Construction Unresolved Issue: #1 Legal Authority Controversial issue: Definition of rainy season A.) October 1 – April 30, may be extended by written.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Patrick Walsh Nine Mile Point – Human Performance HPRTC Conference -June 10 Improving Administrative Procedure Use and Adherence.
Future of the Construction and Post Construction Water Quality Program
Overview of SMARA Responsibilities for Lead Agencies California Department of Conservation Office of Mine Reclamation Leah Gardner Senior Environmental.
Environmental Streamlining Task Force Water Quality Ordinance April 5, 2012.
Illicit Discharge Unresolved Issue: #1 Staff Training Controversial issue: Frequency and Level of Training Required A.) Training event (given by permittee,
GACDs Annual Meeting January 21 – 23, 2011
MRP Pollutants of Concern Copper Provisions Monday November 20, 2006 Richard Looker - RWQCB.
EMS Auditing Definitions
Statewide Basic Requirements for Stormwater. New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development,
State Veterans Home Clinical & Survey Oversight State Veterans Home Clinical & Survey Oversight Nancy Quest, Chief Office of Geriatrics and Extended Care.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
6 th Edition CCCWP Management Committee February 15, 2012.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Tool for Compiling and Reporting Inspection Data For Provision C.6.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
Application of minimum criteria for environmental inspections in Bulgaria.
CDC Bylaws Requirements Published March 21, CFR
Toxics Management Plans Ecology Review Principles.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
TN Educational Law. Legislative Overview Summary 654 – Prohibits LEAs from discriminating against a student based on the student’s voluntary expression.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
ENOTICE Guide Center for Coalfield Justice. Summary eNOTICE is the Pennsylvania Department of Environmental Protection's (DEP) Electronic Notification.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Solid Waste Management Plans Update Webinar Training March 5, 2014.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Lessons Learned from Past MS4 Audits 1/3/20161 Lessons Learned from Past MS4 Audits.
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
Using the MS4 Program Evaluation Guide 1/28/20161 Using the MS4 Program Evaluation Guidance.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
1 Provision C.3. New and Redevelopment Performance Standards Sue Ma Water Quality Control Board San Francisco Bay Region November 15, 2006.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Pollution Control: For Field Office Construction Sites.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
PRINCIPLES & PROCESSES Level 1B: Advanced Fundamentals July 2016 LOCAL PROGRAMS 1.
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
Stormwater Utility City of Rowlett
NJDEP Stormwater Program-Update
Hampden Township Stormwater Management Program
ODOT District MS4 Liaison Training: Why are we here?
STORMWATER MANAGEMENT
MCM #3 Illicit Discharge Determination and Elimination (IDDE)
Sacramento County Stormwater Quality Program
Stormwater Management Program
Background First ERP written in 1991 Revised in 1998
Principles & Processes
Green Infrastructure Planning Update
Freedom of Information Act 2014
MS4 OVERVIEW 2015.
Illicit Discharge Detection & Elimination (IDDE) Plan
Draft BMP Verification Protocols for Non-significant WWTPs Combined Sewer Overflows On-site Wastewater Treatment Systems CBPO Wastewater Workgroup.
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Construction Unresolved Issue: #1 Legal Authority Controversial issue: Definition of rainy season A.) October 1 – April 30, may be extended by written notice of Water Board B.) Period between October 15 to April 15th

Construction Unresolved Issue: #2 Enforcement Response Plan (ERP) Controversial issue: Level of response required by ERP A.) Require ERPs that specify a minimum list of enforcement actions and scheme for escalation of enforcement B.) Allow “Progressive Enforcement Options” to be guidance only

Construction Unresolved Issue: #3 Minimum Required Management Practices Controversial issue: Required of all Construction Sites or Voluntary A.) Specify minimum required management practices that permittees must require of all sites B.) Permittees will voluntarily include the practices in construction field manuals

Construction Unresolved Issue: #4 Plan Check Controversial issue: Level of Review conducted by Plan Checkers A.) Specify that plan checkers review with developers the Minimum Required Management Practices and ensure that their Erosion Control Plans address each required practice B.) Require the submittal of effective erosion control plans

Construction Unresolved Issue: #5 Frequency of Inspections Controversial issue: A.) Require inspections to be done at a specified frequency depending on site size B.) Set minimum guidelines for inspection frequency

Construction Unresolved Issue: #6 Tracking/Self Evaluation and Reporting Requirements Controversial issues: A.) Copy of relevant ordinances within one year or 18 months of permit adoption B.) Provide Water Board with a copy of entire database used to track inspections and enforcement actions as part of the annual report or only provide summary data C.) Provide schematic diagram and brief description of all departments who participate in construction stormwater oversight with first annual report and update annually or provide departmental level information and update in annual report as needed