NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG 2012-2013 Study Cycle.

Slides:



Advertisements
Similar presentations
NTTG Report to TEPPC BiennialTransmission Plan.
Advertisements

Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Public Service Company of New Mexico
Montana Energy Summit Transmission Planning Process April 22, 2008.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
Montana Ambassadors Helena, Montana February 25, 2011.
2013 Alternative Transmission Development Robert H. Easton March 17, 2004 RMATS Stakeholder Meeting.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
1 Local Area Planning Update to TRANSAC – March 11, 2015.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Gaelectric North America Northwest Power and Conservation Council Missoula Meeting January 12, 2011.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
Chelsea Loomis, Regional Electric Transmission Planning.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Houston Import Study Update
Barrilla Junction Area Transmission Improvements Project
TEPPC Review Task Force Meeting February 4-5, 2016
Team Members: Kyle Jones Mark Magee Jason Rippee
Local Area Planning Update to TRANSAC – June 29, 2017
Keegan Moyer Interim Manager, Transmission Expansion Planning
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Western Electricity Coordinating Council
Planning Committee- Map
Study Results PC8-PC16 System Stress Tests
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
TONBRIDGE POWER GREEN LINE
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle

2 Economic Study Request  There were three economic study requests submitted during NWE’s study request window which was from Jan 1, 2012 to Feb 28,  The three request were submitted by the following stakeholders.  1 request by Gaelectric  2 requests by NorthWestern  Information on all 3 requests could be found on NWE’s OASIS under “Transmission Planning – Economic Studies” section.  The 3 requests were accepted by NTTG as sub-regional request and agreed to consider those in their economic study process.  NTTG did not receive any other Economic Studies from other stakeholders.

3 Economic Study Request  The three studies were  Transmission to Northern California (Gaelectric)  Purpose: “To review the best means of building a transmission line within the NTTG footprint from the Great Falls, Montana area (Point of Receipt) to the Malin Substation (Point of Delivery), to carry approximately 1500 MW of renewable wind energy to the California Market by year end 2018.”  Only congestion analysis was requested by the submitter. Economic Benefit analysis was not requested.  Mountain States Transmission Intertie(MSTI) 500 kV Line (NWE)  Purpose: “MSTI will reduce the constraint between Montana and Idaho. The line is being proposed to help move renewable generation to markets such as Arizona, California, the Northwest, etc.”  Submitter directed NTTG to use this project in conjunction with other regional projects to alleviate congestion from Montana to Idaho for newer renewable resources in Montana trying to go to the markets in South.  500 kV Upgrade (NWE)  Purpose: “Respond to renewable generation development and Transmission Service Requests in Montana”  Submitter directed NTTG to use this project in conjunction with other regional projects to alleviate congestion from Montana to Northwest for newer renewable resources in Montana trying to go to the markets in West.

4 Base Cases Used for Economic Study Request   NTTG used two different scenario cases to study congestion for supplying 1500 MW of load at Malin from 1500 MW of resources in Great Falls Montana. » »Heavy Summer (Heavy load in NTTG footprint) » »Heavy Export (Heavy exports from NTTG footprint)   Other mitigations suggested by stakeholders to alleviate congestion. » »500 kV line from Townsend to Midpoint (MSTI) » »500 kV line from Hemingway to Captain Jack » »500 kV line from Midpoint to Hemingway.

5 Conclusions of Economic Study Request   Conclusions of the Study » »Heavy Summer Case: ♦ ♦ 1500 MW transfer can be accommodated in the base case (N-0) without adding any transmission upgrades. ♦ ♦ Possible because of the 30 Common Case Transmission Assumption (CCTA) facilities are included in the case. ♦ ♦ Contingency analysis results show that there are several line thermal overloads and numerous voltage violations that occur for various contingencies even with CCTA Projects. ♦ ♦ Additional transmission upgrades are needed and reactive support is also required at locations in Montana and Wyoming. ♦ ♦ Adding a 500 kV line from Townsend, Montana to Midpoint, Idaho (MSTI project) eliminates all of the significant violations in the heavy summer cases. The study results do not show a substantial improvement in adding the Hemingway to Captain Jack or Midpoint-Hemingway 500 kV lines for the summer load study. » »Heavy Export Case: ♦ ♦ 1500 MW transfer can be accomodated in the base case (N-0) only with upgrades to the Burns and Malin series capacitors even with the CCTA projects present in the base case. ♦ ♦ Contingency analysis results show the need to also upgrade the Garrison series capacitors or add transmission improvements beyond the 30 CCTA projects that are already included. ♦ ♦ Results show that adding a 500 kV line from Townsend, Montana to Midpoint, Idaho (MSTI project) reduces some voltage violations and eliminates the Garrison series capacitor overload, but overloads the Midpoint series capacitors in addition to the ones at Burns and Malin. The study results do show a substantial improvement in adding the Hemingway to Captain Jack and/or Midpoint-Hemingway 500 kV lines for the heavy export study. ♦ ♦ Series Capacitor upgrades at Burns, Malin and Midpoint along with a new 500 kV line from Townsend to Midpoint (MSTI) in lieu of the new 500 kV lines from Hemingway to Captain Jack or Midpoint to Hemingway produces acceptable results.

Economic Study Request Report and Results index.html 6

Economic Study Request Window   NWE’s Economic Study Request window is currently open until February 28,   NTTG Economic Study Request window is currently open until March 31, 2013   Interconnection Wide (WECC TEPPC) Economic Study Request window is currently open until January 31,2013.

8 Biennial Study Status Update   NTTG Technical Study group has performed the study work.   Study work included running contingencies on five different core cases. » »Heavy Summer » »Heavy Winter » »Heavy Export » »Heavy Import » »High COI-PDCI flow.   All cases had the CCTA project included in them.   The different CCTA Projects are shown in next slide.

Map of different CCTA projects 9

10 Biennial Study Status Update   NTTG also performed a Null Case study by removing the CCTA projects to determine if the existing system is adequate to handle the load of   NTTG currently in the process of reviewing the results and developing the final report.   The report should be out by the 1 st quarter of   NTTG also performing sensitivity analysis with the TransWest Express project as requested by the stakeholder.