Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,

Slides:



Advertisements
Similar presentations
Lecture Network Analysis
Advertisements

WBS: Lowest level OBS: Lowest level
Chapter 7 Project Management
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Work Breakdown Structures
Project Management Information Systems and Management.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
MGMT 483 Week 8 Scheduling.
Project Management: A Managerial Approach
Project Management A Managerial Approach
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Roberta Russell & Bernard W. Taylor, III
Prepared by: Michael Palazzo
Workshop-3 Gantt and Pert Chart.
Chapter 6 Introduction to Microsoft Project
HIT241 - TIME MANAGEMENT Introduction
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Scheduling: PERT/CPM
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
ENGM91 ACTIVITY PLANNING Unit 2
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
© Pearson Education Limited 2004 OHT 8.1 Cadle and Yeates: Project Management for Information Systems, 4th edition Critical Path Method(CPM)
Network Analysis Terminology
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
1 Selected Topics on Project Management The Critical Path Dr Marc Conrad 1Marc Conrad.
Business Department Session 6 Exam Question –Draw Network diagram –Identify Critical path –Sketch Gantt Chart –‘Crash’ the project Reduce the project completion.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Project Management in Practice
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
MEM 612 Project Management Chapter 5 Scheduling the Project.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Critical Path Method(CPM)
Project Scheduling
deterministic Fixed and known in advance, representing a
CHAPTER 6 PROJECT TIME MANAGEMENT
Analysing the AoA network
PERT - The Program Evaluation and Review Technique
Project Planning By Phaik San Liew.
AOA A style of project network diagram in which arrows
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it, and scheduling all the of the many tasks involved are not easily separable Budget must include both the amounts and timing of the resources received or expanded One cannot prepare a budget without knowing the specifics of each task and the time periods during which the task must be undertaken. Similarly, a project action implies a schedule just as a schedule implies a plan. PERT (Program Evaluation and Review Technique) and Critical path Method (CPM) and Gantt Chart

Project Scheduling  Project Schedule Activities Resources especially people The project schedule answers two basic planning questions  What and when  But not How

Scheduling  What Activities and Milestones List of activities and their expected time of implementation  Diagrams (e.g. PERT network diagrams)  Table  Charts (e.g. Gantt charts)  Graphs All this present two important information  Activities  Time of implementation

Scheduling  The Activity List This is often developed with the work breakdown structure (WBS) table The WBS breaks down all project activities to a much lower level, called work tasks. A schedule list of activities contains the following information:  Activity ID, Activity name, Description, start date, completion date, dependency, and responsibility.

The Language of Scheduling  Activity task or set of tasks use resources  Event state resulting from completion of one or more activities consume no resources or time predecessor activities must be completed  Network diagram of nodes and arcs used to illustrate technological relationships  Path series of connected activities between two events  Critical Path set of activities on a path that if delayed will delay completion of project

The Language of Scheduling continued  Milestone and Baselines Milestone are used as points of payment, measurement of progress on the project and for determining baselines. IEEE definition of baseline includes “a formally agreed specification that then serves as the basis for further development”  Functional baseline: This document is the basis for all design and implementation, and in particularly it is the basis for system testing and acceptance.

Building the Network  Building the Network Activity-on-Arrow (AOA) Network  Usually associated with PERT Activity-on-Node (AON) Network  Usually associated with CPM Example

Building the Network: AON Task Predecessor a- b - ca db eb fc,d ge

Building the Network: AOA Task Predecessor a- b - ca db eb fc,d ge Dummy Activity

Scheduling  Critical Part and Critical Time Critical Path  set of activities on a path that if delayed will delay completion of project Critical Time  time required to complete all activities on the critical path Example  Table 5-2 A Sample Problem for Finding the Critical Path and Critical Time

Critical Part and Time The Critical Path and Time for Sample Project

Scheduling  Critical Part, Time and Slack All activities, and thus all paths, must be completed to finish the project. The shortest time for completion of the network is equal to the longest path through the network. Can activities not on the critical part be delayed without delaying the the project?  Slack or Float LST - EST = LFT - EFT = Slack Project slack (activities on the critical part)

A Modified Version of MSP Network Critical Part and Time

Gantt Charts  Do Enable important schedule information to be grasped quickly It is easy to read They are not adequate replacement for networks diagrams but they are complementary scheduling and control devices It is the most popular way of exhibiting sets of related activities in the form of schedules

A Gantt Chart of a Sample Project Gantt Charts

A Gantt Chart of Sample Project Showing Critical Path, Path Connections, Slack, EST, LST, EFT, and LFT

Gantt Charts A Progress Report on a Day Care Project Showing Actual Progress Versus Baseline

Gantt Charts A Gantt Chart of a Day Care Project Showing Expected Durations, Critical Path, Milestone, and Resource Requirements

Scheduling HR  The most important and most valuable project resource is the development team (people)  The team size The development team size is influenced by  # of activities  Intensity or complexity of the activities

Development team size

Scheduling Resources  Resources Work place Equipments Vendors and subcontractors

Scheduling  Monitoring and updating the schedule It is not a static document Period report