Construction Standards - Division 1 Subcommittee Tina Nelson, P.E., Committee Chair CRAB Design Conference, October 7, 2009 WSDOT/APWA Specifications When.

Slides:



Advertisements
Similar presentations
First of all – lets look at the windows you are going to use. At the top you have a toolbar, with all your various tools you can use when customising your.
Advertisements

People are our greatest assets Hiring and Recruiting We are in the PEOPLE business.
Habits of the mind.
CVs & Telephone Skills Top Tips to remember …
Basic Time Management Principles
HOW TO WRITE INSTRUCTIONS! Have you ever been to IKEA? Do they sell anything you dont have to assemble yourself? Do you know how to upload a picture.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
Phases of Plan Development – Leading to High Quality Plans ACEC/ODOT Conference April 15, 2008 Steve Cooley, PE, PLS ODOT Region 2 Technical Center Manager.
IEP Amendment Podcast Script Shirley Young, Consultant, OSE-EIS January 13,
“What do you want me to do now?”
US Army Corps of Engineers Philadelphia District Proposal Writing Tips Presented by Cheryl W. Chandler March 6, 2013.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Send Off and the Judiciary A referees Guide. Preparation  We all ensure that we are properly prepared for the game. We have our referees uniform, boots,
Partnership for Environmental Education and Rural Health
On-Line Database Placement Application Tutorial. How to Change Your Information On York’s System.
Publishing 101 The Basics on Getting Your Scholarly Book Published By Brian Halley Boston-based Acquisitions Editor for the University of Massachusetts.
Accounting Chapter 4 Unit 7 Notes Posting to the Ledger
 maWebCenters Weekly Webinars 18: Leveraging Sales Tools.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Working with SharePoint Document Libraries. What are document libraries? Document libraries are collections of files that you can share with team members.
Life to Eagle A Roadmap Prepared for Scouts in the Meridian District of Mount Diablo Silverado Council
Why Worry – Just Write PUTTING THE HOUSE IN ORDER.
An Introduction to Content Management. By the end of the session you will be able to... Explain what a content management system is Apply the principles.
Project Management. Managing Capital Projects  What is a Project?  Something that: has a beginning and an end, and is carried out to meet established.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
ADOPTING OPEN SOURCE INTEGRATED LIBRARY SYSTEMS Best Practices Presented by Vandana Singh, PhD Assistant Professor, School of Information Sciences University.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
TECHNICAL WRITING October 31 st, With a partner Write simple “step-by-step” instructions for sending a Kakao Talk message with a phone.
Broadcasting News Trivia "LESSON PLANS." BBC News. BBC, 30 Jan Web. 19 Nov
©2014 The McGraw-Hill Companies, Inc. All rights reserved Planning, Writing, and Revising Module Four Copyright © 2014 by The McGraw-Hill Companies, Inc.
Elkhorn Construction Inc..  A BJSA is a tool in which we plan our work, identify hazards, mitigate the hazards, and assign the responsible people. 
How to Select and Pre-screen a Home Improvement Contractor.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Performance and Practice Techniques and Tips. What is practice?  Practice is not mindless repetition, even though repetition is involved. Practice is.
GOLD UNIT 4 - IT SECURITY FOR USERS (2 CREDITS) Demi Leigh.
Author Instructions How to upload Abstracts and Sessions to the Paper Management System.
How to start Milestone 1 CSSE 371 Project Info There are only 8 easy steps…
Intermediate 2 Software Development Process. Software You should already know that any computer system is made up of hardware and software. The term hardware.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
VOLUNTEERS ALL YEAR Don’t Cry, It’s Not So Bad. VOLUNTEERS ALL YEAR Much better.
The College Essay Fall Seal the Deal While one essay doesn’t guarantee you college admission, a good one “helps” and a bad one will “tank” your.
Relations And Functions. A relation is a set of ordered pairs {(2,3), (-1,5), (4,-2), (9,9), (0,-6)} This is a relation The domain is the set of all x.
Curriculum Vitae, or Resume, writing
2010 Construction Contract Standards Training Part 2 Prototype October 2011.
Author Instructions How to upload Abstracts and Sessions to the Paper Management System.
Fall 2001(c)opyright Brent M. Dingle 2001 Simple Sorting Brent M. Dingle Texas A&M University Chapter 10 – Section 1 (and some from Mastering Turbo Pascal.
Learning to Learn The fine art of doing it your way.
Instructions What are they?. Lets see how well you can follow instructions! We are going to play a game of Simon Says. Can you follow all the instructions.
Section 3 Opportunities Applicant Registration Instructions.
Becca Nelson Final Project for TechMission Corps 7/12/2010.
Test Taking Skills Make sure you prove what you know!
 This is nothing new and it is not your first year in school we are just continuing on from where you left off in elementary school. Basic Rules For Mr.
Creating An Effective Resume. What is a Resume? A one page summary of your skills, education, and experience. A resume acts much like an advertisement.
Construction Specifications 101 Scott Trammell Construction Specifications Engineer March 10, 2015.
ALDOT Specifications Update
Section title This presentation is designed to help you talk to young people about Drive. The notes included aren’t intended to be read out, they are for.
Chapter 8 Specifications & Special Provisions
Job Evaluation: Process & Pitfalls
Construction Oversight
Chapter 8 Specifications & Special Provisions
State Aid Construction
Completing the State Aid Payment Request
Complaint letter Feedback
Caltrans 2010 standard specifications
YOUR FUTURE AND INFORMATION TECHNOLOGY
Software Development Life Cycle (SDLC)
State Aid Construction
Project Manager / Utility Liaison
Presentation transcript:

Construction Standards - Division 1 Subcommittee Tina Nelson, P.E., Committee Chair CRAB Design Conference, October 7, 2009 WSDOT/APWA Specifications When do you need a Special Provision?

WSDOT/APWA Specifications Special Provisions  Who?  What?  Where?  When?

WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal Construction  1957  1988  1991  2006

 1963 – APWA Std Specs 1 st Ed  1988 – Separate APWA 1-99 Book  1991 – Supplement Included  1997 – H&LP Letter  1997 – Div 1 Committee reactivated WSDOT/Admin Team  1998 – Updated 1-99 Published  2005 – APWA GSPs  2006 – 1-99 is out of the Book APWA on WSDOT website  2008 – APWA GSPs can be downloaded like WSDOT GSPs APWA WA CHAPTER 1-99 Supplement - Div 1 - History

Contacts

APWA GSPs

Change Log Download directions

Plans or Specials ….. which one comes first?

.. recent GSP in response to new RCW..

GSP with fill-ins..

Standard Specifications/Special Provisions  Div 1 – Contractual section  Div 2 through 8 - Describes the final product what needs to be done how we are checking to make sure we get there how we are compensating for the work  Div 9 – Material details

Or …  Division 1 Bunch of legalistic gobbledygook……..Who cares………  Division 2 Is there stupid trees and stuff on the site that you don’t want? Get rid of ‘em, for Pete’s sake! Want a hole? Dig a hole! Digging out part of a hill? Just make sure it doesn’t fall down on top of you. What do you need, a map?  Division 3 Need dirt and rocks for your job? Go dig ‘em up someplace else, and don’t let them dribble from the truck on the way to the site. Unless it’s dark.  Division 4 Spread out the rocks smooth, just like you would in your driveway. No big wup. If you don’t want dust flying up when people drive by, mix the rocks with goop first.  Division 5 More of the above. If you want a fancy schmancy road, mix up concrete, just like you would in your wheelbarrow for a post hole, but more. Lay everything down nice and tidy, with even edges, and clean up any mess. Just watch your wife frost a cake. No dif. OK, ‘spouse’.  Division 6 Want to cross a river? Just lay down something that reaches from bank to bank, and won’t break with the weight you’re putting on it. Allow for after Thanksgiving weight, even though it only happens once a year.  Division 7 Want water, rain, and disgusting stuff to go where you want it? Pour it through a [big] straw. Use a funnel at the top end. Don’t let it go where it shouldn’t. Unless it’s dark.  Division 8 A bunch of this ‘n’ that, just to guide people to go where they should know how to go in the first place. Watch out for other cars, and don’t run into ‘em. Just use your imagination.  Division 9 A bunch of recipes. What are we, pansy-assed chefs? If the bolt won’t fit in the hole, it’s the wrong one, stupid. If it breaks off under the load, it’s the wrong one, stupid.

WHO ????

WHEN ???? 30% ? 50% ? 60% ? 90% ? 98% ?

HOW ???? Elements of the Special Provision  Description of Work  Materials  Construction Requirements  Measurement  Payment

HOW ???? Incidental to … Included with … “As directed by the Engineer …” “To the satisfaction of the Engineer …” Contractor shall … Agency will …

WHAT ???? Clear Concise Complete Consistent Complete ConsistentSupplementReviseMeasurePay

Special Provisions  Don’t reinvent the wheel  Start early – keep a “Special” Log  Use the Engineer’s Estimate, build on bid items  Read Standard Specifications for each item—are they covered adequately? If yes– then stop If yes– then stop No? Then look for already written and tested Special Provisions No? Then look for already written and tested Special Provisions

 Written and tested Special Provisions: WSDOT GSPs WSDOT GSPs Standard – fill-insStandard – fill-ins Specialty– from Bridge Division, from NW RegionSpecialty– from Bridge Division, from NW Region APWA GSPs APWA GSPs Div 5 & 9, easier HMA specDiv 5 & 9, easier HMA spec If you still can’t find what you need: If you still can’t find what you need: Copy specific SP from a successful project Copy specific SP from a successful project Write your own Write your own  What goes in Plans vs. Specs Special Provisions Con’t.

Pitfalls …  Non-management of boilerplate: allowing all staff to “play” with it allowing all staff to “play” with it no regular program of review & update no regular program of review & update  ‘Div. 0’ / Div. 1 / Technical Provisions written by different people for one Project  Copying whole spec from your last job May not be applicable May not be applicable Skimming, not editing carefully Skimming, not editing carefully Out of date references Out of date references

Pitfalls – Div. 0 & 1  Contradictions / confusion between your Agency & funding Agency  Using a mish-mash of forms and General Conditions from different sources  Thinking one-sided, trying to remove all risk from Agency

Pitfalls - Special Provisions  Specs written/compiled by the wrong person: Whoever is not busy Whoever is not busy Someone other than the Project’s Designer or Project Manager Someone other than the Project’s Designer or Project Manager  Not carefully reading the Standard Specs & Div. 1 first

Pitfalls – Special Provisions, cont.  Copying wholesale from previous project  Not checking referenced specs and test methods  Temptation to “improve” existing language (results in confusion, repetition, contradiction) (results in confusion, repetition, contradiction)  Careless terminology ‘Specifications’, Contract Provisions vs. Contract Documents‘Specifications’, Contract Provisions vs. Contract Documents “Federal” Funding“Federal” Funding Engineer vs. Owner’s Consultant, etc.Engineer vs. Owner’s Consultant, etc. your Contractor vs. other contractorsyour Contractor vs. other contractors

More Special Provisions Tips  Think from the contractor’s point of view  Lingo – use precise, defined terms For the players involved For the players involved Cross-reference to standards Cross-reference to standards  Say it once Within ALL Bid Documents – plans, Std Specs, Special Provisions Within ALL Bid Documents – plans, Std Specs, Special Provisions Just cross-reference where helpful Just cross-reference where helpful If using WSDOT Standard Specs as your base, do not repeat phrases like, “include all materials, tools, equipment”…If using WSDOT Standard Specs as your base, do not repeat phrases like, “include all materials, tools, equipment”…

Equitable Allocation of Risk  Don’t go overboard – be fair and realistic  ‘Talking strong’ is OK, if FairFair BiddableBiddable EnforceableEnforceable  Don’t try to protect yourself from everything that could ever happen

Checking and QC  One wrong word, one wrong dimension, could cost you thou$ands!  Pretend you’re a Contractor -- think: Can I bid it? Can I bid it? Can I build it? Can I build it?  Have the Construction Manager review for biddability, constructability, materials  Ask a Contractor to review?

Questions? Remember – “Specials” come before the Plans