Analysis of ARR & Tariff Proposal of WESCO for FY 2011-12 February 07, 2011 World Institute of Sustainable Energy (Consumer Counsel)

Slides:



Advertisements
Similar presentations
…Message Box ( Arial, Font size 18 Bold) Presentation Title ( Arial, Font size 28 ) Date, Venue, etc..( Arial, Font size 18 ) Suggestion/Objections to.
Advertisements

Tariff. The rate at which electrical energy is supplied to a consumer The rate at which electrical energy is supplied to a consumer Therefore tariff naturally.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
1 A Presentation on ARR & Tariff Proposal of OPTCL for FY Analysis/Objections/Suggestions February 6, 2008 By Dr. Shibalal Meher (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Madras Chamber of Commerce & Industry and India Energy Forum Session on Rationalisation of Electricity Tariffs Anand Madhavan Head – Energy & Urban Infrastructure.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Analysis of ARR & Tariff Proposal of SLDC Consumer Counsel.
ACCOUNTING MECHANISM. Accounting Documents and Records.
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Prayas Energy Group, India Regulatory process to enhance transparency and accountability: examples from India Bishkek, September 2011 Presentation By Prayas.
1 A Presentation on ARR & Tariff Proposal of GRIDCO for FY Analysis/Objections/Suggestions February 7, 2008 By Dr. Shibalal Meher (Consumer Counsel)
2008 Budget Headlines Final tax increase is 9.38%, which includes 4% levy cap ($797,748), plus ($1,094,808) in State pass throughs. State Aid allocation.
2006 Budget Challenges Additional Increases in Pension Contributions = +$451,200 Additional Assessment from RVSA = +$315,000 Increases in Fuel and Utility.
Discussion on Power Tariff in Delhi Jointly organized by Rajiv Gandhi Institute for Contemporary Studies (RGCIS) & energywatch 6 th May 2003, New Delhi.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
1 ARR and Transmission Tariff Proposal of OPTCL for FY Together, let us light up our lives. ORISSA ELECTRICITY REGULATORY COMMISSION.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
1 A Presentation on ARR & Tariff Proposal of NESCO for FY Analysis/Objections/Suggestions By Dr. Shibalal Meher (Consumer Counsel) Nabakrushna.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
1 APresentationon ARR & Tariff Proposal of NESCO for FY BroadSuggestions/Objections Broad Suggestions/Objections Feburary 12, 2007 Together, let.
Theft in Domestic and Commercial sectors 1Non-metering for want of meters, resulting in arbitrarily assessed consumption 2Tampering of meters 3Wrong recording.
Analysis of ARR & Tariff Proposal of SOUTHCO for FY February 10, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
2008 Total Tax Collections $125,663, Budget Headlines State Aid allocation has significantly decreased again in the amount of $315,928. Total.
1 APresentationon ARR & Tariff Proposal of WESCO for FY BroadSuggestions/Objections Broad Suggestions/Objections Feburary 13, 2007 Together, let.
1 Analysis of OPTCL’s ARR and Transmission tariff for FY By: World Institute of Sustainable Energy, Pune (Consumer Counsel) 4 th February, 2011.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Analysis of ARR & Tariff Proposal of OHPC World Institute of Sustainable Energy Consumer Counsel.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Analysis of ARR & Tariff Proposal of NESCO for FY February 09, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
1 A Presentation on ARR & Tariff Proposal of SLDC for FY Analysis/Objections/Suggestions February 8, 2008 By Dr. Shibalal Meher (Consumer Counsel)
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
2016 Water and Wastewater Rates Committee of the Whole November 16, 2015 Presenter: Mike Mayes – Director, Financial Services/Treasurer.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
Electricity pricing Tariffs.
The Association of Municipal Electricity Undertakings (Southern Africa) NERSA Public Hearing Municipal Tariff Guideline, Benchmarks and Timelines /12.
ARR & Price Proposal of GRIDCO For FY and Views of Stakeholders February 15, 2007 Together, let us light up our lives. ORISSA ELECTRICITY REGULATORY.
FY PROPOSED BUDGET  A "Target Level" expenditure base was established for all departments six- months’ worth of operations (July 1, 2016 – December.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Portugal Cove - St. Philip’s
Setting Up a New Recharge Center
MOUNTAIN REGIONAL WATER
City of Sisters, OR 2017 Water & Sewer Rate Study
Ag Bank Sim the Bank Management Game
Overview of Dover Town Operating Budget Fiscal Year 2019
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
City of Lebanon, Missouri Electric Department
FY 2018/19 Recommended Budget Town of Manchester, Connecticut
Island Energy Advisory Committee Board
PUBLIC SCHOOL FINANCE UPDATE November, 2011
Energy Management PPKSE 06/07 SAA.
REVIEW PETITION IN TARIFF ORDER FY18
Presentation transcript:

Analysis of ARR & Tariff Proposal of WESCO for FY February 07, 2011 World Institute of Sustainable Energy (Consumer Counsel)

ARR submission and Proposal of WESCO

ARR submission of WESCO ARR Projected Power purchase cost Employee Cost362.7 A&G Cost38.4 R&M Cost50.21 Depreciation33.27 Bad Debts47.16 Interest & Finance charges62.34 Reasonable return7.78 Amortization of Regulatory Asset48.67 Truing up of Revenue Gap ( FY ) Contingency Reserve3.49 Total ARR Sale of Power at existing tariff Other non tariff Revenue Total Revenue Relisation Revenue Gap with existing Tariff In Rs. Cr.

Prayer of WESCO The licensee requests the Hon’ble Commission to accept the proposal of ARR and bridge the revenue gap through combination of – grant/subsidy from the state govt., – reduction in BST and/or – increase in RST in appropriate manner.

Proposed Tariff Rationalisation Measures 1.Provision of 120% of CD for industry should be withdrawn 2.Delayed payment surcharge 3.KVAH billing for three phase LT & HT industrial consumers 4.Demand charges for consumers having contract demand more than 70KVA through HT supply 5.Payment of demand charges for CPPs 6.Discontinuance of load factor incentive in Energy Charges 7.Fixed charges for LT industrial (S & M), specified public purpose and public water works 8.Tariff for Medium Industries Consumers 9.Monthly Minimum Fixed Charges for consumers with contract demand < 110 kVA 10.Security deposit for providing meter and metering installations 11.Demand charges and monthly minimum fixed charges 12.Inspection fees of lines and substations 13.Billing of lift irrigation points

Analysis of ARR by Consumer Counsel

Revenue GAP of WESCO for FY (in Rs Cr)

Annual Revenue Requirement WESCO ( Cr) ARR Approved Projected % Change Power purchase cost Employee Cost A&G Cost R&M Cost Depreciation Bad Debts Interest & Finance charges Reasonable return Amortization of Regulatory Asset Truing up of Revenue Gap for FY Less Expenses Capitalized Contingency Reserve Total ARR Observation: WESCO has proposed 35.19% hike in ARR for

Computation of ACS of WESCO ParticularsUnitLicensee projection for FY Energy Purchase MU Distribution loss%31.30 Collection Efficiency%98 Salable unitMU Average cost of supplyPaisa / kWh (at BSP 194 P/U) * As per data submitted by the licesee in the ARR

Submission on Cost Components of ARR

Power Purchase Cost Analysis Important Factors: 1.Utilization of proposed power 2.Demand forecasts 3.Distribution Loss 4.Collection Efficiency 5.AT & C Loss

Utilization of Purchased Power (FY 11-12) Observation: HT & EHT sale contribution is 43% Distribution loss ( 31%) is more than total LT sale (26%)

Demand Forecasting Sale/ Purchase FY (MU)FY Projection in ARR (MU) Projected in ARR Revised Estimates ( actual data of Six months) % Change (over Projected) LT HT EHT Total Sale Total Purchase Observation: Utilities demand forecast need to be checked. During FY , total lakh LT consumers are suppose to be added, still the reported total sale / purchase of power is nearly same. Incorrect estimation of energy will affect the drawl schedule of licensee as well as force GRIDCO for purchase costly power. ( projected dis loss, FY : 34.08%, : 31.30

Distribution Loss (%) Approve d in ARR Approve d in BP Actual Audited / projected Performance Below BP (11.1) ( 8.6 ) ( 11.3) (p)? (p)? Observation: There is huge gap in projected (31.29%) and approved (19.7%) distribution loss. Further, trend of actual distribution loss is increasing. Licensee has made provision of Rs Cr for SI in ARR as against the approval in BP of Rs Cr. Submission: Loss of revenue realization / higher energy purchase due to (11.59%, MU, Cr) higher distribution loss should not be allowed to passed on to consumer.

Collection Efficiency (%) Approved in ARR Approved in BP Actual Audited / proposed Performance ? ? Observation: Collection efficiency proposed is lower by 1 % than that of approved in BP. Gap between the approved and actual collection efficiency is widening. Utility need to take effective steps to further improve the collection efficiency. Submission: Loss of revenue realization due to 1% lesser collection efficiency (than that of approved in BP)should not be passed on to consumer.

AT & C Loss (%) Approved in ARR Approved in BP Actual Audited / proposed Performance ? ? Observations: Licensee has proposed 32.60% AT&C Loss. 96% Metering covered till Sept Low Agriculture Consumption. Possible reason for high AT &C Loss may be examined 1)Lower HT to LT ratio. 2)Poor Power factor 3)Aged transmission lines and poor jointing 4)Less energy Audits 5)Faulty meters and metering 6)Higher thefts One energy police stations is functioning out of proposed Nine. ( 3.81 cr prop in ARR)

Distribution Loss excluding EHT consumption FY Actual FY Proposed FY Revised Estimates FY Proposed Overall Distribution Loss 35.09%28.45%34.08%31.29% Distribution Loss Excluding EHT consumption 46.90%37.01%43.78%40.03% Distribution Loss Approved in BP 22.5%19.83%19.7% LT Distribution Loss Approved in ARR 29.4% Observation: Distribution loss in HT and LT level is much higher than the overall distribution loss (taking together LT, HT and EHT consumption) and approved distribution loss in BP. Submission: Utility needs to explore various measures to reduce LT and HT distribution loss. Further, faulty metering and power theft needs to be drastically reduced with the help of dedicated flying squad and energy police stations. Such energy police stations directly controlled by senior police officer attached to energy department could improve the efficiency.

ARR cost component – Employee Cost Observation: The utility has proposed the Employee cost of Rs Cr in ARR with % hike from the earlier FY Employee Cost per unit of Energy Purchase (Paise/Unit) % Rise in FY over FY FY (App)FY (App)FY (App)FY (Prop) CESU SOUTHCO NESCO WESCO

ARR cost component – A&G Cost Observation: Utility has proposed A&G expenses of Rs Cr for FY which are 54.9% higher than that of approved expenses for FY Submission: The Commission has approved A&G expenses of Rs Cr in ARR for FY As per the LTTS order since it is a controllable cost, 7% escalation may be allowed on the approved value of In case of additional A&G cost claimed towards 9 energy police stations may be allowed A&G Cost (Paise/Unit) % Rise in FY over FY FY (App)FY (App)FY (App)FY (Prop) CESU SOUTHCO NESCO WESCO

ARR cost component – R&M Observation: Utility has proposed Rs Cr as R&M expenses. These expenses were projected as 5.4% of the opening GFA of Rs Cr. at the beginning of FY Submission: Utilities GFA approved by commission as on were Cr. Utility has projected the GFA as Rs Cr. at the beginning of ensuring year. Which seems to be on higher side. Therefore Hon. Commission should scrutinize the new additional GFA (during Fy 10-11) and equivalent R&M be allowed to pass through in the ARR.

Truing up for Observation :  Licensee has projected the uncovered revenue gap of ( Cr) as on FY based on audited accounts with licensee  Further based on the actual data of first half of the current year & estimate of second half (FY 10-11), the licensee has arrived at an uncovered gap of ( Cr) for FY & same is claimed & requested for truing up in the ARR of FY Submission  Hon Commission has carried out the updated truing up exercise (provisional) up to FY in the ARR of FY based on the audited accounts of WESCO and the performance standard outline in the Business Plan. At the end of FY the licensee has surplus gap Cr.  Amount claim for truing up may not allowed to be pass through in the ARR before final truing up.

ARR cost component – Provision for Bad Debt Observation: Utility has proposed Rs Cr as provision for Bad Debt by considering 98% collection efficiency as against 99% approved in BP. Submission: Provision of bad dept 1% (due to the 1% lower collection efficiency) should not be allowed to be passed on to consumer through ARR which accounts to Rs Cr.

ARR cost component-RoE Observation: As proposed equity capital is constant for the current and ensuring year. There is no equity capital infusion. Hence the Return on Equity should remain same as that of approved for FY Submission: Proposed RoE (Rs Cr) may be allowed to pass through in the ARR.

Per Unit Distribution Cost Per Unit Distribution Cost (Paise /Unit) % Rise in FY over FY % Rise in FY over FY10-11 FY (App)FY (App)FY (Prop) CESU SOUTHCO NESCO WESCO

Tariff proposal – Other Issues

Consumer category Number of Consumers Position on ( ) Position as on Addition in FY % Increase (1/4/10 to 1/4/11) Proposed Addition during FY % Increase LT Domestic % Kutir Jyoti <=30 kWh % Total LT domestic Impact of BPL consumers Observation:  The growth of BPL consumers is increasing due to GoI / GoO rural electrification schemes : growth in FY ( 1104%) & anticipated in FY ( 692% ) as per submission in ARR.  It is predicted that the cumulative BPL consumer in Orissa will raise to 40 lakh by end of , accordingly the BPL consumers in WESCOS area will further increase. Submission:  In above situation, it will be difficult to maintain the EHT, HT & LT tariff so as to keep the cross subsidy within (+ / - ) 20% of average cost of supply..  The OERC may recommend GoO to give upfront subsidy to DISCOM to cater the BPL consumer in the state.

Submission of Consumer Counsel Submission The Hon Commission may consider to create new LT category and impose higher tariff for a pplicability of Electricity used for the purpose of advertisements, hoardings and other noticeable consumption such as external flood light, displays, neon signs at departmental stores, malls, multiplexes, theatres, clubs, hotels and other such entertainment/leisure establishment Benefits. Improve the cash flow of DISCOM to some extent Help to adopt Energy conservation measures, the electricity otherwise wasted in unproductive purposes May opt for roof top SPV installation Example LT VIII category in MH, Fixed charge Rs 400 / month, Energy charge : Rs 16 /kWh

Submission of Consumer Counsel Energy demand projected by WESCO need to assessed once again based on projected growth of LT consumer Loss of revenue realization due to 1% lesser collection efficiency should not be allowed to pass through in ARR. Nominal DPS to LT consumers if allowed could help to improve the collection efficiency. The Utility has not taken any step to reduce distribution loss in the line of recommendations of the Kanungo Committee and OERC.. Utility needs to explore various measures to reduce LT and HT distribution loss. Faulty metering and power theft needs to be drastically reduced with the help of dedicated flying squad and energy police stations. Such energy police stations if directly controlled by senior police officer attached to energy department could improve the efficiency. Higher A&G expenses should not be allowed to pass through in the ARR. Higher R&M should not be allowed to pass through in the ARR. Rs Cr higher provision for bad debt should not be allowed to pass through in the ARR.. Licensee should make effort to collect arrears in order to reduce deficit. ARR can be reduced by increasing collection efficiency, reducing losses and measures suggested by consumer counsel in the submission.. Hon. Commission may kindly consider all above facts and decide the retail tariff in the best interest of all category of consumers.