Actuator Usage and Fault Tolerance of the James Webb Space Telescope Optical Telescope Element Mirror Actuators Allison A. Barto, D. Scott Acton, Paul.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

This document is not export controlled. Use or disclosure of this information is subject to the restrictions on the Title Page of this document 2.4m Space.
PROJECT RISK MANAGEMENT
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
Chapter 4 Quality Assurance in Context
Project management Project manager must;
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
DHS/DFS description, JWST Informal Monthly, November 2003 Sivaramakrishnan Co-phasing JWST during commissioning using Dispersed Hartmann Sensing or Dispersed.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
Systems Engineering Management
LSU 10/09/2007Risk Management1 Risk & Risk Management Project Management Unit #5.
Introduction to Project Management The Basics for Sustainability Management Students.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Opportunity Engineering Harry Larsen The Boeing Company SCEA 2000 Conference.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
Mark Clampin Observatory Project Scientist Goddard Space Flight Center 217 th American Astronomical Society Meeting JWST Telescope Optics: Progress Report.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
Mercury Laser Driver Reliability Considerations HAPL Integration Group Earl Ault June 20, 2005 UCRL-POST
PMI Knowledge Areas Risk Management.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Maintaining the Flow ! Testing of Nuclear Feedpumps (and other important pumps)
1 JWST Multi-Mega FE Model Studies Terry Fan/Swales Aerospace Mark McGinnis/Swales Aerospace Glenn Grassi/MSC.Software John Johnston, PH. D./GSFC May 4.
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
National Aeronautics and Space Administration From Determinism to “Probabilism” Changing our mindsets, or why PTC isn’t an easy sell - yet.
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
AAAC Presentation JWST Status Eric P. Smith JWST Program Scientist.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
1 Improving the Risk Management Capability of the Reliability and Maintainability Program An introduction to the philosophy behind the AIAA S-102 Performance-Based.
SOFTWARE PROJECT MANAGEMENT
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Fault Tolerance Benchmarking. 2 Owerview What is Benchmarking? What is Dependability? What is Dependability Benchmarking? What is the relation between.
Utility Engineers, PC.  Generation  Transmission  Distribution.
© 2009 SPACE LAB, California State University Los Angeles Fault Detection, Isolation of a Segmented Telescope Testbed Authors: Presenter: Jose D. Covarrubias.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
Smart Home Technologies
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Copyright , Dennis J. Frailey CSE Software Measurement and Quality Engineering CSE8314 M00 - Version 7.09 SMU CSE 8314 Software Measurement.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
1 Formulate Alternatives Planning Step 5. 2 Social Science Activities in Land Use Planning Planning Steps Social Science Activities Steps 1 & 2: Identify.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Andrew R Henry. 3M Drug Delivery Systems, Morley Street, Loughborough, Leicestershire. United Kingdom. The correlation chart illustrated the effect changing.
Rationale for Selected MIL-STD-1540E Thermal Test Requirement
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
CINEMA System Engineering
GLAST Large Area Telescope:
Capitalization style for Presentation Title is “Title Case”
© The Aerospace Corporation 2008 Rationale for Selected MIL-STD-1540E Thermal Test Requirement John W. Welch The Aerospace Corporation TFAWS
James Webb Space Telescope
Schedule Risk Assessment (SRA) Overview
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Schedule Risk Assessment (SRA) Overview
YuankaiGao,XiaogangLi
Margin Management Configuration Management Benchmarking Group
Schedule Risk Assessment (SRA) Overview
Presentation transcript:

Actuator Usage and Fault Tolerance of the James Webb Space Telescope Optical Telescope Element Mirror Actuators Allison A. Barto, D. Scott Acton, Paul Finley, Benjamin B. Gallagher, Bruce Hardy, J. Scott Knight, Paul A. Lightsey Ball Aerospace & Technologies Corp Commerce Street Boulder, CO 80301, USA paper SPIE Symposium on Astronomical Telescopes and Instrumentation Space Telescopes and Instrumentation 2012: Optical, Infrared, and Millimeter Wave Conference Amsterdam, Netherlands July 2012

Page Abstract The James Webb Space Telescope (JWST) telescope’s secondary mirror and eighteen primary mirror segments are each actively controlled in rigid body position via six hexapod actuators. The mirrors are stowed to the mirror support structure to survive the launch environment and then must be deployed 12.5 mm to reach the nominally deployed position before the Wavefront Sensing & Control (WFS&C) alignment and phasing process begins. The actuation system is electrically, but not mechanically redundant. Therefore, with the large number of hexapod actuators, the fault tolerance of the OTE architecture and WFS&C alignment process has been carefully considered. The details of the fault tolerance will be discussed, including motor life budgeting, failure signatures, and motor life.

Page JWST Structure & Mirrors Must Deploy In-Flight JWST’s size necessitates the telescope be stowed for launch in a folded configuration and deployed in flight Individual mirror segments must then have sufficient range to Primary Mirror Segments (PMSAs) and Secondary Mirror Segment (SMA) are stowed to withstand launch loads They must deploy 12.5 mm to reach nominal deployed configuration prior to beginning Wavefront Sensing & Control Commissioning

Page Considering Motor Failure Given that Primary and Secondary Mirrors each begin 12.5 mm from their nominal operating position, it is necessary to assess –Likelihood of failure / motor life –Ability to predict early onset of failure during life of each motor –Expected life if onset of failure is not detected prior to launch –Impact of motor failure on mission performance should it occur in flight –General consideration of fault tolerance in JWST alignment plans Mirror motors are electrically, but not mechanically redundant –Complete motor failure is considered in this presentation

Page Actuator Range and Use Budgeting Actuator use in flight is dependent on: –Range to deploy to nominal mirror positions (12.5 mm) –Total range from the nominal deployed position needed to compensate for segment and system-level manufacturing tolerances –Efficiency of the Wavefront Sensing and Control (WFS&C) process to reach the final positions Actuator use during ground I&T must also be considered for –Motor build and run-in –Subsystem-level I&T  Stow/deploy mirrors for optical testing  Motor use to verify range and resolution of hexapod actuation system –System I&T  Confirm functionality after integration  Stow/deploy mirrors for optical testing both pre/post environmental test & for cryo test  Verification of WFS&C processes and calibration of system optical influence functions

Page Determining Flight Actuator Usage Actuator use in flight is dependent on: –Range to deploy to nominal mirror positions (12.5 mm) –Total range from the nominal deployed position needed to compensate for segment and system-level manufacturing tolerances  Detailed budget has been developed to track the stack-up of all manufacturing tolerances  Includes both mirror-placement alignment tolerances on the JWST structure as well as mirror range needed to compensate for optical fabrication tolerances  Includes allocations for both the as-measured configuration and the uncertainty with which that final configuration can be measured/known  Range to compensate optical figure and system-level alignment is determined via system Monte Carlo alignment analyses –Efficiency of the Wavefront Sensing and Control (WFS&C) process to reach the final positions

Page Determining Flight Actuator Usage Actuator use in flight is dependent on: –Range to deploy to nominal mirror positions (12.5 mm) –Total range from the nominal deployed position needed to compensate for segment and system-level manufacturing tolerances –Efficiency of the Wavefront Sensing and Control (WFS&C) process to reach the final positions  Monte Carlo alignment analysis performed utilizing JWST WFS&C ground software and flight alignment processes  “Segment Update Requests” from this analysis were interrogated to determine motor usage  This motor use was then evaluated for each commissioning step to create a baseline flight process flow including conservatively estimating the number of iterations through each step should the system deploy near the edges of the tolerance stack-up described earlier  Mirror range corrected at each step was allocated based on the total allocated tolerance stack-up  Final flight motor usage by flight phase:

Page Predicting Actuator Life if Early Signs of Failure are Detected Through successive iterations of JWST mirror gearmotor design and process control investigation, several motors were run to failure or onset of failure Failures induced have all been bearing failures due to the introduction of debris into the bearing In all instances, early signs of failure can be detected by plotting pull out current vs. number of gearmotor cycles Typical plot shows three regimes: –linear increase in pull-out current –exponential increase in pull-out current –near vertical increase in pull-out current Data from the exponential portion of this curve for 10 failure cases was fit to a Weibull distribution to estimate the mean time from onset of failure to motor failure (defined as pull-out current > 0.4 amps) For a single actuator, if pull-out current begins to rise, indicating onset of failure, the motor has a 95% chance of continuing to operate for 277,000 revolutions before failure If early indication of motor failure is not caught prior to launch, likely still have 4-5x margin between required flight motor life (~60,000 revs) and remaining motor life (277,000 revs)

Page Consideration of Failure Scenarios Failure prior to subsystem delivery to Telescope I&T All hexapod motors are reworked with fresh bearings as the last step before delivery to system I&T Motor rework process includes screening and acceptance test to show motor health Only motor use following health tests above is to stow the mirror (10,000 revs) Failure during system I&T Conservative motor use budget for system I&T is 214,000 revs for SMA motors and 250,000 revs for PMSA motors Pull-out current is monitored periodically during the test phase as plotted to look for early indicator of motor failure If necessary, motors could be reworked prior to launch Outer segments more readily accessible than inner segments Would consider pull-out current signature vs. remaining ground/flight motor use Failure in flight – dependent on commissioning phase: Prior to deployment During commissioning Segment Location & Positioning Segment-Level Wavefront Control Global Phasing

Page Motor Failure Prior to Deployment SMA failure prior to or during the majority of deployment would be catastrophic due to the high sensitivity of telescope focal surface position to SMA despace position Impact of a PMSA motor failure much more benign and can be accommodated with only minor degradation to telescope performance Would use remaining 5 hexapod actuators and radius of curvature actuator to align the failed segment to the remaining 17 segments in tilt and focus Results in a deterministic PSF that can be deconvolved from science images to mitigate the effect of the failure Effect of this on system performance, without taking advantage of deconvolution, is ~11% impact to Strehl and ~14% impact to encircled energy (shown above)

Page Motor Failure During Commissioning Corrections During Each Phase Segment Location & Positioning Phase Majority of PMSA tilt error corrected during this phase Significant SMA piston errors corrected during this phase as necessary Segment-Level Wavefront Control Global Alignment provides correction of segment-level alignment errors and PMSA- level astigmatism Majority of PMSA piston, decenter, clocking alignment errors corrected Coarse MIMF uses data from across NIRCam FoV to find best global position for the SMA Majority of SMA tilt and decenter corrected here as long as NIRCam provides a good representation of ISIM alignment Global Phasing If assumptions above regarding Coarse MIMF are valid, segments motions will be no more than a few hundred microns during Global Phasing If Coarse MIMF assumptions are not correct, millimeter-class adjustments of SMA decenter/tilt could be required during this phase Continued heavy use of the SMA is expected during this phase as commissioning iterates through Global Alignment (requires SMA motion +/- 400 um) and Multi- Instrument Multi-Field (MIMF) (requires SMA motion +/- 100 um)

Page Motor Failure During Commissioning Mitigating Considerations Calculations of required motor use in baseline commissioning plan assume all degrees of freedom are used to best-optimize telescope performance Utilizing only PMSA strong degrees of freedom (despace/tilt) still provides compensation of low-order system errors with minor degradation to performance If a motor were to fail or if there was concern over a particular motor, decision could be made to only use strong degrees of freedom Current plan corrects strong degrees of freedom during the first iterations of Global Alignment and saves the weak degrees of freedom for later in the process Most significant corrections made earlier in motor life If SMA (needed for Global Alignment sensing) has motor failure during the process, lesser impact to not iterating through global alignment to correct weak degrees of freedom

Page Motor Failure During Commissioning Mitigating Considerations Generally WFS&C process always improves the state of the Observatory with a few notable exceptions; decision tree is closely followed to ensure consideration of necessity is made prior to large moves that could temporarily degrade the state of the telescope SMA use of +/- 400 um during Global Alignment sensing Potential large decenter/tilt of SMA during MIMF in Global Phasing Because SMA is on-axis clocking orientation need not be controlled, allowing significant motion to recover from a failure at +/- 400 um from the ideal despace position and allowing large decentration to correct SMA global position in the presence of a motor failure

Page Motor Life Expectations Historically JWST has had successive gearmotor design improvements for reliability and life Motor history shows variability in life performance between motors, implying process variability FRB investigation of 2011 qual tests uncovered several processing steps allowing variability in final motors that lead to debris generation from the steel ribbon retainer, causing motor failure Final gearmotor design added process controls to eliminate sources of variability; steel ribbon retainer generating the debris was replaced with PGM-HT crown retainer Qualification testing of 6 units (3 run to 2x life, 3 run to 7x life) show the design and process improvements implemented have significantly improved life and variability such that motor life should no longer be a concern for JWST

Page Summary Careful planning has been implemented for the limited life resource of the mirror motors There is a robust understanding of the expected motor use – both in flight and I&T Monitoring plan is in place to assess motor health during I&T and prior to launch I&T usage of motors has been minimized as practical Analysis of failure data shows the number motor revs needed to complete flight deployment and WFS&C commissioning is 4-5x less than the available revs between detectable onset of failure and motor failure Impact of motor failure in flight has been assessed by motor phase –During majority of commissioning process motor failure poses only limited risk to Observatory performance Decision tree process is in place when considering large changes in configuration late in the commissioning process that could result in temporary degradation to Observatory Performance Qualification data from final motor design shows robust motor design and assembly process has been put in place –Shows no degradation in motor performance after 7x life

Page Acknowledgements & References Acknowledgments Work was supported in part by the Ball Aerospace & Technologies Corp. subcontract with Northrop Grumman Aerospace Systems under the JWST contract NAS with NASA Goddard Space Flight Center The JWST system is a collaborative effort involving NASA, ESA, CSA, and the astronomy community References [1]Knight, J. S, et al., “Observatory Alignment of the James Webb Space Telescope,” SPIE , these proceedings (2012). [2] [3]Lloyd Schlitzer, “Monte Carlo Evaluation and Development of Weibull Analysis Techniques”, ASLE Transactions,Vol. 9, Iss. 4, [4]Jessica Gersh-Range, et al, “Minimizing the Wavefront Error Degradation for Primary Mirror Segments with Failed Hexapod Actuators”, Opt. Eng. 51, (2012). [5]Knight, J. S. “Effect of Single Segment Failure to Deploy (Maverick Segment), Rev B,” JWST Technical Document 06-JWST [6]D. Scott Acton, et. al., “Wavefront Sensing and Controls for the James Webb Space Telescope,” SPIE , these proceedings (2012). [7]Gallagher, Ben, “JWST Gearmotor FRB Final Summary Report,” Ball Aerospace & Technologies Corp. JWST Systems Engineering Report (2012).