Development of ML-BPM for STF cryomodule H. Hayano, KEK SunYoung Ryu, PNU.

Slides:



Advertisements
Similar presentations
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Cavity BPM for Spectromety: progress and plans A. Lyapin.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
Chris Adolphsen Main Linac Integration. CAVITY VESSEL T4CM QUAD/Correctors T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The Cavity Beam Position Monitor (BPM) Massimo Dal Forno Paolo Craievich, Raffaele De Monte, Thomas Borden, Andrea Borga, Mauro Predonzani, Mario Ferianis,
Tomoyuki Sanuki, Daisuke Okamoto, Yosuke Honda, Toshiaki Tauchi TB&SGC meeting.
Status of the ILC Main Linac BPM R&D Thibaut Lefevre CERN Claire Simon CEA Sacley Sebastien Vilalte LAPP Manfred Wendt Fermilab 11/19/20081ILC08 Main Linac.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
High resolution cavity BPMs in the context of the European XFEL
Status of the Cold BPM Developments at CEA Saclay and Fermilab L-Band Cavity BPM: Nathan Eddy, Andrei Lunin, Eric Pirtle, Gennady Romanov, Nikolay Solyak,
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
LASER FRAME: Straightness monitor (Tentative results of resolution test) Third Mini-Workshop on Nano Project at ATF May 30-31,2005 KEK Nano BPM Group Y.Higashi,
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
Beam Test status and Plans of the ILC Main LINAC BPM
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 1 SRF Work Packages 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
Cavity BPM Simulations A. Liapine. Analysis of the Existing BPMs BINP KEK.
S-band BPM at KNU Hyoung Suk Kim KNU.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Main Linac Issues for RDR 1/20/2006 Area group H. Hayano From Linac Area discussion posted on the web:
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
S1G Experiment Schedule Plan
Status of BPMs and Electronics System at KNU.
Re-entrant BPM R&D for ILC Main Linac
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
IPBPM test results at the LINAC end
KNU IP-BPM and Reference cavity
CLIC Workshop 2016: Main Beam Cavity BPM
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Fabrication of KEK-ATF2 Q-BPM
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
Presentation transcript:

Development of ML-BPM for STF cryomodule H. Hayano, KEK SunYoung Ryu, PNU

History and Background Development was started in 2005 for STF cryomodule BPM. T. Hino (M. student of Tohoku-Gakuin Univ.) for ( 1st version of model BPM) SunYoung Ryu (M. student of Pusan National Univ. Her teacher:Jung Keun Ahn, with connection to ILC-Asia contact: Eun San Kim ) for 2007, She will continue the development for ( 2nd version of model BPM, then go to proto-type)

Design Requirement High resolution ( < 1µm for single pass ) Good fiducialization capability with respect to magnetic center (cylindrical outer, good common-mode rejection required) Big beam-pipe aperture ( 78mm diameter ) HPR washable and cleanness required Need to withstand wide thermal excursion without vacuum leak Bunch-to-bunch signal acquisition required ( low QL ) No interference with cavity HOM( GHz and > 2.3GHz) Cavity BPM with 4 slots coupled; high resolution, good fiducialization, withstand to thermal excursion Use 2nd higher mode; match to big beam pipe, easy to get low QL 4 slots open to beam pipe; HPR washable Drawback: Big size, heavy, Feed-through are weak to HPR & thermal excursion

HFSS model of 2nd version Slots for HPR wash Cavity diameter: 312 mm Cavity thickness: 20 mm Slot width: 10 mm Beam pipe diameter: 78 mm Material: SUS Coupling Slots Used Mode: TM120 F0: 2.04GHz QL: 260

S11 & S21 on 1.8GHz ~2.3GHz TM GHz RF properties of Model BPM X-Y isolation : < -30dB How close to other mode signal : df=80MHz WG cut-off 1.7GHz

Antenna Scan results X-scan with anti-phase combiner 10µm step Y-scan with anti-phase combiner

Schedule of Development Feb - May : preparation of beam test at ATF using this model cavity in a big chamber Jun : beam test at ATF Linac end Feb - Jun: in parallel, design comparison with Saclay BPM, FNAL BPM, SLAC BPM Jun : Decision of design and direction of development July - : development feed-through connector. design of vacuum tight BPM design of electronics Fall : fabrication of vacuum tight BPMs (three of them) ( three-BPM method for resolution estimation)