1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.

Slides:



Advertisements
Similar presentations
51 st GRSP Session Draft new Regulation on child restraint systems Pierre CASTAING Informal document GRSP (51 st GRSP, May 2012, agenda item.
Advertisements

Flex PLI GTR Status 1-2 December 2011 Bernard Been Informal Group GTR9 PH2 GTR9-1-08r1.
Information for the Flexible Pedestrian Legform Impactor (Flex-PLI)
50th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (50th GRSP, December 2011, agenda item.
47th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman FI
NHTSA Evaluation of the Flex- GTR Legform on US Vehicles
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
GTR9-C-04 History of Development of the Flexible Pedestrian Legform Impactor (Flex-PLI) November 3rd, 2011 Japan.
CoastdownVH&C Onboard Anemometry Ford Motor Company North America WLTP-11-14e.
Head Restraint GTR Status to AC th Session of WP.29 March 2007 Informal document No. WP , March 2007, agenda item II
Checklist for Vehicle Testing GTR Round Robin FlexPLI Logbook for each leg to be sent with the leg to record the following: Certification tests.
Progress report of TFG 7 “Fire resistance test” Mar 18, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
GRSP / IWG-CRS Status report for the fifty-seventh session (18-22 May 2015) of GRSP 17/05/2015the fifty-seventh session (18-22 May 2015) of GRSP1 Submitted.
Status report GRSP IWG ECRS 53rd GRSP Geneva May 2013 Informal document GRSP (53 nd GRSP, May 2013, agenda item 19)
ECE Regulation N°94 & N°13X 19/05/201455th Session GRSP May 2014 Status report IWG FI 55th session of GRSP May 2014 Informal document GRSP
Update on Pedestrian Leg Testing
Ministry of Land, Infrastructure and Transport Clarification of Relaxation Area(s) for Flexible lower legform to bumper test Submitted by the expert from.
1 Consideration on ACL/PCL Failure Evaluation Transmitted by the expert from JAPAN December 2009 Geneva Informal document No. GRSP (46th GRSP, 8-11.
Lower/Upper Bumper Reference Line Data on existing vehicles INTERNATIONAL ORGANIZATION OF MOTOR VEHICLE MANUFACTURERS.
To Conduct FlexPLI Round Robin Car Test Smoothly and Effectively We had 10 organizations offering to join the FlexPLI Round Robin Car Tests. To conduct.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
Fourth progress report of the informal group on Phase 2 of gtr No. 9 (IG GTR9 - PH2) Transmitted by the experts of Japan and Germany Informal document.
Atsuhiro Konosu Chairperson of Flex-TEG, Japan Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status.
Slide 1 Flex PLI Inverse Test Setup - Moving Ram Friction Dirk-Uwe Gehring BGS Böhme & Gehring GmbH 5 th Meeting of the IG GTR9-PH2 Bergisch Gladbach,
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
Leg Feasibility Testing 9 th GRSP Ad Hoc Meeting Geneva, Switzerland December 5-6, 2005.
Difference of TRL legform impactor/injury criteria and Flex pedestrian legform impactor/injury criteria 16 May 2011 Japan Informal document GRSP
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
FlexPLI Rebound Phase 7 th IG GTR9-PH2 Meeting 3/July/2013 Japan Automobile Standards Internationalization Center (JASIC) GTR
Atsuhiro Konosu Chairperson of Flex-TEG, Japan Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Status Report.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 66 Geneva, 06 June 2013 Informal document No. GRPE (66th GRPE,
1 Atsuhiro Konosu Chairperson of Flex-TEG, Japan Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities.
GTR Industry proposal (update) to identify the relevant measuring results in FlexPLI to vehicle tests to be compared to the Flex-PLI requirements.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
Introduction to Revision of GTR 7
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
51 st GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (51 st GRSP, May 2012, agenda item.
Draft Status Report of the BioRID TEG Bernd Lorenz (BASt) Chairman 51 st GRSP Geneva, 21 st May 2012 Informal document GRSP (51st GRSP, 21–25 May.
Flex-GTR Master Leg Level Impactor Test Data - Pendulum Test - June 28, 2013 Japan Automobile Standards Internationalization Center (JASIC) 1 GTR
GTR & Page 1 Technical Specification and PADI Procedures for Assembly, Disassembly and Inspection Presented by the pedestrian safety.
Proposal of the Informal Working Group on Head Restraints GTR Phase 2 JAPAN Informal document No. GRSP (43rd GRSP, May 2008, agenda item.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
Pedestrian Safety Effects of Bumper Test Area Determination Using the Old vs. the New Method Presented by the experts of OICA Informal document GRSP
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Pedestrian Safety Request For Clarification Of Test Procedures 49 th Session of UNECE GRSP, Geneva, 16 – 20 May 2011 Informal document GRSP (49th.
TPMS OICA POSITION Informal document No. GRRF-64-29
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Flex PLI Technical Evaluation Group (Flex-TEG) Status Report
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
Report and explanation document of SBR-TF
Status report GRSP IWG FI
Proposals from the Informal Working Group on AEBS
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Introduction to Revision of GTR 7
Update on Pedestrian Leg Testing
1. Summary # items RESULTS status remarks EV_1 HEV system power
Chair: Jin Seop Park, Republic of Korea Secretary: Irina Dausse, OICA
Informal document GRVA st GRVA, September 2018
Proposals from the Informal Working Group on AEBS
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Overview of the recommendations on software updates
Summary of Proposed Amendment to gtr 9
Introduction to Revision of GTR 7
52nd GRSP Session Status report of Informal Group on FI
IWG TYREGTR 17th Meeting* Brussels, ETRTO Office, 2-3 November 2017
Sustainable Mobility & Automotive industry Unit
Chairperson of Flex-TEG, Japan
FIA position on Lifecycle of a vehicle type* vs. Lifetime of a vehicle
Status of discussion after 8th meeting
Presentation transcript:

1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Transmitted by the expert from Japan Informal document No. GRSP (47th GRSP, May 2010, agenda item 4.1)

2 Flex-TEG Activities 1 st Flex-TEG Meeting (OICA office, Paris, 5-6 Sep. 2005) 2 nd Flex-TEG Meeting (BASt, Bergisch Gladbach, 22 Nov. 2005) 3 rd Flex-TEG Meeting (BASt, Bergisch Gladbach, 24 Apr. 2006) 4 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 2 Apr. 2007) 5 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 7 Dec. 2007) 6 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 31 Mar. 2008) 7 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 8 Dec. 2008) 8 th Flex-TEG Meeting (TUV Rheinland Group, Cologne, 19 May 2009) 9 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 3-4 Sep. 2009) 10 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 1-2 Dec. 2009) 11 th Flex-TEG Meeting (ACEA office, Brussels, 21 Apr. 2010) 1 st Flex-TEG Meeting (OICA office, Paris, 5-6 Sep. 2005) 2 nd Flex-TEG Meeting (BASt, Bergisch Gladbach, 22 Nov. 2005) 3 rd Flex-TEG Meeting (BASt, Bergisch Gladbach, 24 Apr. 2006) 4 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 2 Apr. 2007) 5 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 7 Dec. 2007) 6 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 31 Mar. 2008) 7 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 8 Dec. 2008) 8 th Flex-TEG Meeting (TUV Rheinland Group, Cologne, 19 May 2009) 9 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 3-4 Sep. 2009) 10 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 1-2 Dec. 2009) 11 th Flex-TEG Meeting (ACEA office, Brussels, 21 Apr. 2010) 2 nd - 10 th Meetings BASt or TUV Rheinland Group meeting room at around Cologne 1 st - 11 th Flex-TEG meetings 1st Meeting OICA office in Paris Image photo 11 th Meeting ACEA office in Brussels Image photo

3 Flex-TEG Activities, contd. 1 st Flex-TEG Meeting (OICA office, Paris, 5-6 Sep. 2005) 2 nd Flex-TEG Meeting (BASt, Bergisch Gladbach, 22 Nov. 2005) 3 rd Flex-TEG Meeting (BASt, Bergisch Gladbach, 24 Apr. 2006) 4 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 2 Apr. 2007) 5 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 7 Dec. 2007) 6 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 31 Mar. 2008) 7 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 8 Dec. 2008) 8 th Flex-TEG Meeting (TUV Rheinland Group, Cologne, 19 May 2009) 9 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 3-4 Sep. 2009) 10 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 1-2 Dec. 2009) 11 th Flex-TEG Meeting (ACEA office, Brussels, 21 Apr. 2010) 1 st Flex-TEG Meeting (OICA office, Paris, 5-6 Sep. 2005) 2 nd Flex-TEG Meeting (BASt, Bergisch Gladbach, 22 Nov. 2005) 3 rd Flex-TEG Meeting (BASt, Bergisch Gladbach, 24 Apr. 2006) 4 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 2 Apr. 2007) 5 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 7 Dec. 2007) 6 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 31 Mar. 2008) 7 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 8 Dec. 2008) 8 th Flex-TEG Meeting (TUV Rheinland Group, Cologne, 19 May 2009) 9 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 3-4 Sep. 2009) 10 th Flex-TEG Meeting (BASt, Bergisch Gladbach, 1-2 Dec. 2009) 11 th Flex-TEG Meeting (ACEA office, Brussels, 21 Apr. 2010) 1 st - 11 th Flex-TEG meetings st2nd3rd4th5th6th7th8th9th10th Flex-TEG Impactor type & Activity Flex-G Evaluations JAMA, JARI, J-MLIT BASt, ACEA, NHTSA Flex-GT Developments JAMA, JARI Evaluations JAMA, JARI, J-MLIT BASt, ACEA, NHTSA Flex-GTR Developments JAMA, JARI, FTSS Evaluations JAMA, JARI, J-MLIT, BASt ACEA, NHTSA, K-MLTM th Evaluations ACEA Ford-US

4 Latest Flex-TEG Activities (11 th Flex-TEG meeting) 11 th Flex-TEG meeting Date : 21 st April 2010 Place: ACEA office, Brussels, Belgium A. Konosu ( Chairperson/J-MLIT/JARI ) * M. Burleigh ( Secretariat/FTSS-Europe ) * O. Zander (BASt) D. Gehring (BGS) F. Minne (UTAC)* O. Ries (ACEA/VW)* T. Kinsky and B. Buenger (ACEA/Opel) R. Fleischhacker (ACEA/Porsche) C. Hess (ACEA/Audi)* A. Sipido (ACEA/Ford Europe) N. Lubbe (ACEA/Toyota Europe) A. Pott (ACEA/Hyundai Motor Europe)* A. Otubushin (ACEA/BMW)* F. Travert (ACEA/PSA) R. Ciclloni (ACEA)* Y. Takahashi and I. Imaizumi (JAMA/Honda R&D)* D. Martin (DTS)* C. Roesch (Cellbond) * Phone and Internet Access Total: 20 persons Attendances

5 Main Agenda of the 11 th Flex-TEG meeting 5. Information: Flex-GTR-prototype Technical Evaluation Test Results (ACEA) 6. Finalizations: Injury Threshold Values (Tibia Relaxation Zone, ACL Requirement) 7. Information: Catch rope bracket, 400 Nm Loading Test and CAE status (FTSS) 9. Future Action Plans 8. Minor Updates: gtr 9 amendment (Corrigendum: Knee measurement locations) Main Discussion Topic!

6  Evaluation Tests had been conducted by ACEA. Latest Flex-TEG Activities (11 th Flex-TEG meeting) Round Robin Tests (ACEA) Still some open questions due to limited experiences and missing availability of a simulation tool Ongoing to allow all manufactures at least some tests Proposal: Test data during impactor Rebound Phase shall be ignored. TEG agreed. ACEA/BGS will make a proposal how to cut the rebound phase test data within two weeks. Technical Feasibility Study (ACEA) Continuing, FE Model necessary to assess impact on vehicle design Rebound Phase Impact Phase Remove rebound phase test data 5. Information: Flex-GTR-prototype Technical Evaluation Test Results (ACEA)

7 Latest Flex-TEG Activities (11 th Flex-TEG meeting) 6. Finalizations: Injury Threshold Values (Tibia Relaxation Zone, ACL Requirement)  TEG had an extensional meeting regards to 1) Tibia Relaxation Zone and 2) ACL requirement on 26 April, and then finally, TEG made their proposals as follows, TEG Proposal for Tibia Relaxation Zone (Main Points) Initial 5 yearsAfter 5 years Tibia Requirement (Relaxation Zone) PreambleFor feasibility reasons, TEG is proposing to introduce relaxation zones with a total width of 264 mm allowing a maximum tibia bending moment of 380 Nm for the first five years after the agreement of the incorporation of the FlexPLI into the GTR, providing the possibility to verify its technical need. Corresponding data should be collected and evaluated until the end of the initial 5 years. Based on those results the relaxation zone should be kept, modified or dropped. Main TextRelaxation zone: 380 Nm (264 mm width) A contracting party may restrict application of the relaxation zone requirement in its domestic legislation if it decides that such restriction is appropriate. (update after 5 years based on the above preamble) Main Discussion Topic!

8 Latest Flex-TEG Activities (11 th Flex-TEG meeting) 6. Finalizations: Injury Threshold Values, contd. (Tibia Relaxation Zone, ACL Requirement) TEG Proposal for ACL Requirement (Main Points) Initial 5 yearsAfter 5 years ACL/PCL Requirement PreambleTEG strongly recommends to the contracting parties of the 98 agreement to monitor the ACL/PCL elongation against a threshold value of 13 mm for the first five years after the agreement of the incorporation of the FlexPLI into the GTR. 13 mm mandatory unless the results of possible new research will lead to additional biomechanical data, providing additional information on biomechanical limits, allowing the development of a set of injury risk curves, and the derivation of corresponding threshold values. Based on the results, it should then also be decided whether the PCL criterion should be introduced as a mandatory threshold value or kept on being monitored against the ACL threshold. Main TextACL/PCL threshold = 13 mm. TEG recommends to the contracting parties of the 98 agreement to monitor the ACL/PCL elongation against a threshold value of 13 mm for the first five years after the agreement of the incorporation of the FlexPLI into the GTR. (update after 5 years based on the above preamble) Main Discussion Topic!

9  FTSS informed Catch rope bracket, 400 Nm loading test status and CAE status. Latest Flex-TEG Activities (11 th Flex-TEG meeting) 7. Information: Catch rope bracket, 400 Nm loading test results and CAE status (FTSS) Catch rope bracket (optional parts) TEG accepted the catch rope bracket as one of an optional part of Flex-PLI. 400 Nm loading test results No serious issue occurred under 400 Nm loading tests on the bone cores so far. TEG offered to FTSS to continue the 400 Nm loading tests to change the bending stopper cable start timing to 400 Nm (for tibia relaxation zone). CAE status FTSS explained that their CAE Models are validated at material, component, pendulum and inverse test level. Requirements were set for next release based on OEM vehicle testing. ACEA asked to continue the model validation/improvement under car impact test level based on feedback from car impact test to use for their technical feasibility study.

10  Corrigendum on the Knee measurement locations were made by JARI. Latest Flex-TEG Activities (11 th Flex-TEG meeting) Corrigendum: Knee measurement locations TEG accepted the editorial corrigendum (editorial corrections). 8. Minor Updates: gtr 9 amendment (Corrigendum: Knee measurement locations)

11 ACEA/BGS: Make a proposal how to cut the rebound phase test data within two weeks (by 5 th May 2010).  Information: ACEA made a proposal, and then other 11 th TEG members agreed. FTSS: Continue 400 Nm loading test to change the bending stopper cable start timing to 400 Nm (for tibia relaxation zone).  Information: JAMA/JARI are going to conduct the 400 Nm loading test to assembled bone instead of FTSS before the 47 th GRSP meeting. Japan: Japan are going to submit an informal document regards to corrigendum on the ECE/TRANS/WP.29/GRSP/2010/2 based on the 11 th Flex-TEG meeting results (to 47 th GRSP meeting). ACEA: Continue their Technical Feasibility Study. FTSS: Continue to enhance their CAE model validation/update under car impact test level. Latest Flex-TEG Activities (11 th Flex-TEG meeting) 9. Future Action Plans

12 Thank you for your attentions!