RESOURCES Roger D. H. Warburton © Kanabar / Warburton, 2009 1.

Slides:



Advertisements
Similar presentations
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

MGMT 483 – Week 11.  The issues involved in developing a project plan and schedule in the face of constrained resources (people or facilities)  Critical.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8: Scheduling Resources and Costs
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Scheduling Resources and Costs Chapter 8.
Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.
Developing a Project Plan
Advanced Project Management - CPH
Project Management 6e..
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Importance of Project Schedules
Project Management Cost and Resources
Project Time Management
Software project management (intro) Resource allocation.
OPSM 639, C. Akkan Resource Planning Resources affect the schedule, cost and performance of a project. Resources are –Individual people, departments/teams,
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8.
7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management.
MANAGING PROJECT RESOURCES
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
P ROJECT M ANAGEMENT, PMI A PPROACH (PMP) P ROJECT T IME AND S CHEDULE M ANAGEMENT Sayed Ahmed BSc. Eng. in CSc. & Eng. (BUET, Bangladesh) MSc. in CSc.
Software Project Management Task Estimating and Scheduling
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
MANAGING PROJECT RESOURCES
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
1 ISE Ch. 8 pt. 2 Resource-constrained scheduling: Computer demonstration EMR Project  The development of a handheld electronic medical reference.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The Resource Problem Resources and Priorities
Scheduling Resources and Cost
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
Scheduling Resources and Costs
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Scheduling Resources and Costs
Project Management -- Scheduling Resources and Costs
Scheduling Resources and Costs
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Chapter 8 Scheduling Resources.
ENGINEERING MANAGEMENT (GE 404)
Project Time Management
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Project Time Management
Manajemen Industri Teknologi informasi
Scheduling Resources and Costs
Project Time Management
Project Time Management
Project Time Management
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Scheduling Resources and Costs
Presentation transcript:

RESOURCES Roger D. H. Warburton © Kanabar / Warburton,

Objectives 2  Understand Constraints  Resource Constraints  Leveling

S CHEDULES & C OST E STIMATES Project network times are not a schedule until resources have been assigned Cost Estimates are not a budget until they have been time phased 3

R ESOURCES AND P RIORITIES The Project network is not a schedule until resources are assigned Assumption: Resources will be available in the required amounts when needed Assigning resources requires making realistic judgments of availability and project durations 4

R ESOURCE C ONSTRAINT E XAMPLE Plan Play Hire Actors Select Theater Hire Musicians Plan Play Hire Actors Select Theater Hire Musicians Rehearse Re- hearse 5

T YPES OF P ROJECT C ONSTRAINTS Technical (Logical) Constraints Constraints related to the network sequence in which project activities must occur Network Diagram Physical Constraints Activities that cannot occur in parallel or are affected by contractual or environmental conditions Resource Constraints The absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities. 6

C ONSTRAINT E XAMPLE Resource Dependency takes precedence over the technological dependency Does not violate the technical dependency Plan Play Hire Actors Select Theater Hire Musicians Re- hearse 7

R ESOURCE Q UESTIONS Will assigned labor be adequate? Will assigned equipment be adequate? Will outside contractors be needed? Do unforeseen dependencies exist? Is there flexibility in using resources? Is the deadline still realistic? 8

T YPES OF R ESOURCE C ONSTRAINTS People designer, engineer, welder, painter Materials concrete, survey data, deliveries in winter night road work Equipment Earth moving equipment, copiers Working Capital 9

C LASSIFICATION OF S CHEDULING P ROBLEMS Time Constrained A project that must be completed by an imposed date Resource Constrained A project in which the level of resources available cannot be exceeded 10

R ESOURCE P ROBLEMS Are very complex even for small networks 11

H ELP ON S CHEDULING P ROBLEMS The priority matrix helps determine if the project is time or resource constrained. TimePerformanceCost Constrain O Enhance O Accept O 12

C RITICAL R ESOURCE Q UESTION If the CP is delayed, will resources be added to get the project back on schedule? “Yes”Time Constrained “No”Resource Constrained TimePerformanceCost Constrain O Enhance O Accept O 13

T IME C ONSTRAINED P ROJECT A project that must be completed by an imposed date. Project Duration is fixed Resources are flexible Resources can be added to ensure schedule is met 14

R ESOURCE C ONSTRAINED P ROJECT A project in which the level of resources available cannot be exceeded Resources are fixed Time is flexible If the resources are inadequate, it is acceptable to delay the project 15

C ONSTRAINED P ROJECTS All projects are constrained Something will have to give What are the priorities? Negotiation is key 16

L IMITING A SSUMPTIONS Splitting activities is not allowed Once an activity is started, it is carried to completion Activities may not be started and stopped Resources on an activity cannot be changed Activities with the most slack pose the least risk Reduction of flexibility does not increase risk The nature of an activity (easy, complex) doesn’t increase risk 17

E XAMPLE OF T IME C ONSTRAINED B OTANICAL G ARDEN FIGURE 8.2 One resource: backhoes Interchangeable Slack 18

B OTANICAL G ARDEN ( CONT ’ D ) FIGURE 8.2 (cont’d) 19

T IME C ONSTRAINED P ROJECT A project that must be completed by an imposed date. Project Duration is fixed Resources are flexible Resources can be added to ensure schedule is met Smooth the Resources Focus on Resource Utilization Erratic resources are difficult to manage Level the resources Delay non-criticals Use positive slack to reduce peak demand 20

B OTANICAL G ARDEN ( CONT ’ D ) FIGURE 8.2 (cont’d) 21

B OTANICAL P ROJECT Activities with slack: Irrigation, Fence & Walls Delay Fence & Walls – Smoother Peak demand reduced Resources reduced from 4 to 3 Smoother profile, easier to manage Cost to move (people or machines) Loss of flexibility Reduced slack, critical activities Most slack = least risk 22

E XAMPLE OF T IME C ONSTRAINED B OTANICAL G ARDEN FIGURE 8.2 One resource: backhoes Interchangeable Slack 23

R ESOURCE -C ONSTRAINED P ROJECTS Projects that involve resources that are limited in quantity or by their availability. Scheduling of activities requires the use of heuristics (rules-of-thumb) A modest network with a few resources has thousands of feasible solutions 24

R ESOURCE A LLOCATION M ETHODS FOR R ESOURCE -C ONSTRAINED P ROJECTS Scheduling of activities requires the use of heuristics (rules-of-thumb) that focus on: 1. Minimum slack 2. Smallest (least) duration 3. Lowest activity identification number The parallel method is the most widely used heuristic An iterative process that starts at the first time period of the project and schedules period-by-period any activities scheduled to start using the three priority rules. 25

S PLITTING /M ULTITASKING Scheduling technique used to get a better schedule and/or increase resource utilization Interrupting work on an activity to employ the resource on another activity, then returning the resource to finish the interrupted work. Feasible when startup and shutdown costs are low. Considered a major reason why projects fail to meet schedule. 26

T HE I MPACTS OF R ESOURCE -C ONSTRAINED S CHEDULING Reduces delay but reduces flexibility. Increases criticality of events Increases scheduling complexity May make traditional critical path no longer meaningful Can break sequence of events May cause parallel activities to become sequential and critical activities with slack to become noncritical 27

C OMPUTER D EMONSTRATION OF R ESOURCE -C ONSTRAINED S CHEDULING 28

L EVELING Within Slack Outside Slack Complicated – no simple solution Destroys the network! Now what? 29

S UMMARY : L EVELING How do we Level? After you gather your resource requirements: Identify resource peaks Delay non-critical tasks with float Extend schedule if needed 30 In conclusion: Resource requirements and availability impact your schedule. You must leverage your skills and tools.

W ORKSHOP Work on the Resource Requirements Associated with the Case Study 31

S CHEDULE C OMPRESSION 32

O BJECTIVE Understand schedule compression techniques Understand fast tracking and crashing concepts within this context. 33

W HAT IS D URATION C OMPRESSION Duration compression is a special case of mathematical analysis that looks for ways to shorten the project schedule without changing the project scope. PMBOK® Guide 4 th Edition 34

W HY C OMPRESSION ? Schedule does not meet planned milestone dates. Schedule estimate is longer than what the sponsor desires. Applying resource loading and leveling impacts schedule. Schedule slip occurs during project execution due to things like scope creep or other circumstances. Renegotiated project completion date 35

H OW ? Utilize resources, duration, scope and additional assets. Use techniques such as fast tracking and crashing. 36

F AST T RACKING Overlap activities. 37 A B – 3d What are the Risks?

C RASHING Apply additional resources to critical path Often results in greater project costs Look for least expensive reduction in time 38

D ISCUSSION From your experience what additional skills and assets are available for schedule compression? 39

R EFERENCES Kanabar & Warburton: MBA Fundamentals, Kaplan Publishing, 2008 Gray & Larson: Project Management – The Managerial Process, McGraw-Hill, PMBOK: Project Management Institute,