting procedures must be reviewed, including a central record of security faults and an audit trail of reporting. 5. Communication with all levels of staff must take place about their responsibility for health and safety of the workforce.

Summary of Recommendations (con’t) 6. Discussion with technicians, mechanics and manufacturer should start immediately regarding technically feasible modification to vehicles including incorporation of crew informed solutions. 7. A collaborative approach must be taken to address issues of noise perception amongst staff. 8. There needs to be a review of working practices in conjunction with unions to ensure that time is allowed for vehicle issues. 9. Reducing the number of dedicated vehicles may help to ensure fault reporting. 10. More research is needed on crew perceptions of noise. 11. More research is needed on the barriers to effective vehicle maintenance.

Potential Benefits (as sold to the fleet steering group) There are financial savings to be made by addressing all the recommendations here. A staff group which feels that it is cared about, stays longer with the business, committed teams work better together and recruitment and training costs fall. Reduced sickness also has benefits for the business both in terms of cost and efficiency.

The Situation Now (as at 16 th Sep ’05) 1.Spending is being monitored closely (budgets capped etc.), there are no new vehicles being purchased but they are continuing to fit the aftermarket noise reduction kits. 2.Extra noise testing equipment has been purchased to enable the Health & Safety Team and Vehicle Engineers to test vehicles when visiting depots. 3.A formal testing regime has not been developed. 4.Fault reporting has changed and is currently being reviewed by the fleet steering group, also the fleet team structure is due to be rationalised. Current fault records cannot identify specific noise issues. 5.Communication with the teams is being delivered face to face by line managers, currently reviewing the content of health and safety messages.

The Situation Now (as at 16 th Sep ’05) 6.The vehicle design issues are ongoing with Johnsons (main supplier), our fleet engineers and regular crews. 7.Perception has not been tackled – working on a plan but do not expect it to be fixed overnight! 8.Duty times have been reviewed to ensure sufficient time is built in to carry out all the vehicle checks, but needs more work to ensure activities are supervised. 9.With the changing business fewer vehicles of this type required, slowly being replaced with MVV. 10. As 7 above. 11.Research carried out changed the procedure, it is now being reviewed by the fleet steering group.