ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter 2.8-2.11 pages 2.180-2.219.

Slides:



Advertisements
Similar presentations
Oil & Gas drilling.
Advertisements

FlowNet FlowNet is a Microsoft Windows-based computer-aided engineering program for fluid flow calculations. It automatically configures a simulation flow.
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
PETE 203 DRILLING ENGINEERING
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
PETE 411 Well Drilling Lesson 13 Pressure Drop Calculations
Drilling Gas Wells: Beginning to End. Seismic Exploration.
Petroleum Engineering 406
Drilling Engineering – PE311 Circulating System
Petroleum Engineering 406 Lesson 3 Well Control. Read Well Control Manual –Chapter 7-8 Homework 2 Due Jan. 30, 2001.
MPD Managed Pressure Drilling GF Landsbyen Outline What is MPD Why MPD Conventional drilling vs MPD.
Lesson 14 Jet Bit Nozzle Size Selection
Well Control Gas Solubility.
Petroleum Engineering 406
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
GEOTHERMAL DRILLING James C. Witcher Witcher and Associates
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
PETE 203 DRILLING ENGINEERING
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 8 Introduction Underbalanced Drilling Manual, UDM:Chapter 1.
Hydraulics.
Selecting an Appropriate Technique Read: UDM Chapter 4 pages
for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack
Petroleum Engineering 411 Well Drilling
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Introduction to Underbalanced Drilling Technology(M2)
Drilling Engineering – PE311 Rotary System
Lesson 3 The Rig - Drilling Equipment
Confidential to SMD JIP
Lesson 25 Well Control, cont’d
PETE 411 Well Drilling Lesson 9 Drilling Hydraulics - Hydrostatics.
Lesson 15 Surge and Swab Pressures
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Dual Gradient Drilling Basic Technology Confidential to DGD JIP
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
Gas Exploration Team Hail 7 Casing Design. Overview Wellbore Schematic Design and load assumptions Design Factors Casing Strings & Connections Details.
1 Petroleum Engineering 406 Lesson 13 Shallow Water Flows.
Lesson 12 Well Engineering.
Performance Through Engineering Extended Reach/Horizontal Drilling Solutions EXTENDED REACH / HORIZONTAL DRILLING.
Dual Gradient Drilling Basic Technology
Advanced Mud System for Microhole Coiled Tubing Drilling August 2005 Prepared for: U. S. Department of Energy-NETL Microhole Technology Development.
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 9 Gasified Liquid Hydraulics Read: UDM Chapter 2.7 pages
MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS
Drilling fluid separation & it’s environmental issue
Petroleum Engineering 406 Floating Drilling
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
Underbalanced Perforating. èEarly tests by Exxon showed that flow patterns and perforation geometry prevent the cleaning out of an appreciable percentage.
Surface Facility Design Group 9 AJKM Waleed Al-harbi, Mitchell Joseph Khalil Kasali Abdul Mdee Mohammed.
LSU Petroleum Engineering Research and Technology Transfer Laboratory “The Well Facility”
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 7 Foam Drilling Hydraulics Read: UDM Chapter pages MudLite manual Chapter 2 pages
ARTIFICIAL LIFT METHODS
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Petroleum Engineering 411 Well Drilling
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
FLASH EMISSIONS JIM COOPER, CHESAPEAKE ENERGY CORPORATION.
for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack
Lecture 10 Production Engineering
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
Mud weight High enough to prevent influx from reservoir fluids High enough to ensure wellbore stability Too high mud weight can cause fracturing of the.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Lesson 7 Steam Power Plant.
INSTRUCTOR © 2017, John R. Fanchi
PETE 406 UBD homework.
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Harold Vance Department of Petroleum Engineering
e-UBDTM Operations by ABEL Engineering/Well Control Co.
Presentation transcript:

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter pages

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Flow Drilling Flow drilling refers to drilling operations in which the well is allowed to flow to surface while drilling. All UBD operations are really flow drilling operations, but the term is usually applied to drilling with a single phase mud, and no gas is injected except by the formation.

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Drilling fluid selection Density is determined by: –maximum pressure <= to formation pressure –minimum pressure dictated by wellbore stability Pressure limitations of diverter and BOP equipment

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Surface Equipment

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Surface Equipment

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Surface Equipment

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Surface Equipment - RBOP

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Surface Equipment - RBOP sealing element

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Surface Equipment

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Sizing Flare line

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Sizing Flare line

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Sizing Flare line

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Sizing Flare line

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Surface Pits Primary Oil Separation Pit Secondary Oil Separation Pit Skimmer System Safety Drilling Fluid Pit Oil Transfer Tank

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Operating Procedures Mechanical objective is to control the well at the surface to maintain underbalanced conditions. Maximum tolerable surfaces pressures should be established before drilling starts.

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Mudcap Drilling Utilized with uncontrollable loss of circulation during flowdrilling operations. Higher pressures than can be safely handled with the rotating head or RBOP. Not necessarily underbalanced.

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Mudcap Drilling Driller loads the annulus with a relatively high density high viscosity mud and closes the choke with surface pressure maintained Drilling is then continued “blind” by pumping a clear non-damaging fluid down the drillstring through the bit and into the thief zone.

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Mudcap Drilling Applications: –Sustained surface pressures in excess of 2000 psi –Sour oil and gas production –Small diameter wellbores

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Mudcap drilling

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fluid Volume Requirements

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fluid Volume Requirements

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fluid Volume Requirements Annular volumes will depend upon whether the operator desires continuous or periodic injection of annular fluids or whether a floating mudcap is to be used.

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fluid Volume Requirements

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fluid Volume Requirements

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fluid Volume Requirements

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Snub Drilling UBD operation utilizing a snubbing unit or coiled tubing unit. Expense is justifiable if very high formation pressures are anticipated, and uncontrollable loss of circulation is expected.

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Closed Systems Refers to UBD operations with a specific surface system. A pressurized, four phase separator and a fully closed surface system, is used to handle the returned fluids.

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fig. 2.70

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fig. 2.71

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Fig. 2.72

ATMATM PETE 689 UBD ATMATM ATMATMATMATM Harold Vance Department of Petroleum Engineering Other Surface Equipment Cuttings Filter Heater Degasser Flare Stack/Pit Production Tank Water Tank Solids Tank Instrumentation