Project Management Chapter 14. Introduction to Project Management Projects can be simple (planning a company picnic) or complex (planning a space shuttle.
Advertisements

Spreadsheet Modeling & Decision Analysis
Chapter 7 Project Management
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Project Management CPM/PERT Professor Ahmadi.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 3 Project Management.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
MGMT 483 Week 8 Scheduling.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Chapter 9 Project Management.
PERT/CPM Models for Project Management
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Project Management Techniques.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
UNIT II Scheduling Procedures & Techniques FLOAT
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Scheduling Lecture # 1.
Basic Project Scheduling
Project Planning & Scheduling
Project Management for Business
Basic Project Scheduling
Decision making and Organization Management
Project Planning and Budgeting
Activity on Node Approach to CPM Scheduling
Analysing the AoA network
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Analysing the AoA network
Presentation transcript:

1 Spreadsheet Modeling & Decision Analysis: A Practical Introduction to Management Science, 3e by Cliff Ragsdale

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Project Management Chapter 14

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Introduction to Project Management u Projects can be simple (planning a company picnic) or complex (planning a space shuttle launch). u Successfully completing a project requires: –knowledge of the tasks involved –accurate estimates of time and resources required –knowledge of physical and logical relations between the various tasks u Project management techniques –Critical Path Method (CPM) –Program Evaluation and Review Technique (PERT) u Spreadsheets can be used to manage projects, but dedicated project management software is often more effective.

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning An Example: Lightner Construction u Tom Lightner is the owner of Lightner Construction, a general contracting company specializing in the construction of single-family residences and small office buildings. u Tom frequently has numerous construction projects going on at the same time and needs a formal procedure for planning, monitoring, and controlling each project. u He is aware of various project scheduling techniques but has never used them. u He wants to see how he might apply such techniques to one of the home-building projects he will be undertaking in the near future.  The following slide summarizes each of the major activities required for this project.

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Summary of Activities TimeImmediate RequiredPredecessor ActivityDescription (in days)Activity Aexcavate3-- Blay foundation4A Crough plumbing3B Dframe10B Efinish exterior8D Finstall HVAC4D Grough electric6D Hsheet rock8C, E, F, G Iinstall cabinets5H Jpaint5H Kfinal plumbing4I Lfinal electric2J Minstall flooring4K, L

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning An Activity-On-Node (AON) Network Install Cabinets A B C D E F G H I J K L M Excavate Lay Foundation Rough Plumbing Frame Finish Exterior HVAC Rough Electric Sheet Rock Paint Final Plumbing Final Electric Install Flooring

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning A Comment of Project Networks u Projects can also be depicted using Activity- On-Arc (AOA) networks. u This book uses AON networks (which the author views as superior to AOA). u Some software packages use AOA networks, so you should at least be aware that they exist.

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning An Activity-on-Arc (AOA) Network Excavate Lay Foundation Rough Plumbing Frame Finish Exterior HVAC Rough Electric Sheet Rock Paint Install Cabinets Final Plumbing Final Electric Install Flooring A B C D G F E H I J K L M

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Start and Finish Points u AON networks must have unique start and finish points. A B C D E A B C D E start finish

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning CPM: An Overview u A Forward Pass through the network determines the earliest times each activity can start and finish. u A Backward Pass through the network determines the latest times each activity can start and finish without delaying completion of the project. u The longest path through the network is the critical path.

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Information Recorded for Each Node i titi EST i EFT i LST i LFT i t i = time required to perform activity i EST i = earliest possible start time for activity i EFT i = earliest possible finish time for activity i LST i = latest possible start time for activity i LFT i = latest possible finish time for activity i

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning The Forward Pass u The earliest start time for the initial activity in a project is time zero. u The EST of an activity is equal to the latest (or maximum) early finish time of the activities directly preceding it. u The EFT of an activity is equal to its earliest start time plus the time required to perform the activity.

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Results of the Forward Pass H E J I K 42 4 L M A F G D C 7 3 B Note: EST H =MAX(EFT C,EFT E,EFT F,EFT G )=25

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning The Backward Pass u The LFT for the final activity in a project is equal to its EFT as determined by the forward pass. u The LFT for any other activity is equal to the earliest (or minimum) LST of the activities directly following (or succeeding) it. u The LST of an activity is equal to its LFT minus the time required to perform the activity.

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Results of the Backward Pass Note: LFT H =MIN(LST I,LST J )=33 LFT D =MIN(LST E,LST F,LST G )=17 LFT B =MIN(LST C,LST D )=7 H E J I K 42 4 L M A F G D C 7 3 B

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning The Critical Path Note: Slack = LST i -EST i or LFT i -EFT i H E J I K 42 4 L M A F G D C 7 3 B Slack=0 Slack=15 Slack=0 Slack=4 Slack=2 Slack=0 Slack=2 Slack=0

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Determining The Critical Path u Critical activities have zero slack and cannot be delayed without delaying the completion of the project. u The slack for non-critical activities represents the amount of time by which the start of these activities can be delayed without delaying the completion of the entire project (assuming that all predecessor activities start at their earliest start times).

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Project Management Using Spreadsheets u The early and late start and finish times for project activities can be done in a spreadsheet, but the calculations are tedious. See file Fig14-11.xls

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning A Gantt Chart for the Example Problem

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning An LP Model for Earliest Start Times MIN:T A + T B T M Subject to:T B  T A + t A T C  T B + t B T D  T B + t B T E  T D + t D T F  T D + t D T G  T D + t D T H  T C + t C T H  T E + t E T H  T F + t F T H  T G + t G T I  T H + t H T J >  T H + t H T K  T I + t I T L  T J + t J T M  T K + t k T M  T L + t L T i  0, for all i

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Implementing the Model See file Fig14-14.xls

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning An LP Model for Latest Start Times MAX:T A + T B T M Subject to:T B  T A + t A T C  T B + t B T D  T B + t B T E  T D + t D T F  T D + t D T G  T D + t D T H  T C + t C T H  T E + t E T H  T F + t F T H  T G + t G T I  T H + t H T J >  T H + t H T K  T I + t I T L  T J + t J T M  T K + t k T M  T L + t L T M  T i  0, for all i

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Implementing the Model See file Fig14-14.xls

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Project Crashing u It is often possible to complete activities more quickly than normal by applying more resources (better equipment, over time, etc). u This is referred to as “crashing” the project. u We may want to determine the optimal way of crashing a project to: –complete it more quickly than originally scheduled –keep it on schedule if critical activities were delayed

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Computing Crash Times and Costs See file Fig14-21.xls

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Determining the Earliest Crash Completion Time MIN:T M + t m - C M Subject to:T B - T A >= t A - C A T C - T B >= t B - C B T D - T B >= t B - C B T E - T D >= t D - C D T F - T D >= t D - C D T G - T D >= t D - C D T H - T C >= t C - C C T H - T E >= t E - C E T H - T F >= t F - C F T H - T G >= t G - C G T I - T H >= t H - C H T J - T H >= t H - C H T K - T I >= t I - C I T L - T J >= t J - C J T M - T K >= t K - C K T M - T L >= t K - C L C i <= allowable crash days for activity i T i, C i >= 0, for all i

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Implementing the Model See file Fig14-21.xls

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Cost/Time Trade-Off Curve $0 $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 $16,000 $18,000 $20, Completion Time (in days) Crash Cost

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning PERT: An Overview u CPM assumes all activity times are known with certainty or can be estimated accurately. u PERT accounts for uncertainty in activity times by using three time estimates: a i = duration of activity i assuming the most favorable conditions b i = duration of activity i assuming the least favorable conditions m i = estimate of the most likely duration of activity i  PERT then estimates expected duration t i and variance v i of each activity’s duration as:

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning PERT Overview Continued  The expected (or mean) time required to complete any path in the network is the sum of the expected times (the t i ) of the activities on the path.  Assuming the individual activity times in a project are independent of one another, we may also calculate the variance of the completion time for any path as the sum of the variances (the v i ) of the activities on the path. u PERT considers the path with the largest expected completion time to be the critical path. u PERT’s reasoning may be flawed...

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning PERT Example C A B D a=2 m=4 b=6 t =4 v=0.444 a=8 m=9 b=10 t =9 v=0.111 a=3 m=5 b=7 t =5 v=0.444 a=2 m=8 b=14 t =8 v=4.0 Path:Expected Time: Variance: A - B - D A - C - D = =

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Distribution of Completion Times Path Completion Time Probability Density "Critical" Path A-B-D "Non-Critical" Path A-C-D u If we want to finish within 21 days, which path is most critical?

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Simulating a Project Network u The solution to the “problem” with PERT is to use simulation. u We can model activity times easily using a triangular distribution Time Required Probability Density a m b

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Simulating The Project Network See file Fig14-32.xls

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning Microsoft Project u Dedicated project management software such as MS Project can greatly simplify the process of organizing, planning, and controlling projects. u A trial version of MS Project is included on the CD-ROM accompanying this book.

Spreadsheet Modeling and Decision Analysis, 3e, by Cliff Ragsdale. © 2001 South-Western/Thomson Learning End of Chapter 14