AMI Door to Balloon Time. Overview Primary entry for ST-Segment Elevation Myocardial Infarction (STEMI) patients is through our emergency room. Improvement.

Slides:



Advertisements
Similar presentations
Aim: Advance the adoption of proven strategies to improve the reliability, safety and quality of care received by patients in Tennessee hospitals.
Advertisements

Reading ARDT Teams September 10 & 11, Agenda Your Role Your Role Big Picture Big Picture PLC for ARDT PLC for ARDT CI support CI support Plan on.
Retooling Transitional Housing
THE CODE STEMI PROJECT: Winning the Race
INTERDISCIPLINARY COLLABORATION TO REDUCE D2B TIME Andrew Ball, MD Abington Memorial Hospital.
Coming Full Circle: AMI & Med Rec Across the Continuum Western Node Collaborative Kelowna General Hospital AMI IMPROVEMENT TEAM.
Acute Myocardial Infarction (AMI) JCAHO Core Measure Project Loyola University Medical Center Team Members: K. McLean MD, M. Morrow MSN, J. Cochran BSN,
The Nebraska Heart Institute Heart Hospital Influencing and Shaping the Future of Health Care.
GAP-D2B An Alliance for Quality. GAP-D2B Goal n To achieve a door-to-balloon time of
Acknowledgements RHH ED staff Safety and Quality Unit RHH for their participation and valuable contribution Next Steps It is envisaged over the next 12.
D2B: Door-to-Balloon Initiative Guidelines for Kaleida Health.
The Power of the Glove: Rural EKG Transmission A Pilot Study among E.M.S. Providers to Expedite Rural Heart Attack Care One Year Later….. Angela Powell,
Cardiac Reperfusion Team Protocol Reduces Door-to-Balloon Time at Hamot Medical Center Antonios D. Katsetos, DO, Thomas Williams, MS, Theresa Kisiel, CRNP,
D2B Strategies and the Role of the Emergency Department John J. Kelly DO, FACEP Associate Chair, Emergency Medicine Albert Einstein Medical Center Associate.
FOCUS Voluntary Community, May 2011 IMAGING IN FOCUS.
OVERALL CATHETERIZATION LABORATORY NORMAL ANGIOGRAPHY RATE DOES NOT INCREASE WITH EMERGENCY ROOM ACTIVATION OF PRIMARY CORONARY INTERVENTION (PCI) FOR.
Bed Management Meeting More Than Just Measurement : Outcomes
An Immediate Nursing Feedback Program for Primary PCI for ST-segment Elevation Myocardial Infarction Karen Mckenny RN, Theresa Fortner RN, Cheryl McNeil.
Roles and Responsibilities
Quality Improvement in the Emergency Department Creating the culture so it’s second nature Jonathan A. Edlow, MD Associate Professor of Medicine Harvard.
Reduction of Contaminated Blood Cultures
Stroke Alert at Lutheran General Hospital, Park Ridge, IL
CARDIAC ALERT: A Change in Process
Very Rapid Treatment of STEMI: Utilizing Pre-Hospital ECGs to Bypass the Emergency Department Kenneth W. Baran, MD Medical Director for United Hospital’s.
Impact of Process Flow Tool on Wait Times from Emergency Department to ICU. Presenter: Pratik Doshi, MD Assistant Professor, Director of Emergency Critical.
Masoudi FA et al J Am Coll Cardiol (Published online 27 November 2008) CVN Weekly Interventional Update December 8, 2008 Jeffrey J. Popma and Christopher.
BUILDING CAPACITY FOR UNIVERSAL PREVENTION THROUGH STATE-NONPROFIT-UNIVERSITY- SCHOOL SYSTEM PARTNERSHIPS Philip J. Leaf, Ph.D. Johns Hopkins University.
Team Membership Stephanie Detterline, MD Mary E. Altier, MSN, RN Clinical Departments: Emergency Medical Services, General Medicine, Cardiac Services Hospital.
Sickle Cell Pain Management in the Emergency Department B. Probst, MD; J. Williams, RN; D. Speed, RN, MSN; M. Cichon, DO; C. Jackson, MD; M. Pearlman,
CRUSADE: A National Quality Improvement Initiative CRUSADE: A National Quality Improvement Initiative Can Rapid Risk Stratification of Unstable Angina.
Transitioning from Children’s to Adult Hospital Inpatient Settings Sarah Ahrens, MD Ryan Coller, MD, MPH Jody Belling, RN, MS.
A COMPREHENSIVE APPROACH TO DELIRIUM ELLEN BARRINGTON, MSN, RN, BC.
OPERATING ROOM DASHBOARD Virginia Chard, RN, BSN, CNOR
Organizing for Change Tool Mary Ellen Bucco, MBA Jill Howard, MS Kathie Orlay, BS.
Regional Showcase West Tennessee. Speakers: John Baker M.D./Emily Garner RN Presentation: Regional Showcase – West Tennessee Presenter Disclosure Information.
Door to Balloon Times: How we got to where we are Brittany Cunningham, RN, MSN VHVI Quality Consultant July 27 th, 2011.
CLABSI Supplemental Call Series Best Practices: How Successful Units Engaged Their Senior Executive Leaders October 18, 2011 Presenters: Jonathan Kling,
Improving Pain Management An Introduction to Continuous Quality Improvement Gwendolen Buhr, MD May 30, 2003.
Redesigning Care in the Paediatric Emergency Department CYWHS, SA Presented by Ms Heather Gray Chief Executive : CYWHS 25 th November 2005.
Standardization of Oxygen Monitoring and Suctioning for Inpatient Care of Bronchiolitis in an Academically-Affiliated Community Setting Grant Mussman,
“The Doctor said another 5 minutes and I would have been dead” A regional approach to saving heart muscle Vanessa Thornton Clinical Head Emergency Care.
© Joint Commission Resources Module 4 Re-Engineering Patient Discharge: The Hospital Launch! Faculty from Joint Commission Resources Deborah M. Nadzam,
Cleveland Clinic Science Internship Program How Fast Are We? Throughput Times for Admissions from the Emergency Department Brian Hom; Deborah Porter RN,
What are we trying to do?. Acute Phase Driver Diagram.
National AMI Information Call February 5, 2008 Patient Safety Initiative.
Nicole Sutherlin Brianna Mays Eliza Guthorn John McDonough.
Improving Processes in the Sleep Lab Division of Pulmonary and Critical Care Medicine Department of Neurology Clinical Neurodiagnostic Laboratory Center.
General Medicine Improving Quality Care Presenter: Jane Lees Health Service: Auckland District Health Board Innovation Poster Session HRT1215 – Innovation.
Confidential. This presentation is provided for the recipient only and cannot be reproduced or shared without Tennova Healthcare, Inc.’s express consent.
The Health Roundtable Saving heart muscle by reducing delays to getting patients to the overnight regional catheter lab Presenter: Debby Hailstone Middlemore.
Reduction of Nosocomial Pressure Ulcers on 5 NEW Rehabilitation Unit S ave O ur S kin Confidential: Quality Improvement Material.
Implementing Process Redesign Strategies for Improving Hospital Care Shinyi Wu, PhD Assistant Professor, Epstein Department of Industrial and Systems Engineering.
Correct Site, Correct Patient, Correct Procedure Verification Documentation Audit Team Membership Paula Hindle, Vice-President Chief Nurse Executive Peggy.
Summary of Action Period 1 TN Patient Safety Collaborative: Reducing Physical Restraints Learning Session 2 April 7, 8 & 9 th, 2009.
A Close look at the MMC DKA Protocol “Clinician driven performance improvement”
Summary of Action Period 2 TN Patient Safety Collaborative: Reducing Physical Restraints Learning Session 3 October 6, 7 & 8 th, 2009.
Canadian AMI Virtual Learning Collaborative Information Call May
Acute Myocardial Infarction Committee Membership : K. McLean, MD, M. Jarotkiewicz MBA, Administrative Director Cardiovascular Service Line, Mary Morrow,
Timmins and District Hospital Critical Care Unit Delirium Collaborative November 2012.
Overview of the Winnipeg CODE STEMI Project Implemented May 2008 Dr.J.Tam MD, FRCP(C), FACC Section Chief Cardiology WRHA and University of Manitoba Lillian.
Kelowna General Hospital
Clinical Learning Environment Review GMEC January 8, 2013
MHA Immersion Pilot Project Sepsis
Prof Kim Myeong Kon / R1 Park Ji Yoon
MHA Immersion Pilot Project - Sepsis
The Association between Prehospital Time Intervals and ST-Elevation Myocardial Infarction System Performance.
Optimizing Emergency Department Utilization
Introducing ASPR’s Coalition Surge Tool
Getting Started with Your Malnutrition Quality Improvement Project
Facilitated By: Mark Merlin, DO, EMT-P, FACEP
Presentation transcript:

AMI Door to Balloon Time

Overview Primary entry for ST-Segment Elevation Myocardial Infarction (STEMI) patients is through our emergency room. Improvement focus was in ED with collaboration with Cathertization Laboratory Services and Rapid Assessment Team personnel. Facility is a tertiary-care 672 bed county teaching hospital Over 108,000 annual ED visits, over 400 a day, projected to reach almost 200,000 for Changes needed to improve patient care and meet organizational defined quality measure performance standards. Alignment with organizational goals to produce leading patient outcomes through our patients obtaining the right care, in the right setting, by the right providers at the right time.

The Team CS&E Participants Team Lead: Ellen O’Connell, MD Assistant Professor, Emergency Services Robert Madris, RN, MSN, AMI Core Measure Analyst Project Manager: Margie Roche, MS Performance Improvement Project Manager Facilitator: Peter Hoffman, SVP & Chief Quality Officer Rusty Genzel, RN CCRN Emergency Department Service Manager Physician Champion: Ellen O’Connell, MD Assistant Professor, Emergency Services Tayo Addo, MD Assistant Professor, Internal Medicine Cardiology, Cardiac Catheterization Service Executive Sponsors: Bradley Simmons, SVP Surgical Services Josh Floren, SVP Medicine Services Jana Seale, RN III, Cardiac Catheterization Service Maury Belino, RN, PM Staff Nurse, Emergency Department Landon Sweeny, RN, AM Staff Nurse, Emergency Department

What We Are Trying to Accomplish? AIM STATEMENT Timely identification of STEMI and opening of blocked coronary arteries (Door to Balloon) improves patient outcomes. Quality measure guidelines define effective door to balloon time as less than 90 minutes from arrival at hospital until the balloon is up. Historically, from October 2008 through December 2009, an average of 54% STEMI patients achieved a door to balloon time of less than 90 minutes. The goal of this project is to achieve door to balloon time of less than 90 minutes in over 95% of patients with STEMI.

How Will We Know That a Change is an Improvement? Type of MeasuresTarget for Measures Door to Balloon Time ≤ 90 minutes for ≥ 95% of STEMI Patients Door to EKG Time ≤ 10 minutes Arrival to ED Departure Time ≤ 30 minutes Arrival to Balloon Up ≤ 90 minutes How will you Measure? All measurements will be collected through use of existing systems in ED, Cath Lab, and Cardiology (i.e., EPIC, Cardiology Systems, MUSE). Reported Core Measure data will also be used.

Baseline Data

Baseline Process Analysis Tools Plan ActivityWhoWhen Team Charter Developed – Board DirectedDr. Hoffman3/28/2010 Describe Current Process Process Flow Chart Team4/2010 Measure & Analyze Data Core Measure Knowledge Survey Core Measure Quarterly Data Chart Reviews Team5/2010 Ongoing Identify Improvement Opportunities Brainstorming Survey Results – Open Ended Analysis Chart Review Team4/2010 – 6/2010 Identify Root Causes of Problem Specific Root Cause Not Identifiable Several Small Areas of Possibility Team 4/2010 – 6/2010 Generate & Choose Solutions Process Flow Chart – Future State Critical Path Exercise Brainstorming & Consensus Team6/2010 – 7/2010

Baseline Process Analysis Tools

Selected Decision Making Tools 10 Chart Review Trending Information for Outliers

Selected Decision Making Tools 11

Selected Decision Making Tools

Team Focus DO Plan included 3-key areas: Earlier identification and treatment of STEMI patients Faster movement of patient from ED to Cath Lab Education of Staff on performance measures and changes

Implementing Change Earlier Identification of STEMI Nurse driven Walk Back Chest Pain Order Set – Triage Lead Revised ED Chest Pain directive procedure Faster movement from ED to Cath Lab Standardized Patient Prep Order Set After Hours RAT nurse straight to Cath Lab Cath Lab Notification of Patient Arrival Time »Arrival time added to Cath Lab activation page »Arrival time to be placed on colored arm band Clock Synchronization »Synchronize ED, Cath Lab and EKG machines to all be on EPIC (EMR) time Physician Education of STEMI Identification Review EKGs of Cath Lab Activation cases with ED Physicians Survey personnel involved in STEMI Case next business day Monthly case review – cross-functional team

Future State Process

Results/Impact Check ActivityDate Data Collection (Preliminary Data) August 16 – September 17, 2010 Data AnalysisSeptember 18 – September 24, rd QTR Data (Preliminary) October 30, 2010

Results/Impact Interventions in ED triage and Cath Lab activation processes have: Decreased overall mean time from minutes to 56.1 minutes. Increased overall performance from 57% to 90% of cases having door to balloon time of less than 90 minutes.

Interventions April 1, August 31, 2010

Interventions: Overall Performance

Expansion of Our Implementation Act ActivityDate HandoffOctober 2010 (TBD) Maintain Gain Follow Up Surveys Case Reviews CM Reports Ongoing Monthly Sessions Quarterly Monitoring Cases Physician Quality Conference Monthly

Lessons Learned There was not one single root cause for prolonged door to balloon time. Multiple factors such as atypical presentation, awareness of core measures by staff, delay in EKGs and other contributed to performance less than target. Importance of having representation from all disciplines was crucial to implementing changes. Physician understanding of reporting requirements for core measures and how important documentation is for reporting was crucial to change. Do not have meetings on Monday’s – multiple holidays caused some missed meeting days. At time of team start up identify alternate days for holidays.

Conclusions Current results are preliminary and data will not be finalized until December However, early results indicate that initial interventions have had a positive effect on door to balloon time. Short Term Steps: Refinement of Interventions Development of ongoing education for nurses and physicians Improving communication between ED physicians and Cath Lab physicians Updating Equipment (i.e., EKG machines and Fax/Scanners) Long Term Steps: Analysis of return on investment related to decreased length of stay and decreased morbidity in patients experiencing door to balloon time of <90 minutes. Research and possible use of field activation of Cath Lab by paramedics and EMS personnel Feasibility study of 24/7 Cath Lab Staffing

Acknowledgments Thank you for the guidance and information sharing throughout the process of our program. –Peter Hoffman, MD Senior Vice-President and Chief Quality Officer –Marisa Valdes, RN Interim Director of Performance Improvement

Thank you!