ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD UNIT 1 – ECO PARK UNIT 1 – ECO PARK CARSEVIEW ROAD CARSEVIEW ROAD FORFAR DD8 3BS FORFAR DD8 3BS OTHER BUSINESS.

Slides:



Advertisements
Similar presentations
Woodheat Solutions Training Pack : Implementing Best Practice from Austria and Finland Alison Wilshaw TV Energy.
Advertisements

September Wood to Warmth – Bioenergy Appliances Michael Beech TV Energy.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
September Wood to Warmth – Fuel Delivery and Storage Michael Beech TV Energy.
Woodfuel supply chains in Austria. Woodfuel supply chains 1. Developments in Styria 2. Woodfuel supply chains 3. Biomass Trade Centres.
Introduction to Alternative Heating Systems South West Chicken Association, April 2013.
ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Biomass for heat and power production - opportunities for land owners and buildings managers Ian Tubby Biomass Energy Centre RRSP, October 2009.
Economics and Social Benefits Eric Dodd HICEC Manager.
Servite HA Inverness Pellet District Heating  4 th Servite District Heating Scheme  32 Units  Heating Analysis via Pick Everard –Building regs 10,200.
Installation of New CHP system at the Old Aberdeen Campus.
BIOGAS FROM PÄÄSKÜLA LANDFILL TALLINN, ESTONIA INDREK TIIDEMANN TERTS AS REPROMO Market Place for Renewable Energy Actions ROME
First Steps of Using Biogas (Landfill gas) in Estonia INDREK TIIDEMANN TERTS AS International Conference in Tallinn 7-8 October 2005.
Brites – Fuel for the Future. Balcas the Business Established 1960’s - £90m turn over Leading timber products supplier Pioneered biomass renewable energy.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Cogeneration Facility The University of North Carolina at Chapel Hill Cogeneration Systems Energy Services Department Phil Barner- Cogeneration Systems.
13D Riverside Park, Wimborne, BH21 1QU. SOLAR PHOTOVOLTAIC.
An independent heating system consists of: 1) wall-mounted boiler flue 2) manifold of copper and its connection to the boiler 3) internal boiler chimney.
Page 1 AVC Group Delivering Heating Solutions for Social Housing AVC ALTERNATIVE ENERGY Saving energy Cutting Utility Costs Reducing Carbon Emissions.
Renewables and Tax Sheila Robertson (BMR director) Gall Robertson CA Tweedside Park Tweedbank TD1 3TE Tel:
VT Department of Forests, Parks & Recreation Wood Energy in Vermont January 2005 VT Department of Forests, Parks & Recreation.
WOODFUEL FOR THE CONSTUCTION INDUSTRY Architects Point of View + Building Regulations.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
Moor Heating Stephen Larkin The experience of having the first pellet boiler.
Reconstruction of K4 Boiler for Biomass Combustion.
PRODUCTION OF WOOD CHIPS
LAQM.PG(S)(09) – new biomass guidance. PG(S)(09) published in February Reflects changes since PG(S)(03) 2003: - biomass burning not a significant issue.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
Air and Ground Source Heat Pumps A presentation by Alan Westlake – Programme Manager (RHA) and Jeremy Pallant – Director Greensave.
Community-owned Renewable Energy Sixways, Worcester 10 September 2014 Jon Hallé
Woodfuel for the Construction Industry 11 th May 2010 Willie Beattie Biomass Development Officer Forestry Commission Scotland Scottish Government.
Starting a Community Woodfuel Initiative - Biomass Funding 28th November 2009 Ian Cowe Biomass Development Officer Forestry Commission Scotland Aberdeenshire.
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
Rural Development Commission 16 th November 2010 Angus Robertson - Project Officer.
Croft Castle Biomass From Harvest to Heat Chatsworth House - 8 th July 2015 Presented by Ed Wood.
© ESD 2003 IRIS KYOTO Example: Svilosa Wood Waste, Bulgaria Coal Waste Emissions Coal Waste Biomass boiler Emissions 75,000 tonnes CO2 per year.
District Heating Typical range of power 500 kWth – 20 MWth Optimum size about 1 MWth Consumption about tons/year compatible with local availability.
Rob Snaith Micro-Renewables and Microgeneration Specialist Energy Saving Scotland advice centre Highlands and Islands 17th April 2010 Financial Incentives.
UK Woodfuel Suppliers Group “Immediate priorities for the UK wood fuel supply chain” At EBEC Wednesday 5 th October 2011 Presentation by Robert Bland Chair.
Renewable Energy Technologies. Which is the best solution? David Gilbey – Renewable Consultant 8 th April
WOOD STOVE ?????. Biomass Heat Generation Alternative & Economical Fuel SWCS SNEC 2010 Winter Meeting Bruce Payton, RIDEM Forest Environment.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Xero Energy Limited ∙ Tel: +44 (0) ∙ Registered as No. SC in Scotland, at 2/1A, 2 Parkgrove Terrace, Glasgow G3.
Steve Barrett MD of Solarsense Renewable Energy Options.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
Cranbrook A zero carbon case study 10 th July 2012 Mike Wood Centre for Energy and the Environment.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Green Energy Engineering Ltd Call Now: www.geeltd.org 198a Lurgan Road, Dromore, Co.Down BT25 1HL COMMERCIAL RHI Heat your.
Portfolio of Biomass Projects in the Czech Republic David Viduna BTG Central Europe s.r.o. San Salvador, March 28, 2003.
Biomass Heating and the Renewable Heat Incentive.
Green Energy Engineering Ltd Call Now: www.geeltd.org 198a Lurgan Road, Dromore, Co.Down BT25 1HL COMMERCIAL RHI Heat your.
Potential of electrical trailer cooling during rest periods Analysis of emission and costs.
Wood Fuel Supply Chain Robin Almond RTS. Who are RTS? Timber Harvesting & Marketing Quarter of a million tonnes of timber per year Woodland Management.
Potential of electrical trailer cooling during rest periods Analysis of emission and costs.
Wind turbines convert the kinetic energy in the wind into mechanical power Wind energy is a free, renewable resource, so no matter how much is used today,
1 «BM SAKHALIN» OJSC Sakhalin oblast Complex woodworking operation in the Sakhalin oblast CONSTANTINE EDUARDOVICH BEZNOSYUK General Director at “BM SAKHALIN”
1 Diesel-Vehicles Emission Control in Japan Environmental Management Bureau, Ministry of the Environment, Japan Masayuki KOIWA.
Boiler Operations, Maintenance and Performance Conference.
2.14.  In 1970 the Environmental Protection Agency (EPA) was established  Required to set and enforce air quality standards  Air quality standard –
Best Practice Chip Delivery, Storage & Handling And The Importance of Fuel Quality Nick Gough RTS Ltd Woodfuel Manager.
PROJECT PromoBio BARTŁOMIEJ ASZTEMBORSKI, Eng. Project Assistant The Polish National Energy Conservation Agency.
Bioenergy Policies Chad Hart Center for Agricultural and Rural Development Iowa State University June 23, 2008.
Charlotte Hatto NORTH ENERGY ASSOCIATES LTD Life Cycle Assessment for Project Kade Wetland Biomass to Bioenergy AMW.
Bioenergy 101: Biomass Properties and Emissions Fernando Preto CanmetENERGY Yukon Bioenergy Forum: Indigenous Bioenergy Opportunities Whitehorse, March,
Saving with renewable energy Presentation to North East Bioresources and Renewables January 2014.
Energy in Agriculture 2016 On Farm Heat From Biomass Gurteen Agricultural College August 23 rd 2016
Air Source Heat Pumps Edward Sharpley – Sales Manager
Biomass Understand the fundamental principles and
Solar Initiative – Next Phase Opportunity
EcoTech Heating and Controls LTD Commercial Boiler House Install
Presentation transcript:

ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD UNIT 1 – ECO PARK UNIT 1 – ECO PARK CARSEVIEW ROAD CARSEVIEW ROAD FORFAR DD8 3BS FORFAR DD8 3BS OTHER BUSINESS ACTIVITIES OTHER BUSINESS ACTIVITIES CIVIL ENGINEER CIVIL ENGINEER FOREST OWNER AND HARVESTING BUSINESS FOREST OWNER AND HARVESTING BUSINESS PROPERTY DEVELOPER PROPERTY DEVELOPER BILL WATSON BILL WATSON TEL: TEL: FAX: FAX:

ANGUS BIOFUELS WOODCHIP PRODUCER WOODCHIP PRODUCER BOILER INSTALLATION BOILER INSTALLATION HEAT SUPPLY CONTRACTS – ESCO HEAT SUPPLY CONTRACTS – ESCO FLUE GAS FILTRATION SPECIALISTS FLUE GAS FILTRATION SPECIALISTS

BIOMASS PLANT SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR OPENED BY JOHN SWINNEY IN JAN 2008 OPENED BY JOHN SWINNEY IN JAN 2008 PROJECT COSTS: £3.0 MILLION PROJECT COSTS: £3.0 MILLION

MAIN CONSIDERATIONS OF SETTING UP PLANT LOCATION TO TIMBER SUPPLY LOCATION TO TIMBER SUPPLY LOCATION TO BOILERS LOCATION TO BOILERS CAPITAL COST CAPITAL COST GRANT ASSISTED BY SSBS AND SRDP GRANT ASSISTED BY SSBS AND SRDP QUALITY OF CHIP QUALITY OF CHIP MOISTURE CONTENT OF CHIP MOISTURE CONTENT OF CHIP SIZE OF CHIP SIZE OF CHIP HANDLING OF WOOD FROM FOREST TO BOILER HANDLING OF WOOD FROM FOREST TO BOILER

WOODCHIP OUTPUT MAXIMUM OUTPUT = 100 TONNES OF DRY CHIP PER DAY I.E. 400,000 kWhrs OF HEAT/DAY TYPICAL HOUSE WILL USE APPROX 100 kWhrs/DAY (WINTER) TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs/DAY (WINTER)

STORAGE OF WOOD & CHIPS AIR DRYING = 5000 TONNES AIR DRYING = 5000 TONNES AT ROADSIDE = 10,000 TONNES AT ROADSIDE = 10,000 TONNES DRY CHIP = 2000 TONNES DRY CHIP = 2000 TONNES

WOOD CHIP DELIVERY SYSTEMS Bulk Truck 150m3 per delivery Bulk Truck 150m3 per delivery Tipping Trailer m3 Tipping Trailer m3 Big Hook System 40-60m3 Big Hook System 40-60m3 Blower Trailer m3 Blower Trailer m3 Hi Lift Trailer 16m3 Hi Lift Trailer 16m3 Bulk Bags 2m3 per bag Bulk Bags 2m3 per bag

AIR QUALITY PART 1V OF THE ENVIRONMENT ACT 1995 – LOCAL AIR QUALITY MANAGEMENT. PART 1V OF THE ENVIRONMENT ACT 1995 – LOCAL AIR QUALITY MANAGEMENT. PARTICULATE MATTER SHOULD NOT EXCEED AN ANNUAL MEAN OF 18ug/m3 BY 31 DECEMBER PARTICULATE MATTER SHOULD NOT EXCEED AN ANNUAL MEAN OF 18ug/m3 BY 31 DECEMBER ENVIRONMENTAL HEALTH ARE RECOMMENDING ABATEMENT TECHNOLOGY. RHI REQUIREMENT ENVIRONMENTAL HEALTH ARE RECOMMENDING ABATEMENT TECHNOLOGY. RHI REQUIREMENT

Biomass Boiler Particulate Emissions Data with and without Filter Pre Filter mg/m 3 at 11%O 2, dry, STP Post Filter mg/m 3 at 11%O 2, dry, STP %Reduction Total PM PM PM

ESCO SUPPLY AND INSTALL BOILER (INCLUDING PLANNING & BUILDING WARRANT) Design and Build SUPPLY AND INSTALL BOILER (INCLUDING PLANNING & BUILDING WARRANT) Design and Build MAINTAIN BOILER MAINTAIN BOILER CLEAN & DE-ASH BOILER CLEAN & DE-ASH BOILER OFF-SITE MONITORING using BMS OFF-SITE MONITORING using BMS ALL CIVIL, MECHANICAL AND ELECTRICAL WORK ALL CIVIL, MECHANICAL AND ELECTRICAL WORK CHARGE RATE PER kWhr THROUGH METER MONITORED ON FLOW AND RETURN PIPES CHARGE RATE PER kWhr THROUGH METER MONITORED ON FLOW AND RETURN PIPES ADVANTAGES FOR CLIENT HAS LIMITED RISK HAS LIMITED RISK DOES NOT NEED TO MONITOR FUEL QUALITY DOES NOT NEED TO MONITOR FUEL QUALITY NOT RESPONSIBLE FOR FUEL EMISSION QUALITY NOT RESPONSIBLE FOR FUEL EMISSION QUALITY DOES NOT REQUIRE EXTRA PERSONNEL TO RUN BOILER DOES NOT REQUIRE EXTRA PERSONNEL TO RUN BOILER

RHI Renewable Heat Incentive Consultation Deadline 26 April 2010 Consultation Deadline 26 April 2010 Government Implementation April 2011 Government Implementation April 2011 Payments from 15 July 2009 Payments from 15 July 2009 Proposed up to 45kw 9.0p/kw hr Proposed up to 45kw 9.0p/kw hr Proposed 45kw to 500kw 6.5p/kw hr Proposed 45kw to 500kw 6.5p/kw hr Payments by OFGEM 15 years Payments by OFGEM 15 years

THANK YOU. Bill Watson. Bill Watson. E mail : E mail : Mobile : Mobile : Office : Office :