Tullamarine Rehabilitated Landfill > 27 November 2013.

Slides:



Advertisements
Similar presentations
Remedy Statistics April 2009 May 28th 2009 Paris Desktop Support Analysis only done with Remedy tickets (Incident-Task-Request) (GRS requests are not included.
Advertisements

Regulatory Landscape for Leased Federal Airports Archerfield Airport Community Aviation Consultation Group (AACACG) 2 November 2011 Helen Gannon Aviation.
JinkoSolar Holding Co., Ltd. Q Earnings Call Presentation June 7, 2013.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
Pension Fund Trustees Liability Ncedi Mbongwe. Introduction to Camargue Underwriting Managers Established in 2001 Underwriters: Mutual and Federal and.
IMPORTANT READ CAREFULLY BEFORE USING THIS PRODUCT LICENSE AGREEMENT AND LIMITED WARRANTY BY INSTALLING OR USING THE SOFTWARE, FILES OR OTHER ELECTRONIC.
MPCA Citizens’ Board Information Item February 25, 2014.
Hedge fund flows on pace to nearly double 2012
Tullamarine Rehabilitated Landfill > 26 November 2014.
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
Western Ave S53X Audit  12 th March 2014  7 pm Mantra.
Innovations in Structured Products October 25, 2010 An Innovator’s Dilemma?
Sound Practice Guidance update Glasgow, 7 th November 2014 IOR Scottish Chapter The Institute of Operational Risk Brian Rowlands FIOR ©
Dr Zoe Robinson, Keele University, Greening Business: An online teaching resource.
SARA IMG Event Johannesburg 10 April 2014 Changes in South African Immigration Law.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Managing HFAs’ Financial Health in the Face of Uncertainty NCSHA Annual Conference October 21, 2014 Ping Hsieh, Vice President – Senior Analyst.
Middleware Promises Warranties that Don’t Indemnities that Won’t Stephen Rubin, Esquire
In Confidence WESTERNPORT WATER COMMUNITY CONSULTATION WATER PLAN 2008 – 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2010 Standard.
Background and lessons learned Managers Meeting February 13, 2014.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
Waste Management Overview & Land Disposal Restrictions.
Encounter Data Validation: Review and Project Update August 25, 2015 Presenters: Amy Kearney, BA Director, Research and Analysis Team Thomas Miller, MA.
BROKER PRESENTATION December Disclaimer & Confidentiality Notice  The information contained in this Presentation or subsequently provided to the.
PRODUCTIVITY – THE PICTURE FOR THE UK & THE WEST MIDLANDS SUSTAINING COMPETITIVENESS CONFERENCE – THE BELFRY RHYS HERBERT SENIOR ECONOMIST 6 JULY 2012.
Andrew McNab - License issues - 10 Apr 2002 License issues for EU DataGrid (on behalf of Anders Wannanen) Andrew McNab, University of Manchester
Madison Elementary School District Class B Bond Capacity Update May 2013.
DG Environment European Commission Introduction to European ETV Promoting New Technologies Environmental Technology Verification Schemes Introduction to.
First Generation Magnox Storage Pond (FGMSP) Programme Partner Requirements February 2014 Steve Topping.
Resume Builder Todd Abel, Microsoft Copyright Notice © 2003 Microsoft Corporation. All rights reserved.
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2014 by Standard.
On-line briefing for Program Directors and Staff 1.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
© Ceres Power Limited 2003 Building a Valuable FC Company … Some Lessons Learned 26 Feb 2004.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Oracle E-Business Suite R12.1 Accounts Payables Partner Boot Camp Training Courseware Part VIII – Transaction Taxes in Payables.
1 of 26 For Oracle employees and authorized partners only. Do not distribute to third parties. © 2009 Oracle Corporation – Proprietary and Confidential.
FY 2006 results presentation X5 Retail Group N.V. March 1, 2007.
End User License Agreement Permission to use and redistribute this Document is granted, provided that (1) the below copyright notice appears in all copies.
Towage Procurement Process – Industry Briefing 05 May 2014.
Department of Environmental Quality Life-of-Site Permitting Required Changes to Solid Waste Management Rules 15A NCAC 13B March 10, 2016.
Report on Jobs – Vacancy Trends 19 July 2012 Markit Economics.
London CLT Big Potential Presentation 17 th March 2016.
Permission to reprint or distribute any content from this presentation requires the prior written approval of S&P Global Ratings. Copyright © 2016 by Standard.
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2011 Standard.
Iluka Resources Ltd’s Proposed Continued Disposal of Waste by-products at Douglas Second Information Session.
Global experience of automating irrigation systems Sumith Choy 07 Apr 2016.
The secure site rendering issue (all navigation crushed together as a list at the top of the page) is a compatibility issue with Internet Explorer only.
Camargue Commercial Crime
Connectivity to bank and sample account structure
RaboDirect Financial Health Barometer 2016
Summary of financial results for the period 1-6/2017
Corporation Tax Corporation Tax
Delivering Water Reuse Solutions
Summary of financial results for the period 1-12/2016
Automation in an XML Authoring Environment
Mark Bennett, Head of Agribusiness, ANZ
Self-Registration walk-through
Environmental Upgrade Finance
Motivation for 36OU Open Rack
MRL CRG – Cleanaway Update
© 2013 Sri U-Thong Limited. All rights reserved
Blueberry.
Presentation transcript:

Tullamarine Rehabilitated Landfill > 27 November 2013

Tullamarine Landfill Rehabilitation 2 Task Progress Update >Light Non Aqueous Phase Liquid (LNAPL) Trial Update on Progress >Flare Update on Progress >Buffer Land Environmental Audit Progress >Landscaping Plans

LNAPL Trial Update Key Changes Resulting from Community Input >Options for disposal explored >System redesigned so there is extra vapour treatment and no onsite storage or reinjection >Trial has a consultation period following first round of field trials to allow for greater level of feedback from Tullamarine community and stakeholders

LNAPL Distribution 4 Prepared by URS, 2013

LNAPL Trial Commencing Early 2014 Stage 1 Testing >All wells tested by removing 100 to 200 litres of LNAPL >Recovery (recharge) in each well measured over a period of approximately 4 weeks >Results reported back to Tullamarine Community Feb & May 2014 >LNAPL destruction (3 facilities trialled)

LNAPL Stage 1 Testing Vapour Flared Cap LNAPL Sealed Area Tank (1 m 3 ) GACs 2x Enclosed Well Head Assembly Leachate Leachate Well Leachate Well Perforations LNAPL thicker in well Pump (intake positioned in LNAPL)

Wellhead Assembly 7 Prepared by URS, 2013 Pump Winch Assembly Enclosure LNAPL Return Contain- ment line

Stage 2 Detailed Testing >Tullamarine Community will be engaged on the process >Wells will be selected based recovery / recharge >Repeat of Stage 1 testing except each well will be pumped continuously for approximately a week >Monitoring of yield & levels similar to Stage 1 >LNAPL disposal same as Stage 1 (no reinjection or storage)

LNAPL Trial (Completed Tasks)  Waste Disposal Approval  Independent Panel Review  LNAPL Trial Design Review

LNAPL Trial (Upcoming Tasks) >Procurement & Fabrication (Dec / January 2014) >Factory Testing & Commissioning (Feb 2014) >Well Integrity Testing (Feb 2014) >Rebound Monitoring (Feb / Mar 2014) >Data Analysis & Reporting (Mar / Apr 2014) >On track to commence field trial February 2014 >Will report to the Tullamarine community the results in May 2014

Environmental Control Vapour/ landfill gas >Sealed well heads during extraction; >System connected to landfill gas system and GAC vessels, 2 in series. Spillage control >Double walled LNAPL collection/storage tanks; >Sealed work area around well head; >Secondary contained transfer hosing;

Environmental Control Noise >Operations during business hours so no change to current conditions. Monitoring: >Portable Landfill Gas and Trace Gas monitors >Samples of LNAPL, leachate & vapour obtained & analysed by laboratories

LNAPL Trial Summary >Design changes were made incorporating Tullamarine Community suggestions >Field Trials to commence in February 2014 testing all wells >The results will be reported to the community in February and May 2014 >The project includes LNAPL destruction trials

Enclosed Flare Proposal  URS Design Report Complete  URS Flare Emissions Model Complete >Auditor Reviewing >Flare will be installed by March 2014

Flare Design Update Flare design includes :  Emission testing ports  Emissions analysis (including VOCs, such as Benzene and VC, and Dioxins) as part of commissioning process Ports and analysis not an EPA requirement however TPI will commission.

Flare Outline Design

Rezoning  Public Exhibition until 9 December (this application relates to land rezoning)  S53X Audit Nearing Completion (this process is running in parallel to land rezoning process ) >Anticipate Audit statement completed early 2014 >Separate applications would be submitted for individual buildings and subdivision works which will be available for residents to view

Rezoning Prepared by TPG, 2012

Environmental Audit Four Studies completed by Golder and Kleinfelder.  Soil (Golder, 2012a & Kleinfelder, 2013)  Vapour (Golder, 2012b & Kleinfelder, 2013)  Groundwater (Kleinfelder, 2013)  Landfill Gas (Kleinfelder, 2013) > Auditor reviewing.

Buffer Land Investigation  Over 60 trial pits completed  Five soil vapour bores (V01-V05)  Groundwater Sampling completed  Landfill Gas Risk Assessment completed  Studies demonstrate low to negligible risk to future site users from soil, landfill gas, vapour & groundwater Western Ave Freeway Wright St

Trial Pit Locations Prepared by Kleinfelder, 2013

Groundwater Sample Locations Prepared by Kleinfelder, 2013

Future Landscaping (Arcadian and Western Plains Flora) Prepared by Golder, 2012

Stormwater Landscaping Prepared by Ian Taylor, 2012

Stormwater Landscaping Prepared by Ian Taylor, 2012

Landscaping Prepared by Ian Taylor, 2012

Landscaping Prepared by Ian Taylor, 2012

Stormwater Landscaping Prepared by Ian Taylor, 2012

Disclaimer This document has been prepared by Transpacific Industries Pty Ltd (ABN ) (“Transpacific”) for the purposes of providing the recipient with an update on the status of rehabilitation works at Tullamarine landfill site. This document has been prepared on the condition that it is for the exclusive information and use of the recipient. This document may not be reproduced, distributed or published by any person for any purpose. No part of this document may be quoted or referred to in any other document. With the exception of information provided by external sources, Transpacific retains all applicable intellectual property rights which arise from the creation of this document. This document is subject to the limitations, assumptions and qualifications referred to in it. In addition to any other rights available to them, Transpacific or any related party (“Transpacific Parties”) herein expressly advise that they: 1.make no representation or warranty, express or implied, as to the accuracy, currency, reliability or completeness of any statements, estimates, opinions or other information contained in this document; and 2.to the maximum extent permitted at law, the Transpacific Parties are not responsible or liable in any way whatsoever for any claim, loss, damage, cost or expense, whether direct, indirect, consequential or otherwise, arising (whether in negligence or otherwise) out of use or reliance on this document, its contents or any omissions from it. Transpacific Parties means Transpacific, its related bodies corporate, directors, officers, employees, representatives, consultants and agents; and a Transpacific Party means any of them.

Thank you for your time