copyright Value Chain Group © all rights reserved Enterprise Wide Cross Industry Domain or Industry Specific Product / Project Lifecycle Improvement Projects.

Slides:



Advertisements
Similar presentations
Copyright The Info-Tech Research Group Inc. All Rights Reserved. D1-1 by James M. Dutcher Strategic IT Planning & Governance Creation H I G H.
Advertisements

A BPM Framework for KPI-Driven Performance Management
First create and sign up for a blue host account Through the help of Blue Host create a WordPress website for the business After you created WordPress.
Global Congress Global Leadership Vision for Project Management.
GE Healthcare UK Performance Solutions
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Business Architecture
Building an Operational Enterprise Architecture and Service Oriented Architecture Best Practices Presented by: Ajay Budhraja Copyright 2006 Ajay Budhraja,
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
All Rights Reserved: JusticeExperts.com Enterprise? What Enterprise? Enterprise Development.
CATEGORIES OF INFORMATION There are three main categories of business information,and these are related to the purpose for which the information is utilized.
The Use of Zachman Framework Primitives for Enterprise Modeling
Creating Architectural Descriptions. Outline Standardizing architectural descriptions: The IEEE has published, “Recommended Practice for Architectural.
Nov. 14, 2007 Systems Engineering ä System ä A set or arrangement of things so related as to form a unity or organic whole. ä A set of facts, principles,
Project Management Methodology (PMM)
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
Certified Business Process Professional (CBPP®)
Course Instructor: Aisha Azeem
Certified Business Process Professional (CBPP®) Exam Overview
Chapter 14 Business Process Management Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Enterprise Architecture
Object-Oriented Analysis and Design
BPM Governance Identifying methods for prioritizing, standardizing, measuring and controlling BPM efforts.
What is Business Analysis Planning & Monitoring?
MDC Open Information Model West Virginia University CS486 Presentation Feb 18, 2000 Lijian Liu (OIM:
Developing Enterprise Architecture
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Process: A Generic View
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
The Evergreen, Background, Methodology and IT Service Management Model
1 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 6 System Engineering - Computer-based system - System engineering process - “Business process” engineering - Product engineering (Source: Pressman,
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Alcatel-Lucent CDC Workshop, Coaching & Knowledge Transfer Project Management.
Business Analysis and Essential Competencies
The Challenge of IT-Business Alignment
Copyright © 2013 Curt Hill The Zachman Framework What is it all about?
9/14/2012ISC329 Isabelle Bichindaritz1 Database System Life Cycle.
0 COMPETITIVE INTELLIGENCE A PROCESS THAT CREATES COMPETITIVE ADVANTAGE NOT A REPORT THAT SITS ON A SHELF Plan Integrate Collect Analyze Communicate 4200.
Week 2 Seminar: Project Scope Management
1-1 System Development Process System development process – a set of activities, methods, best practices, deliverables, and automated tools that stakeholders.
Lecture 7: Requirements Engineering
1 Introduction to Software Engineering Lecture 1.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Develop Project Charter
The Value Driven Approach
PRJ566 Project Planning & Management Software Architecture.
Proventures reconnect session on Project Portfolio Management (PPM)
Foundations of Information Systems in Business. System ® System  A system is an interrelated set of business procedures used within one business unit.
Foundations of Geospatial System Development Todd S. Bacastow Professor of Practice for Geospatial Intelligence John A. Dutton e-Education Institute The.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 Click to edit Master title style What is Business Analysis Body of Knowledge?
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
UTA/ARRI. Enterprise Engineering for The Agile Enterprise Don Liles The University of Texas at Arlington.
Software Engineering Lecture 10: System Engineering.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
Aligning Business Process Architecture and Enterprise Architecture: A Model Driven - Service Oriented Approach Chris Capadouca Business Solutions Architect.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Source: Article reprinted from 2014 Cloud Survey Report, Copyright: KPMG LLP © 2015, a Delaware limited liability partnership and the U.S. member.
©2009 HP Confidential1 1 Teresa Schlegelmann CMS World Cup 2010 AMS - Houston Solution Consulting Services.
What’s New in SPEED APPS 2.3 ? Business Excellence Application Services.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Michael J. Novak ASQ Section 0511 Meeting, February 8, 2017
Rapid Launch Workshop ©CC BY-SA.
Data Architecture World Class Operations - Impact Workshop.
Identify the Risk of Not Doing BA
Establishing a Strategic Process Roadmap
Presentation transcript:

copyright Value Chain Group © all rights reserved Enterprise Wide Cross Industry Domain or Industry Specific Product / Project Lifecycle Improvement Projects System Blueprints System/Functions dictionaries are used to manage both business context and business content. Defines all interfaces with methods/functions required for the collaboration data manipulations and interactions between system and application functional capabilities.

Semantic Framework Elements Governance enables explicit definition of roles, metrics and rules governing process transformation specifies how processes are measured, modeled, analyzed, promoted to, replaced or removed from the execution environment Methodology ties all elements together specifies techniques, methods and tools used for each step of the business transformation specifies steps and deliverables of using semantic EA framework enables continuous improvement of the framework Process (modeling and analysis) enables representation of process flows including every detail required for successful mapping to technology reference architecture processes can be defined by practitioners, not just EA specialists processes can be analyzed to determine root causes of underperformance consensus can be developed between various process owners and stakeholders Reference Run-Time Architecture provides components and semantics for process execution monitors and life cycle manages various versions of processes in execution provides security, scalability, portability and reusability of the process execution environment

Facilitates creation of strategies or solutions in weeks, not months, without re-work. Quick start up and less frustration due to organized framework and management. Effective communication (common language) Pre-defined process definitions, metrics and best practices Application independent Redirects focus from systems to processes. Focus on resolving problems rather than symptoms. No systems internal functionality knowledge required to understand a process description No need for translation for software and process experts. Easy lookup of predefined definitions. Reusability of project documentation. Using same metric definitions and formulas = measurable Formulation of strategy in terms of measurable high-level business objectives. Metrics are tightly connected to performance attributes Change projects are identified based on chain (s) performance rather than point solutions. Competency which does not require involvement of external consultancy. Shorter project lifecycles (fast startup and execution) saves money. Prevention of re-work and abandonment of non-value- add IT solutions Metrics Driven Process Focus Speed of Execution Cost Saving copyright Value Chain Group © all rights reserved VRM Value Proposition

copyright Value Chain Group © all rights reserved Value Reference Model

VRM methodology was designed from an holistic perspective with the following objectives in mind: to see better. to understand better. to act better. Its underlying structure is integrated into the VRM model, enabling analysis of value chain strategies and interactions. Systems Based Approach

CustomerNetworks SupplierNetworks Model Coverage

General Framework Level 1 Level 2 Level 3 Metrics Configurations Input /Output Technology Practices

copyright Value Chain Group © all rights reserved Extensible Reference Model

When modeling value stream any element from any dictionary is useful for as long as: - Dictionaries follow same class structure, - Elements have normalized definitions - Dictionaries are adding different levels of specificity - Terminology is applicable to the context of the value stream XRM Example: ProductDevelopment

Water Resources Agriculture Public Works Oil Product Development Supply Chain Customer Relations ElectricityManufacturing XRM Dictionaries are created to provide company, industry and/or domain specific activity models. XRM models are loosely coupled to provide flexibility while maintaining context to an overarching VRM framework. copyright Value Chain Group © all rights reserved

Business Process Definition Dictionaries Typical Business Process Configurations Specific Business Process Designs Industry Neutral Reference Model Enterprise Dictionaries Enterprise ValueStreams Region – Product – Relationship Specific Process Flow Design Process Blueprints for Implementation Business Architecture Structure Structure ScopeExample VRM Base Map XRMs Order to Cash Procure to Pay North America OEM Customer Order Delivery e-Procurement Blueprint

Education Pilot Project Program Charter Program Execution Point of Commitment DiagnosticBPTF Framework Best Practice Assessment Detailed Process Designs Solution Deployment BPTF Roadmap 1.Instantiate VRM Database 2.Load - Work Units, Roles, Locations, Products …. 3.Indentify Key Business Processes 4.Collect & Translate Existing Process Documentation 5.Instantiate Extended Process Structure 6.Prune unrelated dictionary items 1.Identify Pilot Stakeholders & Scope 2.Develop Pilot Charter 3.Design Team Education 4.Executive Priorities Dimensions 5.Design Workshops 6.Metric Session 7.PACOM Session 8.End to End Design Session 9.Report Out Best Practice Templates

  Step 1 - Front End Education a.Champion Education b.Establish initial program vision c.Identify program stakeholders d.Educate key stakeholders e.Build stakeholder support Step 2 - Charter VRM program a.Recruit program sponsor b.Define program intent c.Document process and organizational scope d.Specify program approach e.Allocate program resources f.Define program measures of success and assumptions g.Establish program timeline Step 3 - Establish ValueStream Design Charter a.Create a high level description and purpose of the process b.Define strategic goal of the process c.Establish tactical objectives to accomplish the strategic goal

    Step 1 – Review Process Design a.Red line process diagrams b.Update process design as required c.Submit for review until full consensus is achieved Step 2 – Create Process Definition Templates a.Create process definition b.Describe the purpose of the sub process c.Establish the tactical objectives of the sub process d.Determine the functional areas required to perform the process (Supply Chain, Sales, Marketing etc...) Example – Master Schedule Scope Definition (Plan, Release and Daily Management) Step 3 – Define Process Elements Example – Existing Master Schedule Documentation Step 4 – Generate Scenario Summary Report a.Compile process design deliverables b.Run final process diagrams c.Run scenario summary reports

P2P Use Case

Scenario Design & Analysis

Changes belong to the following five categories: Consensus on root causes needs to lead to a consensus on changes P rocess Can we change the flow How can we change the flow to eliminate the root cause A utomation Can we speed up some steps How can we reduce information gathering and dissemination time C ulture Why are we sticking to old habits Do we have any motivational inertia in our resource base (retirement, stalled careers, …) O rganizational Are we managing resources in a balanced fashion Is organizational reporting aligned with process responsibilities M etrics Are we measuring right indicators What should we measure to get better proactive signs PACOMs

Change ideas are documented during process design sessions Functional (along key bottlenecks) Cross-functional (along key gaps or interfaces) Changes are classified by PACOM and assigned Rate of impact Rate of difficulty Changes are prioritized by two factors Determine PACOM spread at the top of the list More PA is better More COM requires governance considerations

e-Procurement Performance Analysis

e-Procurement Blueprint – Issue Order

Issue Order- XML Blueprint Export