The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items.

Slides:



Advertisements
Similar presentations
Contract Management and Regulation Vickram Cuttaree The World Bank St. Petersburg – May 24, 2008.
Advertisements

A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
Introduction to Public Private Partnerships
Public Debt Management with emphasis on PPP 1 Ministry of Finance 08 th Dec 2014.
Public-Private Partnerships: Basic Considerations, Accounting and Reporting Issues Presentation by Max Alier Resident Representative in Brazil International.
Wrap up Decision makers meeting on good administration of land Windhoek Namibia, 7+8 December 2006.
EDC’s Approach to Municipal and Regional Government Risk: A Central & Eastern Europe Perspective Lorne Cutler, P.Eng September 2004.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
Brief Overview of the Passenger Transport Sector in the Philippines Gilberto M. Llanto C.P. ROMULO HALL, NEDA SA MAKATI BUILDING May 7, 2013.
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
Introduction to Business
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Introduction : Before 1991, economic development of the country was due to the public sector. But it is realized that public sector was insufficient due.
ROLE OF DIFFERENT STAKEHOLDERS AND HYBRID FINANCIAL MECHANISM OF MHI Public Private Partnerships or PPPs as Means of Financing Infrastructure in MHI Projects.
Public-Private Partnerships: State of Practice and Research Needs The 14 th Annual Public Private Partnership Conference World Bank, Washington, DC September.
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
Financing Urban Public Infrastructure
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Background of PPP Negotiation
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Role and Components of Project Evaluation
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
1 ABSTRACT PRESENTATION OF THE FINANCIAL STRATEGY FOUNDER OF INSFRASTRUCTURE SUSTAINABLE DEVELOPMENT RK B.O.T PROGRAM.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
Public-Private Partnerships And Protecting the Public Interest Preliminary Questions & Issues Steve Cohen Assistant Director U.S. Government Accountability.
Influence of foreign direct investment on macroeconomic stability Presenter: Governor CBBH: Kemal Kozarić.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
Iraq Finance 2012 Public Private Partnerships Abraham Akkawi September 18, 2012.
CREW Project Research Findings of Diagnostic Country Report (DCR), Ghana Bus Transport Sector.
Finance: The Critical Link The Transportation – Land Use – Environment Connection Brian D. Taylor October 2003 Institute of Transportation Studies.
PPP International Best Practice and Regional Application Overview of Public Private Partnerships (PPPs) April, 2008 Tegucigalpa, Honduras Filip Drapak.
INTERNATIONAL FOOD POLICY RESEARCH INSTITUTE sustainable solutions for ending hunger and poverty Ghana Strategy Support Program Concluding Remarks and.
REFORMS IN THE ROAD SECTOR IN KENYA Restructuring of Road Sub-Sector: Responding to Future Challenges Eng. Joseph N Nkadayo, MBS Director General, Kenya.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Improved Vehicle Operations in SSA Mustapha Benmaamar, TRL.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
Overview of PPI’s in Georgia April 26, 2006 Earl Mahfuz, Treasurer.
Click to edit Master title style Click to edit Master subtitle style BUREAU OF TRANSPORT & REGIONAL ECONOMICS-TRANSPORT COLLOQUIUM 05 Future Opportunities.
Introduction to Transportation Engineering
Kiichiro Fukasaku Development Centre
THE LINKS BETWEEN ECONOMIC AND SOCIAL POLICIES JOSÉ ANTONIO OCAMPO UNDER-SECRETARY GENERAL ECONOMIC AND SOCIAL AFFAIRS.
CAI-Asia is building an air quality management community in Asia Investment Implications of the Action Plan Sustainable Urban.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Tshepo Makhanye Information Section: Research Unit.
Definitions and objectives of public private partnerships (PPPs) Annemarie Mille.
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
Restructuring of the Finnish Infrastructure Administration Draft
Danida support to the microfinance industry. Overall objectives of Denmark’s development cooperation Overall objective To combat poverty and promote human.
Michael Replogle Chairman, Partnership on Sustainable, Low Carbon Transport And Deputy Commissioner for Policy, New York City Department of Transportation.
Budget Workshop Capital Improvement Plan Presentation on Public Private Partnership and Strategy for Municipal Complex, HWY 50, and Coast to Coast Trail.
South Asia: The Challenge of Accelerating & Sustaining Growth South Asia: The Challenge of Accelerating & Sustaining Growth Priya Basu Lead Economist,
PPPs for Value Chain Development
Introduction to Business (MRK 151)
Quality of government expenditure
 Remaining public investment needs in the face of declining aid flows: what scope for public-private partnerships in BiH? Serban Ghinescu, EBRD 4.
Public Private Partnerships (PPP)
A bank’s perspective on PPP projects
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
CHALLENGES AND OPPORTUNITIES FOR MOBILIZING CONSTRUCTION FINANCE By Gomolemo Zimona Botswana Housing Corporation.
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Capital Improvement Plans
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Presentation transcript:

The Road to Ghana: A Toll Road Infrastructure PPP Case Study This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered.

Table of Contents 1. Introduction 2. Major Projects 3. Our Mandate 4. Why Accra to Kumasi roadway 5. Our Challenge 6. Roadway Design 7. Project Benefits

Table of Contents 8. General Benefits of the Tolling Regime 9. Implementation Considerations 10. Transportation Integration 11. Economic Evaluation 12. Utilizing PPP in Infrastructure 13. Risk Assessment 14. Political and Commercial Challenges 15. In Closing

Introduction Road transportation constitutes an integral part of a nation’s development In Africa, roads form one of the most important and valuable public assets as it carries about 90% of its passengers and major access to its rural communities, which forms the food basket of every nation It is all encompassing and pervasive and therefore affects the social, economic, and the political life of every citizen In Ghana, road transportation accounts for 94% of freight and 97% of all traffic movements Good road network will enhance poverty reduction, by Nonor Daniel Ghana Ministry of Transportation September © Ghana Chronicle

Introduction In the growth of countries such as India and China, we have seen that there is a positive correlation between investment in road transportation and growth and poverty reduction. In Ghana, completed and maintained roads have lead to a 20% increase in visits to hospitals, A major lowering of the cost of traveling to market centers, and Efficient delivery of farm produce to urban centers by farmers which empowers them financially and reduces food costs

Introduction The Ghanaian government has undertaken to ensure that transport is used as a means to achieve the targets set under the Growth and Poverty Reduction Strategy (GPRS II) and to achieve the Millennium Development Goals and the attainment of middle income status by 2015

Introduction Social and Economic Impact In In North America, Road Transportation has had a major social and economic impact Eisenhower Interstate Highway System Trans-Canada Highway, The United States and Canada developed the Eisenhower Interstate Highway System in the 1950’s and Canada, the Trans-Canada Highway, linking the Atlantic and Pacific major undertakings that promoted prosperity with a substantial economic benefit that has had a profound long-term economic and social benefit which has changed the face of the United States and Canada and the lives of its people

Who we are A Ghanaian corporation comprised of Global companies headed by multi-national seasoned infrastructure and construction industry professionals with diverse experience in all aspects of infrastructure and construction including: Project development, Structural and architectural engineering design, Financing, Construction, Concessions, and Management and operations

Major Projects Integrated commercial inter-modal urban complexes

Major Projects The National Football League Buffalo Bills Stadium

Major Projects Power Plants, Dams and pipeline infrastructure

Major Projects Commercial and Residential Complexes

Major projects Highway and Bridge Infrastructure

Major projects DSC International - Raipur Durg Toll Expressway, India

Major projects Universities, affordable housing, houses of worship, schools, hospitals

Our mandate Arterial Toll Road Company Limited was selected by the Government of Ghana to develop, construct and finance an Arterial Highway System and Tolling Regime linking the land-locked African countries to the Port of Accra and to produce the Ghanaian link of the Intercontinental Highway System being planned for the Continent, and develop a cost-efficient, user-friendly approach to financing roadways and highways allowing for its individual users, no matter their nationality, to pay the cost of the roadways, without unduly burdening the country’s citizens

Why the Kumasi-Accra roadway Serves: the most economic active area of the country and links the two major commercial centres of Ghana – Accra and Kumasi Provides: primary access to the northern parts of the country as well as an international transit route for Ghana’s landlocked neighbours such as Bukina Faso and Niger Its strategic location: makes it one of the most important links in Ghana’s roadway network as it serves the northern, central, western, and southern parts of Ghana, and a major influence on transportation for the almost 20 million people of Ghana

Why the Kumasi-Accra roadway Prone to Accidents: over-speeding and inadequate provisions for broken down vehicles have contributed to the high rate of accidents on this road which habours about 38% of the “black spots” (accident prone locations) in the country. Traffic Flow: the existing route of the highway passes through many towns and commercial areas with its inherent traffic delays contributing to a 5+ hour travel time to transverse the 230 Km from Accra to Kumasi

Why the Kumasi-Accra roadway Proof of Performance: its traffic flow supports an affordable Tolling structure allowing for reasonable tolling rates and the ability to repay debt over a reduced timeframe while providing to the International community Proof of Performance to substantiate the expansion of the dualization of the roadway system under a commercial financial structure without direct government guarantees

Our challenge To design, construct, finance, and operate a dualized highway system and tolling regime that is user-friendly, for both public & commercial use safe fair as to Tolling for all its users has continuous Traffic Flow without on-road checkpoints, Tolling stations, and Hawking economical, and an integral component of a unified cohesive transit system for Ghana

Our challenge Being the link between the two main commercial centres and the creation of a true DEVELOPMENT CORRIDOR, we are providing for future ’ribboning’ once completed with expected and anticipated SUBSTANTIAL commercial and residential growth

Design of roadway A 4-lane urban and rural roadway with town bypasses, flyovers and amenities incorporating and renovating an existing 2-lane roadway Associated Facilities for the highway include: restaurants, food stalls, fuel stations Government approved & licensed community stalls Rest and convenience stops accident and Trauma Centres, with an integrated Bus Intercity Transit system Landscaping is designed to prevent erosion, improve aesthetics, and create natural barriers to prevent unauthorized access to the roadway

Project Benefits A value-added faster safer mode of transportation bringing the two major centers of commerce together with over 3 million consumers with a resultant Reduction of driving time from 5 ½ hours to 2 ¼ hours Bypassing towns and cities Fuel savings ( >10L PER 100KM) Commercial transportation cost savings including drivers time and salaries Reduced food spoilage of transport to urban centres Maintenance, major repairs and insurance savings Most importantly, major reduction in accidents and highway deaths

Project Benefits Generates revenue for Ghana by providing primary access to the northern parts of the country for goods transportation as well as an international transit route for Ghana’s landlocked neighbours such as Bukina Faso and Niger to the Port at Accra A fair and user-friendly revenue model that provides the ability for financing and continuously maintain the highway system and its benefits (user cost savings > toll rates)

General Benefits of theTolling Regime Toll payments are based on type of and amount of usage - commercial vs. residential Tolls are paid by both foreign and local users Governments can utilize budgetary funds for other projects Alleviates and manages traffic congestion Provides funding for ongoing road maintenance Enables governments to build projects faster Innovative and more user-friendly Job creation No requirement for Government appropriations Revenue generator The dramatic reduction in the cost of congestion to society in terms of lost time, increased productivity and wasted fuel.

Implementation considerations During the process one must consider the following: Legal and structure considerations Financing and risk assessment Public Awareness, Marketing and Governmental cooperation Environmental and social impact monitoring and management Harmonization of ongoing maintenance, rehabilitation and construction projects on the highway, and Security and safety issues

Transportation integration Dualization of the roadway system should take into consideration current and future integration with other modes of transportation The ability to access bus and/or rail and air travel at future integrated terminals is a goal of an integrated roadway system At selected Interchanges of the Roadway, Bus Terminals will be located to allow for an effective alternative to the absence of mass transit between communities and between Accra and Kumasi Consideration has been given to the needs of the Railway and Airline sectors, and existing rail lines and airport terminals through discussions with the proper authorities and departments within the government

Economic evaluation Our studies substantiated that the Accra to Kumasi roadway was viable, practical and necessary after assessing: its overall project and construction costs road survey, design and engineering studies a safety audit, environmental and social impact study a transportation and traffic studies of the roadway the need for weighing stations to minimize overloading affordability of Toll Rates the stability, priority and willingness of the Government the current physical status of the roadway, and the needs of the community

Economic evaluation In evaluating its feasibility, it was also important to review Ghanaian fiscal, legal, economic and political stability ●Ghana’s government is a Constitutional Democracy, supported by a Constitution that has been adhered to stringently by its political parties ●Ghana’s Legal system is based on English common law and customary law, and ●Ghana is well endowed with natural resources: oil reserves, gold, timber, diamonds, bauxite, manganese, fish, rubber, hydropower, petroleum, silver, salt and limestone

Economic evaluation Upon completion, the Accra to Kumasi roadway will: provide the Ghanaian people with timely and necessary road infrastructure, and as important demonstrate to the international community Proof of Performance through the successful completion of a major dualized roadway corridor including successful introduction of a economically viable Tolling regime using a cost-efficient approach with minimum of risk

Utilizing Public Private Partnership (PPP) in infrastructure development Why should a Government utilize a PPP development structure? Public-private partnerships (PPPs) provide flexibility and involve the supply by the private sector of infrastructure and services deriving from infrastructure assets which have traditionally been supplied by the public sector. Although initially there was a fear by the financial community that such arrangements were initially an attempt to evade expenditure controls and hide public budget deficits. PPPs are now spreading worldwide. They are used in transportation infrastructure, such as roads, bridges, tunnels, rail, air and sea ports; utilities, such as water and electricity supply, sewage, and waste disposal; prisons; schools; and hospitals. Public-Private Partnerships: A Public Economics Perspective – an IMF Working Paper Prepared by Efraim Sadka March © 2006 International Monetary Fund This Working Paper does not represent the views of the IMF

Utilizing Public Private Partnership (PPP) in infrastructure development PPPs are not normally seen as genuine partnerships as they may not properly or efficiently share risks and liabilities (or profits) and, can be a means to mask conventional contracting undertaking which would normally be subject to standard budgeting processes (undertakings carried out by governments off budget). However, properly formed PPPs have developed into genuine partnerships aimed at properly pricing scarce public resources and efficiently sharing and managing risks. When properly designed and transparently reported, they can play a useful role in enhancing the efficient provision of infrastructure and services that were previously supplied solely by the public sector.

Utilizing Public Private Partnership (PPP) in infrastructure development The most common forms of PPP’s are variations of design- build-finance-operate (DBFO) projects, in which a private sector concessionaire designs, builds, and finances a certain facility and then operates them for government, or build-operate- transfer (BOT), in which a concessionaire finances and builds a facility, operates it, and in both cases then transfers it to the government at the end of the concession period. In our case, we are designing, financing, building and operating the Accra to Kumasi roadway over a 30-year Concession. PPP’s play a useful role in enhancing a proper cost-benefit analysis and reducing the likelihood of government building “white elephants”.

Utilizing Public Private Partnership (PPP) in infrastructure development With a PPP the private sector is the final “adjudicator” of a project, providing the economic viability of the project calculated at socially appropriate prices. This is a very important aspect of our relationship with the Government of Ghana, where, similarly as in the case of how funding was designated by the Millennium Fund provided by the USA, the private sector determines how funds are utilized in developing the necessary infrastructures. Essentially, all funding properly ends up in the developing, designing and building of infrastructures at much reduced overhead and a minimum of extraneous costs.

Utilizing Public Private Partnership (PPP) in infrastructure development PPP’s also play an important roll in enhancing the efficiency of resource allocation. When properly designed, in particular with respect to sharing risks between the public and private partners, PPPs can improve the quality of services previously provided by the public sector without raising their costs to society as a whole. PPP’ S SHOW THAT IT IS A FALSE DICHOTOMY TO BELIEVE THAT ONLY THE PUBLIC SECTOR SHOULD DEVELOP, CONSTRUCT, OWN, LEASE OR OPERATE INFRASTRUCTURE.

Risk Assessment Ghana has one of the strongest economies in Sub-Saharan Africa. The areas that we concentrated on in our risk assessment were P RODUCTION, M ANAGEMENT, P OLITICAL S TABILITY AND E CONOMIC G ROWTH. PRODUCTION - With production starting on new gold deposits, record cocoa harvests and projected oil production, economic activity has been registering positive performance. The expansion of services and increased spending on social programs and government infrastructure should continue to fuel growth this year. Easing inflationary pressures, allows the Central Bank to relax monetary policy, and benefits the economy.

Risk Assessment MANAGEMENT – Governmental tight management has facilitated the consolidation of public sector finances, promoted transparency with the institution of Procurement laws and regulations that has enhanced the reputation of Ghana in the international community. POLITICAL STABILITY - Ghana's political stability has facilitated implementation of reforms intended to develop a business environment more hospitable to the private sector. ECONOMIC GROWTH - Ghana is experiencing major economic growth with an anticipated increase in GNP of over 13% in 2011.

Risk Assessment Through a PPP, a Concessionaire can mitigate risk though government providing fundamentals such as cash flow guarantees, Sovereign guarantees, Political Risk Insurance, and Currency devaluation guarantees. However, what is important for risk mitigation is assessing the risk rating of the Government, its ability to retain politically stable, the ability of the Government and the infrastructure users to accept the Tolling regime and understand its benefits, maintain a constant revenue stream and MOST OF ALL, the economic and commercial viability of the project. In our evaluation of our project, which we consider to be the premier toll road project in Sub-Saharan Africa, we decided to take the path of least governmental and IMF resistance, and not include any Governmental or Sovereign guarantees in the Concession and undertake it as a fully commercial project.

Risk Assessment The benefits of this structure are self-evident, from both a political and control perspective; still, within our Concession Agreement we have provided transparency and overseer capacity to the Government of Ghana providing the Government with direct input in all of the aspects of the project throughout the Concession Term. And, as important, once it is proven that projects such as the Accra to Kumasi roadway can be seen to be economically viable, providing a true ‘proof of performance’, this will open up Ghanaian infrastructure investment to the International community without affecting the budgetary pressures that Sovereign Guarantees put on a country.

Political and Commercial challenges As is similar in many break-through projects, we meet a number of Political and Commercial challenges: Politically, the introduction of PPP Concession Agreements to dualize the major arteries in Ghana privatizes major roadways and diminishes the effect of the Ministries that are responsible for and tenders these roadways, creating an inherent conflict of interest which had caused us major technocratic delays and stumbling blocks. Other political challenges included an necessary reassessment of the Ghanaian Highway Act, highway policing and control of Commercial Trucking Weighing Stations to police variances of axle weight limits. Only ‘true’ political resolve and perseverance can help developers and sponsors overcome these stumbling blocks.

Political and Commercial challenges We also had to overcome a number of commercial challenges centering around the reality that there were no financially viable existing major Toll Roads in West Africa with its inherent negative financial preconceptions Other commercial challenges to be resolved included: Effect of any potential future political unrest, either within Ghana or its neighbours Currency devaluation and FOREX risk And most importantly PPP and Concession Agreements are new to Ghana with no previous experience for Government to rely on, with preconditioned prejudices against the Private Sector in doing their work Inexperience of Government within a PPP process should require Government to retain independent outside advisors to facilitate the Private Sector by reducing timelines

Political and Commercial challenges These challenges cause major delays and timelines that created an unreasonable time loss and risk funding in order to obtain the necessary Government approvals; in that our encompassed two administrations and 8 years; however, the current Government’s political resolve and our perseverance has allowed us to successfully complete the necessary approval processes. It is most important for Developers to be able to internally fund the development phases of a project in-houseprior to receiving the necessary approvals and obtaining Financial Close; and in doing so, the benefits to the Developer can outweigh the risks and provide for Africa its necessary infrastructure.

In closing Our Ghanaian experience has shown that with PPPs, the International business community has the ability to help Africa and its Governments help themselves in developing the necessary infrastructure that is so urgently needed to improve the social, economic, and the political life of every citizen.

Contact Information: Howard Hurst, CEO Arterial Toll Roads Company Limited