By G.Satya Vani, FACULTY EXTENTION TRAINING CENTRE, RAJENDRANAGAR, HYD-30.

Slides:



Advertisements
Similar presentations
Barhale Procedure for Site Establishment
Advertisements

Designing House Extensions - draft Supplementary Planning Document (SPD) for consultation Eleanor Parker, Development Management.
The appropriate Government shall, within a period of one year from the date of coming into force of this Act. To constitute an Authority to be known as.
Prepared by: Webmentors Applicable from Financial Year onwards.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
OWNED BY – SANJAY ABHYANKAR Developed by : LEADERS GROUP.
Real Estate Law An Introduction to the Closing Real Estate Law An Introduction to the Closing.
Land Subdivision and Zoning Unit: Owning Property Lesson: Land Subdivision and Zoning.
What Can Local Government Do?. Utah Agriculture Code 4-1-8(1) “the science and art of the production of plants and animals useful to man including the.
Weld County Division 6 Wind Generators and Permitting Requirements Sec Wind generator standards. Chris Gathman, Planner III, Weld County WIND.
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
Punjab Bye Laws for Commercial Buildings. Punjab Bye Laws for commercial buildings Maximum permissible ground coverage is 40% in commercial. Height- Unlimited,
Property Tax in Karnataka
BCC Worksession Ch.31.5 Sign Code Amendments Zoning Division January 6, 2015.
UNIT III BUILDING TYPES Syllabus: Residential, institutional, commercial and Industrial – Application of anthropometry and space standards-Inter relationships.
SITE 1 SITE 2 Site 3 Site 4 SITE 5 Selection of Site -fairly level with good quality of soil. - connected by roads -good communication facilities.
UNIT II SITE PLANNING Syllabus: Surveys – Site analysis – Development Control – Layout regulations- Layout design concepts.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Professional Practice Bye -laws of Amritsar
AMR - APARD ASSIGNMENT OF GOVT. LANDS B. Venkateswara Rao District Revenue Officer (Retd.)
House in Multiple Occupation Presentation Marion Anthony: Private Sector Housing Enforcement Officer Meribel Mujih: Private Sector Housing Enforcement.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
BE MECHANICAL ENG. 1 ST SEM GROUP :-11 ME – D DABHI DASHYANSINH.S 241 VEKARIYA TEJ.R 242 NIL PATEL.J 243 AKSHAY PATEL.A 244 PARTH PATEL 245 MOHIT VERMA.H.
Pradeep. K Mittal Member Central Council of The Institute of Company Secretaries of India, New Delhi Advocate Delhi High Court, Delhi RENTING OF IMMOVABLE.
Ph: ,
Act LXV of 1990 on Local Self-Governments
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
OBJECTS, FUNCTIONS & ROLE OF
C OMPANIES ACT,2013 CA. Arun Saxena Saxena & Saxena Chartered Accountants 811, Ansal Bhawan 16, Kasturba Gandhi Marg, New Delhi – Mob.:
Provisions regarding Registration Compulsory Registration[Rule 9(1)]. Section 6 and Rule 9 C.E Rules 2002 make Registration compulsory for following persons.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Foreign Trade (Regulation) Rules, 1993 Sec 1 Short title and commencement Sec 2 Definitions Sec 3 Grant of special licence  Where any IEC no is cancelled.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
ADOPTION PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 24, 2014.
Affordable housing project
HVACR116 – Trade Skills Construction Sequence. Introduction Construction industry: o Employs about 15% of working people in the U.S. and Canada o More.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
How to Read Site Plans and Development Plans Mary Pennock, Principal Planner Lee Garman, Principal Planner 2014 Commonwealth Planning and Zoning Conference.
Private Sector  Buildings and structures built for ordinary people.
FOREST RIGHTS ACT  An Act to recognize and vest the forest rights and occupation in forest land in forest dwelling Schedule Tribes and other traditional.
Naved Qureshi. Prior to 2005, only NRI's and PIO's were allowed to invest in the housing and the real estate sectors. Foreign investors other than NRIs.
Reuben E. Lee Restaurant (now removed) Island Prime Restaurant.
UNIT II SITE PLANNING Syllabus: Surveys – Site analysis – Development Control – Layout regulations- Layout design concepts.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
GENERAL SYSTEM OF FINANCIAL MANAGEMENT (Including General Principles of Expenditure & Payment)
Development Planning (Health and Sanitary) Regulations 2016 Scope To revise and update Part V of Chapter 10 of the Code of Police Laws and GN110/34 To.
AIRPORT SURVEYS.
DOCUMENTS AND AGREEMENT FOR SALE
Development Control/ Planning Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
AR-315 BUILDING CODES & BYE LAWS
Protected Area Any areas in which tree protection measures are required pursuant to this Chapter, including without limitation any Bluff Conservation Area.
Common Surveys Used For Commercial Real Estate Transactions
introduction Group members: Naveed Saeed Ihsan Tufail Badshah
Architectural Drafting
60th National Town and Country Planners’ Congress
Board of County Commissioners
GENERAL CONCEPTS RELATED TO BUILDING
Oleh : Ir. Sjaifuddin Thahir, MSc.
Site Plan Requirements
Competency: Create site plan drawings
EASE OF DOING BUSINESS An initiative by Govt. of Kerala to reform the business environment in the State.
UNIT I.
UNIT I.
Presentation transcript:

By G.Satya Vani, FACULTY EXTENTION TRAINING CENTRE, RAJENDRANAGAR, HYD-30

 Short Title: APGPLD(L&B)Rules,2002.  Commencement: Dated:  Applicability: All GP’S except the areas falling in UDA, SPECIAL Development Areas, Municipal corporations.  These rules, shall apply to the extent of : levy of fees, inspections, monitoring, taking action on unauthorized developments & building permissions.

APPLICATION IN LAYOUT PERMISSION:  Every person, corporate body, Govt., Private corporate body intends to undertake layout shall apply in writing to Executive Authority in annexure-A.  Pattas prepared by Revenue dept. for the weaker section shall be in accordance with these rules.

 Site plan: scale not < 1:1000 showing all physical details of land i.e., surrounding existing layouts/lands, existing approach roads.  Layout plan: scale not < 1:500 showing boundaries of land, proposed no. of plots with dimensions, width of the proposed roads, area of open place.  A statement of details: Dimensions of each plot, % of area under open spaces, roads, amenities, area of plot.

 High tension / low tension electricity lines, water mains, sewer lines, telephone lines, alignment, right to way of NHW, SHW, major/minor/district roads passing through the layout site.  Certificate of undertaking in prescribed form jointly by owner & qualified surveyor.  Copy of the ownership document.  Copy of Non-encumbrance certificate.  Certificate of demarcation of site by AD.  Layout scrutiny charges and inspection charges as prescribed in the DTCP.  Security deposit as prescribed by the Govt.

 Shall have approach through an existing road not < 10 mts  Minimum width of proposed roads in layout shall be 10 mts for residential & 12 mts for others.  Minimum open space at the rate of 10% of the total site area.  Minimum plot size for Non residential layouts shall be 300 sq mts & 18 sq mts for commercial buildings.  If the land is abutting to NHW having < 60 mts width road, a service road of 10mts width shall be provided.

 The owner of a site shall undertake the works under the supervision of E.O after intimation of approval by the E.O  Leveling with suitable gradients.  Formation of roads with sub-surface curbstones, metalling of the carriage way etc.  Construction of drains and channelization of nalas.  Undertake greenery.  Fencing of open place.  Street lighting.  Protected water supply system.

 The application scrutiny fee shall be paid to the DTCP as prescribed by Govt. from time to time.  At present Rs.100/- per acre or minimum Rs.1000/- up to 10 acres.  Other charges: In addition to the above the EA shall levy development charges and betterment charges as specified by the collector/Govt.

 Layout proposal fulfilling all conditions may be sanctioned with or with out modification with in 90 days.  If not disposed off with in a period of 90 days from the date of receipt in the GP office shall deemed to have been sanctioned.  How ever any construction/development of layout under deemed provision cannot be in contravention of layout rules.

 The permission for layout development shall remain valid for 2 years.  If not completed with in the time shall be revalidated on application and on payment of 10% of the fee & charges.

 The Executive Authority/ DPO may revoke any permission issued under these rules when ever it found false or wrong or any misinterpretation of facts and rules.

 During the execution of any layout any deviation is made from the sanctioned plan the owner shall obtain revised sanction as per the above procedure.

 The owner who has been given sanction shall be wholly and solely responsible for the quality of work and for ensuring safety during the construction.

 The DT&CP officer is the competent authority to accord technical approvals.  The DT&CP officer shall accord tentatively approved layout with in 30 days.  The E.O shall communicate the tentatively approved layout to the owner with in 15 days.  The applicant shall return his acceptance or further modifications if any with in 10 days.

 All the roads and open spaces such as parks and playgrounds earmarked in accordance with these rules in a layout which is approved by the GP shall automatically stand transferred free of cost and vested with the GP free from all encumbrances.

 Application not received in the prescribed form and not accompanied by the documents mentioned in rule 3.  If the proposed roads or streets in the layout does not confine to the provisions of the act.  If the proposed streets are not so planned as to connect at least at one end with the street which is already open.  If adequate area has not been set apart for public purposes.

 Any person who contravenes any of the provisions of these rules be punished with a fine as prescribed by the government.  In case of continuing offence a daily fine shall be imposed until the contravention made good or removed.  Executive Authority shall request owner to take suitable actions including demolition.  Take suitable action against technical personnel which include prosecution or debarring him from further practice up to five years.

 The district panchayat officer or his officers may take any of the above actions and issue suitable instructions to the Executive Officers or any other body for necessary action against the unauthorized lay outs, besides taking action on the E O.

 Unauthorized layouts shall be got regularized from the collector except the areas falling in UDA, SPECIAL Development Areas, Municipal corporations.  Without which no building permission shall be entertained or accorded.  The regularization would be based on levy of pro rata charges for shortfall of open spaces.  Collection of pro rata betterment and development charges and improvement of the roads and drainage etc has to be born by the owner or colony.

 Application for permission to construct building shall be accompanied with a site plan drawn to scale of 1:500.  The existing approach road or means of access.  The boundaries giving the dimensions of the site.  All existing buildings position in the site.  The position of the site in relation to neighboring streets.

 Space to be left about the building to secure free circulation of air, admission of light and access to scavenging purposes.  Any existing physical features such as wells, drains and trees etc.  The ground area of the whole property and the built –up area  The plans of the building drawn to a scale of 1:100  General specifications of proposed building and type of material used.

 Providing or closing of a window or door or ventilator not opening towards others property.  Undertaking fencing or construction of compound wall.  Providing intercommunication doors.  White washing /painting.  Plastering and patch work.  Re-flooring.

 Railways  National highways, state highways and major district roads.  Works undertaking by the district administration/Zilla Praja Parishad/Mandal Parishad /Gram panchayat.  Waterways.  Ports.  Airways and Aerodromes.  Defense.  Any other service which the government may declare to be a public utility services from time to time for the propose of this clause.

 No Sites or parcel of land shall be used for building unless it is approved by the DT&CP but these rules shall not applicable in the case of :  Sites and properties in existing settlement area.  Farm buildings.  Industrial and non-residential buildings abutting to highways/main roads.

 The minimum requirement of plot area for non-residential, industrial buildings and the building proposed consisting of G.F + 2 floors and above except commercial or mercantile buildings shall be 300 sq. meters.  The minimum requirement of plot area for residential Apartment’s, Complexes shall be 335 sq mts.

 In Grama Khantam/ Settlement area shall be 3.6 mts.  Out side settlement area shall be 10 mts.  All residential/ non-residential buildings shall be 12 mts.  Proximity of electricity supply lines withholding permission (Indian Elec. Act 1910).

 Height permissible 9mts for G + 2 floors in Gram Khantam and 13mts for G + 3 floors in Revenue survey numbered areas in GP’s.  SETBACKS: front setback 1.50 mts, Rear setback 1.00 mts in Grama Khantam.  REVENUE SURVEY NUMBERS: front setback 3.00mts, Rear setback 2.00 mts, Side Setbacks 1.50 mts on each side.

 In Gram Khantam/ Settlement areas: Height permissible 9metres for G +2 floors  SETBACKS: Front Setback 1.50 mts, Rear Setback 2.00 mts.  REVENUE SURVEY NUMBERS: Height permissible 13 Mts for G + 3 floors for Residential & 15mts for G + 4 floors for Non-residential areas.  For building abutting highways a building line of 6 mts shall be maintained irrespective of the plot size.  In case of corner plot the front building setback shall be left on all sides abutting the roads.

Plot size (in sq mts)Minimum setbacks(in meters) Road sideRearSides (1)(2)(3)(4) Up to and up to and up to Above 151 and up to Above 301 and up to Above

 No building shall be allowed in the bed of water bodies, rivers,lake, pond or nala etc.  No building activity shall be carried out within 30 meters from the boundary of River and lake of surface area.  15 mts from the boundary of lakes of surface area for less than 10 hec.  9mts from Nalas, Canals etc.

 For building activity within the restricted zone near airport or Defense areas necessary clearance from the concerned authorities.  In case of sites in vicinity of high tension electricity transmission lines minimum safety distance 3 mts.  In case of Railway line, a minimum distance of (30) mts shall be maintained from the edge of the Railway property.

 Chajjas/ weather sheds of width not exceeding 60 cm shall be allowed in the setbacks.  In case of plots more than 300 sq mts, a cow shed, open staircase may be allowed in residential areas. Non residential area parking sheds, guardroom, overhead tank, sump, septic tank, well, balconies shall be allowed in Rear or Front setbacks.

Category of building activityParking area as percentage of total build-up area. (1)(2) Residential complexes, hotels, restaurants, lodges, cinema halls, business buildings, commercial buildings, kalyana mandapams, Offices. 20% Hospitals, Institutional building, industrial schools, colleges and other educational buildings. 10%

 The Executive Authority shall levy application and scrutiny fees for all applications except weaker section housing.  In addition to the above the EO shall levy development charges, Betterment charges as specified by the collector or government.

 15 days in case of residential building permission and 30 days for other buildings  Duration of sanction valid for 1 year.  Revoking of permission: The E.O or DPO may revoke any permission.  If any deviations made in sanctioned plan, the owner shall obtain revised sanction.  The owner shall be wholly and solely responsible for development and safety.

 All building permissions for complexes.  All building permissions heights more than 3 floors or 9 mts.  All cinema Theaters, Petrol pumps, LPG Storage godowns, cellars, stilt constructions.  All layouts.  All commercial buildings, shops other than residential.