EQUIPMENT VALIDATION.

Slides:



Advertisements
Similar presentations
Tips to a Successful Monitoring Visit
Advertisements

PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Radiopharmaceutical Production
Software Quality Assurance Plan
World Health Organization
Overview of Validation Requirements Pharmaceutical Industry
A Seminar on 1.  Validation vs Qualification  Why to validate?  Who should do Equipment Validation?  Parts of Equipment Validation  Validation of.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Supplementary Training Modules on Good Manufacturing Practice
Quality Assurance/Quality Control Policy
A seminar On Validation Of Ampoule Filling & Sealing Machine
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
Validation SAPRAA March 2013.
WHO Supplementary Training Modules GMP
A Seminar On Validation Master Plan(VMP) & Calibration Master Plan(CMP)
Qualification of HVAC systems
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Radiopharmaceutical Production
EQUIPMENT QUALIFICATION/VALIDATION
Codex Guidelines for the Application of HACCP
A Seminar on 1.  Why to validate?  Parts of Equipment Validation  Who should do Equipment Validation?  Equipment qualification  Typical process flow.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Basic Principles of GMP
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
VALIDATION METHODOLOGY
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
From Research Prototype to Production
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
NIST Special Publication Revision 1
1 Importance of Instrument Validation for Accredited Food Export Testing Labs.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
VALIDATIONS: TOWARDS RELAIBLE QUALITY OUTCOMES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455)
Module 4Slide 1 of 23 WHO - EDM Validation Basic Principles of GMP.
The world leader in serving science Validation and Qualification Overview Mike Garry Software Product Manager Spectroscopy Software Platform Team.
Pharmaceutical Quality Control & current Good Manufacturing Practice
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
M ODULE 8 – Q UALITY S YSTEMS IN A P RODUCTION L AB Shelley O’Grady, M.S. Associate Professor, Biotechnology Dept. Austin Community College.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
1. Our Presentation Topic: Importance Of Validation & Qualification In Pharmaceutical Industries Presented By: Md. Tanjir Islam (Group C) 2.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
World Health Organization
World Health Organization
Pharmaceutical Quality Control & current Good Manufacturing Practice
Author: Nurul Azyyati Sabri
Water for Pharmaceutical Use
QUALITY ASSURANCE AND QUALITY CONTROL IN GENERICS
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
Supplying the critical industry’s
PSS verification and validation
DOE Review of the LCLS Project October 2006
Machine Protection PLC Based System Verification and Validation Plan
Atefeh Sadeghzadeh Control engineer – Target safety and control
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Computer System Validation
Presentation transcript:

EQUIPMENT VALIDATION

User Requirement Specification Installation Qualification This V-Model figure shows how links the URS, Functional Specification, Design Qualification and the Testing Qualifications (IQ, OQ, PQ) :     User Requirement Specification Performance Qualification Functional Specification Operational Qualification Design Qualification Installation Qualification Installation Flow chart

Head of Engineering wherever applicable Head of Quality Control RESPONSIBILITIES Validation team shall comprise of 4 sections as mentioned below. Validation core committee Head of QA      Head of Production      Head of Engineering wherever applicable      Head of Quality Control ·       Validation task force leader QA in-charge ·        Validation coordinator Representatives from QA Execution team Representative from QA      Representative from Engineering,      Representative from Production      Representative from Quality Control

User Requirement Specification (URS) The URS defines the functions to be carried out, the data on which the system will operate, and the operating environment. All major equipments / systems shall have a formal User Requirement Specification User shall prepare the URS as per the requirements and it shall be approved by Authorized personnel. v      This document shall describe all essential requirements as described below v                Equipment / System Requirement v                Operational Requirements v                GMP Requirements v                Safety Requirements v                Documentation Requirements v                Reference and final approval of document. The URS links to PQ phase, where in all the requirements adherence is verified.

Data Sheet (Functional Specification) Data Sheet describes the detailed functions of the equipment / system. The Data Sheet is the base for the development of design specifications and provides the acceptance criteria for the corresponding test plans and specifications. Based on URS, Data sheet (functional Specification) shall be prepared by Engineering department and forward data sheet along with indent to purchase. The Data Sheet should detail the specifications as described below: v                Detail design specifications for each of the components in equipment. v                Description of functions and acceptance criteria v                GMP requirements, which should be complied by equipment / system v                List of Related documents required to be provided by the vendor The Data Sheet links to OQ phase, wherein all the functions specified are being tested. v        

Design Qualification (Design Specification) This describes the equipment or system in sufficient detail to enable it to be built. The key design specifications are identified as below: Design Qualification (Design Specification) shall be prepared by the vender in conjunction with engineering department, after finalization of vendor. Authorized personnel of both the sides shall approve DQ. v                Major components design specification includes MOC for critical components v                Process control instruments/ devices specifications v                Description of safety features including alarms / interlocks. v                Required utilities with specifications v                System / equipment engineering drawings (Mechanical / electrical). v                Piping and instrumentation diagrams (P&ID). v                Software/PLC specifications including drawings, wiring diagrams etc. The supplier in conjunction with engineering department prepares Design Qualification. The Design Qualification links to IQ phase, wherein all the specifications stated are being verified. v   Factory Acceptance Test (FAT) shall be performed by vendor in presence of Engineering/user department personal at the factory before shipment of the equipment wherever appropriate. v     Site Acceptance Test (SAT) shall be performed by vendor in presence of Engineering/ user department personal at the site before installation of the equipment wherever appropriate.

Installation Qualification (IQ) Operational Qualification (OQ) Performance Qualification (PQ)

Installation Qualification Installation qualification is associated with the installation of the system/equipment. Its function is to verify static attributes through defined procedures and supporting documentation that all critical aspects of the system have been installed in accordance with the approved Design Qualification and manufacturer’s recommendations. The following tests shall be covered in installation Qualification. In each of the following tests the documents / parameters / systems described in the appropriate test data sheet shall be verified as per the procedure outlined therein. Identification & verification of documents – The purpose of this test is to identify & verify the availability of documents associated with the equipment/system.   Identification & verification of supporting utilities – The purpose of this test is to identify & verify that all the utilities required for installation & operation of the equipment/system have been provided as per specifications in P&ID / manual.

Installation Qualification Verification of equipment as per the drawings – To verify that the piping & electrical wiring has been done as per the wiring diagrams and that the equipment/ system has been installed as per the drawings provided in the installation manual.  Identification & verification of Instruments – The purpose of this test is to identify and verify the major process monitoring / control instruments present in the equipment/ system. Identification of safety & interlock system – The purpose of this test is to identify & verify all the safety & interlock features present with the Equipment/ system. Identification of standard operating procedures – The purpose of this test is to identify the relevant SOP’s for the equipment.

Installation Qualification Verification of major components & accessories – The purpose of this test is to verify that the major components & accessories of the Equipment/ system are present & that no physical damage has occurred to the same. Verification of specifications of major components – The purpose of this test is to verify that the major component / accessory is as per the specifications. Verification of material of construction – The purpose of this test is to verify the ‘material of construction’ of major components & accessories present in the Equipment/system is as per the specifications. Verification of equipment installation – The purpose of this test is to verify that equipment/ system (including sub-components & accessories) is properly installed as per the manufacturers specifications / system requirements.

Operational Qualification Operational qualification function is to verify the equipment operation with functional testing through out all anticipated operating ranges. The operational tests will be designed to demonstrate the equipment’s ability to operate in accordance with approved functional specifications. The following tests shall be covered in installation Qualification. In each of the following tests the parameters / functional keys described in the appropriate test data sheet shall be verified as per the procedure outlined therein. Calibration of Process control instruments – Is to verify the calibration status of the process control instruments that are required for the effective operation of the equipment. Verification of functional keys – Is to identify the presence of all the functional keys in the equipment & that they performs the intended action when activated / operated.

Operational Qualification Verification of design parameters of the equipment – Is to verify that the equipment supplied is as per the standard / design parameters. Verification of standard operating procedures – Is to verify all the relevant SOP’s for their accuracy. Verification of sequential operation of the equipment [simulation cycles] – Is to demonstrate that the equipment / system is capable of achieving the desired results reproducibly when operated as per the set parameters. Verification of effect of power failure on the equipment – Is to ensure that the system reverts to fail-safe condition in event of power failure, and that it returns to the specified state when power is restored and can be restarted.

Performance Qualification The function of Performance qualification is to verify through testing whether the system / equipment can operate the process as specified in the User Requirement Specification under normal and boundary conditions. This PQ protocol generally includes the following: Describe the specific tests to be conducted and rationale for testing. Test procedure includes sampling plan and acceptance criteria. A list of all test instruments used in execution of the PQ with calibration status. Test data sheets to document all testing and test results.