Smart Urban Low Voltage Network Low Carbon Network Fund Tier 1 Project UK Power Networks & TE Connectivity.

Slides:



Advertisements
Similar presentations
Installation of a Static Var Compensator on to an 11kV network
Advertisements

EDF R&D CIM for DA Status, Feedback & Challenges.
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Installation base of over 25,000 valued installations, Country wide Installation base of over 25,000 valued installations, Country wide Recognised as.
25 October 2012 Gideon Evans LV Network Monitoring Demonstrating the Possibilities.
Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Distributed Intelligence Provides Self-Healing for the Grid
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Project FALCON Sanna Atherton Jenny Woodruff Ben Godfrey.
Lineage Power - Total Efficiency TM Smart Grid A Telecom / Commercial consumer’s perspective Paul Smith – Technical Marketing Manager, Lineage Power
1 Cara Blockley Low Carbon Projects Manager Future Distribution Networks 15 October 2013.
Low Voltage Network Solutions Plenary session A – Monitoring Networks Dan Randles Quality of Supply and Technical Manager/LCNF Tier 1 Manager.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
Voltage Management of Low voltage (LV) Busbars Plenary session B – Low voltage operation Dan Randles Quality of Supply and Technical Manager/LCNF Tier.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
Applications of Wireless Sensor Networks in Smart Grid Presented by Zhongming Zheng.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Network Management on the Isles of Scilly Ben Godfrey Western Power Distribution Innovation and Low Carbon Networks Engineer /
Low-Voltage D.C. Workshop April 8, 2011
1 Innovation Responding to the needs of customers Dan Randles Network Performance & Innovation Manager 3 October 2014.
Distribution Automation Plans in AEP Texas. Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr.
1 Fault Assistance Centre David Talbot & Chris Armstrong September 2014.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Manaen Srigiri James Abhilash DEMAND RESPONSE ___________________________ OUR RESPONSE TO CRITICAL CHALLENGES.
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
1 Some Issues about Big Data in Power Grid Gary Quan.
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Endesa Colombia Our Distribution System In Front Of The Development Of Colombia.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Alistair Steele Network Connected Batteries SSEPD Energy storage projects kW Flow Battery 1 MW NaS Battery 2 MW Lithium Battery.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
INES ® – the innovative system solution for decentralised distribution grid automation Intelligent distribution grid management Torben Braje, product manager,
Automation Presentation to KIB-TEK, Northern Cyprus (19/09/2007)
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 A Case Study of Extensive Automation in London Cliff Walton & Bob Jackson.
Smart Grid Schneider Electric Javier Orellana
RT1b – EDF R&D Frankfurt (Germany), 6-9 June 2011  Smart Grids require a system approach and modularity  Smart Components will rely on nodes of integration.
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Smart Grid Big Data: Automating Analysis of Distribution Systems Steve Pascoe Manager Business Development E&O - NISC.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
PROPRIETARY INFORMATION - © 2015 WOODWARD, INC. PAGE 1 HighPROTEC-2 MRI4-2 Feeder Relay Sales presentation 2015/08/10.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
1 Watson Peat Using Intelligence to INSPIRE Future Networks 12 th May 2016.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Smart Grid Paul Bircham Commercial Strategy & Support Director.
Effects of Harmonics on Capacitors Electrical System
Network Innovation Allowance Project: South East Smart Grid
Subteam 1a Competitive Solicitations Framework Working Group Meeting
EV charging – a grid perspective
Smart Grid Projects NSTAR
PM9, PM9P and PM9C Power Meter
Presentation transcript:

Smart Urban Low Voltage Network Low Carbon Network Fund Tier 1 Project UK Power Networks & TE Connectivity

Improved safety Enhanced network modelling / planning Project Background Follow-on project after successful IFI trials. IFI project aims: Develop a new solid-state switching technology for use on the LV distribution network. LV Remote control and automation system utilising retrofit switching devices to be installed and trialled on LPN LV network. Project registered in July 2012 – Project aims: - Undertake a large scale demonstration of technology developed in the IFI project. - Explore the benefits provided by an integrated LV remote control and automation system. Maximise utilisation of plant Quality of Supply improvements Active Network Management

LV Remote Control & Automation – System Component Devices Installed to LV Link Boxes Load-break / fault-make switches replace solid links in LV Link Boxes Local control of switches provided by a control panel (fits under LB lid). Switches being installed to a link box in place of standard links. RTU (Remote Terminal Unit) provides remote control of the LV devices. Single phase fault-break / fault- make circuit breakers (CB) retrofitted in place of the existing LV fuses. At the distribution substation LV CBs installed to a LV distribution board at a UKPN IFI trial site.

LV Remote Control & Automation - Smart LV Network Overview

Project Scope & Key Objectives: Evaluate and demonstrate the benefits of the technology over a 24 month trial/demonstration phase. Industrialise existing technology supplied for a small scale IFI project. Integrate the LV remote control technology with our existing control platforms (via DNP3, and PLC) Implement active network management tools. Strategically populate 2 selected areas within the LPN LV network with the LV Remote Control & Automation devices (54 secondary substation sites). Actively manage the LV network to improve network performance. Industrialisation & control integration Deployment Use highly granular visibility of the LV network to improve our understanding and management of the LV network.

LCNF Tier 1 - Project Location Area 1 – City Rd B South West Feeder Group. Area 2 – City Rd B North West 1 & North West 4 feeders. Trial will covers a total of 54 secondary substations supplying approximately 8400 customers.

LCNF Tier 1 - Project Location & Scale (Area 1) 7 Area 1 – SW Feeder Group Secondary Substations 3 Feeder Group, with 38 distribution substations (27 to be populated). Area is experiencing loading issues (inc load related fuse operations). 65 link boxes to be populated with LV remote control devices. City Rd B South West feeder group; evaluate proactive management of the LV network.

LCNF Tier 1 - Project Location & Scale (Area 2) 8 Area 2 – NW 1 & 4 Feeders 25 distribution substations, covering area of approx 2km Sq. Consistently worse feeders from CI/CML perspective. City Rd B North West 1 & North West 4 feeders; evaluate benefits to network performance, offered by remote control and automated switching. 101 link boxes to be populated with LV remote control devices.

LV Network Visibility – Load Monitoring A B C D NOPNOP NOPNOP -1 x RTU -3 x CBs -1 x RTU -3 x CBs -Fully populated 4 way LB, NOP in quadrant C -3 quadrants populated (9 switches installed ) as one quadrant leads to pot-end Results from an early IFI Trial Smart Urban LV Network – Available Analogues Measurement samples over 30 minute intervals. Voltage: Min, Max, Average Current: Min, Max, Average Real Power: Min, Max, Average Reactive Power: Min, Max, Average Power factor: Min, Max (i.e. closest/furthest from unity) Average THD % Voltage harmonics: Max % harmonics up to 50th harmonic (available on demand from direct request to RTU)

LV Network Faults LV Network Visibility Safety Response and isolation can take a number of hours Penalties incurred & high operational costs to resolve Remote Control Reduce operating costs for fault response Faster restoration of supply to customers Improve reliability statistics Feeder overloading due to EV, heatpumps, etc. Voltage or harmonic issues due to renewable generation Load monitoring Feeder and network voltages Load current and direction Peak fault current and direction Enables integration of distributed generation and EV Hazardous manual operations Contact arcing High fault currents Damage to transformers & cables Solid state switching Arc-less current switching Fault sensing technology Intelligent load make/ fault make technology Phase-Phase voltage fault verification / alarms Key problems and solutions Traditional LV Network Smart LV Network

Reliable communication to underground LB for control and load monitoring Power line carrier communications Power line carrier reliability and performance critical especially during LV faults –Existing solutions for smart metering inadequate for LV network automation –Design of end to end communication layers above plc networking layer critical to success G3 plc offers improved bandwidth and network formation –Higher bandwidth necessary for load monitoring –Lab test benches to simulate LV network environment –Validate performance during field trials

Short circuit withstand High short circuit withstand requirements for densely populated urban LV Network Silver tip contact welding or arcing due to blow-off forces –Load break switches utilise canted spring contact system with novel method for increasing contact force to reduce blow-off force –Canted springs increase the number of contact points and current paths –n multiple contacts create n (i/n) current paths and reduces forces by 1/n Blow apart Force F B = 4.45 x i 2 x (N) Ref: Electrical Contacts (Paul G. Slade) Blow apart Force F B = 4.45 x i 2 x (N) Ref: Electrical Contacts (Paul G. Slade)

Compact switching technology Thyristors gate drives are switched on just prior to zero crossing Pulse peak current measured Progressively increase pulse duration Analyse peak currents Determine if current is due to load or a fault Current Voltage Load Make Fault threshold level switch will not close Fault Make Solid state switching technology

Usability Challenges & Solutions Retrofit solution –Space constraints within link boxes –Optimising design to work with wide variety of installed LV switchgear Safety and operator issues –Introduce safety features to prevent un-intentional operations –Regular design review meeting using rapid prototypes to address installation and safety issues –Improvements to remote control functionality and usability based on user feedback Load monitoring –Optimisation of parameters monitored to match bandwidth available –Harmonic data storage and transfer separate from SCADA system

Progress Site selection and surveys complete. Demonstration area preparation underway. Next Gen PLC technology trialled and evaluated. Tier 1 hardware industrialisation underway. Approach to control integration (dynamic LB movement agreed) First 14 site deployment planned for Jun 2013

Thank You Any Questions? Contact Details Alexander Di Technical Development Engineer Brendan TE Connectivity R&D Manager Matthieu Michel Technology Innovation & Co-ordination Manager