Kevin Bacon game: Flood modeling edition David Ford Consulting Engineers, Inc. Sacramento, CA California Water & Environmental Modeling Forum Oct. 2006.

Slides:



Advertisements
Similar presentations
Hydrologic Modeling with HEC-HMS
Advertisements

WinTR-20 Calibration ProceduresFebruary WinTR-20 Calibration Procedures.
Generating Flow Frequencies – Updating NOAA Atlas Precipitation Frequency for California by: John High, Hydrologist Sacramento District Sacramento District.
DES 606 : Watershed Modeling with HEC-HMS Module 12 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Terrain for the Lower Colorado River Flood Damage Evaluation Project Erin Atkinson, Halff Associates, Inc. Rick Diaz, Lower Colorado River Authority Symposium.
Review of Flood Routing
Water Management Section, Sacramento District, US Army Corps of Engineers Climate Impacts on Reservoir Rule Curves Stu Townsley Chief, Water Management.
Water Quality Model: Flow Input Needs and Low Flow Selection December 14, 2011 Laura Weintraub.
CHARACTERISTICS OF RUNOFF
Modeling Rainfall Runoff and Snowmelt in the Pine Flat Watershed By Rachael Hersh-Burdick USACE Water Management Sacramento District UC Davis Civil and.
Hydrologic Simulation Models
HEC-ResSim Enhancements
Reading: Applied Hydrology, Sec 15-1 to 15-5
Soil Water Assessment Tool (SWAT) Model Input
Kansas City Industrial Council Hydrology and Hydraulics
1 Real Time Flood Forecasting for the Willamette Basin using HEC-CWMS / ResSim Modeling Real Time Flood Forecasting for the Willamette.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
How bad is climate change going to impact water delivery? Kevin Richards and K.T.Shum, EBMUD - California Water and Environmental Modeling Forum Annual.
Map Modernization Management Support Best Practices Project - FEMA State of Idaho Idaho Department of Water Resources Boise, Idaho November 2008.
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
Use of GIS in Determination of the Probable Maximum Flood at Nuclear Plant Sites Presented by: Monica Anderson, GISP Tennessee Valley Authority Carrie.
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Module 6: Routing Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013 Module 6 1.
FLASH FLOOD PREDICTION James McDonald 4/29/08. Introduction - Relevance  90% of all national disasters are weather and flood related  Central Texas.
Corps Water Management System Hydrologic Engineering Center USACE Hydrologic Engineering Center Davis, CA Davis, CA.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Channel Flow Routing Reading: Applied Hydrology Sections 8.4, , 9.7.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
Multiple Purpose Dam & Reservoir
Development of a Geographic Framework for an Integrated Flood Modeling System Oscar Robayo Tim Whiteaker August 10, 2004 University of Texas at Austin.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
YCWA Flood Management for Relicensing 9/24/14 9/24/20141.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
Characterization of Watersheds from DEMs using Spatial Analyst/ArcHydro Robert G. Burns, P.G. Engineering Geologist DWR – Division of Safety of Dams Watershed.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Hydrologic Objects for Modeling: One Viewpoint Thomas A. Evans US Army Corps of Engineers Hydrologic Engineering Center.
FLOOD ROUTING Flood Routing Techniques Siti Kamariah Md Sa’at PPK Bioprocess
US Army Corps of Engineers BUILDING STRONG ® Proposed Floodplain Inundation Mapping on the Flathead River Travis Ball Hydraulic Engineer
March Urban Flood Risk Management. March Objectives Understand the Nature of Flooding & Flood Damage Alleviation Understand the Nature of.
ERT 246 Hydrology & Water Resources Eng.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Sanitary Engineering Lecture 4
Regional to Engineering Scale HUC8 HUC12 Catchment Engineering Hydrology Engineering Hydraulics Personal – a flooded home.
Basic Hydrology: Rainfall-runoff based methods – III
Basic Hydrology & Hydraulics: DES 601
Sacramento: Flood Risk
Routing-Hydrologic and Hydraulic
DES 606 : Watershed Modeling with HEC-HMS
DES 606 : Watershed Modeling with HEC-HMS
Management of Flood Waters through Mcphee Reservoir
Review of Flood Routing
Map-Based Hydrology and Hydraulics
Modeling tools Training Module
Hydrologic Simulation Models
CEVE 412/512 Dr. Phil Bedient Jan 2016
Sacramento: Flood Risk
Hydrologic River Routing
Hydrology.
Components of an HEC-HMS Model
Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS
Hyrum Reservoir and how it applies to Flood Control by Nathan Wright
Love Field Modernization Program
Hydrotechnical Design Guidelines for Stream Crossings
Presentation transcript:

Kevin Bacon game: Flood modeling edition David Ford Consulting Engineers, Inc. Sacramento, CA California Water & Environmental Modeling Forum Oct. 2006

Kevin Bacon game According to Wikipedia (so it must be right, huh?) The trivia game Six Degrees of Kevin Bacon is based on a variation of the concept of the small world phenomenon which states that any actor can be linked, through their film roles, to Kevin Bacon. The game requires a group of players to try to connect any film actor in history to Kevin Bacon as quickly as possible and in as few links as possible.

Kevin Bacon game example

Here is an example, using Elvis Presley: Elvis Presley was in the movie Change of Habit (1969) with Edward Asner. Edward Asner was in the movie JFK (1991) with Kevin Bacon.

Rules of the Kevin Bacon game: Flood modeling edition Rule 1: I made up the game, so I get to make up the rules. Rule 2: Forget the movies—no Hollywood here. Rule 3: Link one flood model/study/modeler with another flood model/study/modeler with rational linkages.

Round 1: These 2 studies

Comp. Study hydrologic analyses Highly regulated stream, so fitting frequency model to gaged data not appropriate. Common design storm approach (at right) wouldn’t work. [Where do you position the rainfall in a 26,000 sq mi watershed?] Alternative approach, documented by Hickey et al. in ASCE journal, relies on gaged flows, historical patterns, composite floodplain concept. [See John Hickey for reprint.]

Comp. Study hydraulic analyses Hydraulic analyses use unsteady network model—the mother of all UNET models initially. Geometric data collected using digital terrain models and bathymetric surveys (2-ft contour lines.) Over 100 routing reaches and approximately 3,000 cross sections. Extensive use of advanced modeling features, including hydraulic storage areas, lateral weirs, flow diversions, levees, and bridges.

We love the Comp Study H&H (mostly)

Yuba-Feather basin Oroville Dam New Bullards Bar Dam

Yuba-Feather operation challenges Contributing watersheds large, with much unregulated flow. Rainfall and snowmelt runoff. Travel times long. Dynamic natural + engineered system. Operations managed by several agencies.

Benefit of forecast-coordinated operation Reservoirs interconnected, so decisions felt throughout system.

Benefit of forecast-coordinated operation Reservoirs interconnected, so decisions felt throughout system. Greatest benefit when operations coordinated. For example, best use of 300 kcfs capacity at confluence considers current and future states of both reservoirs.

Yuba-Feather F-CO

Relationship of Comp Study and F-CO Corps of Engineers did extensive study of hydrology and hydraulics in Central Valley for the Comprehensive (Comp) Study DWR study used design hydrographs from Comp Study to investigate flood operation options for Oroville and New Bullards Bar reservoirs. Findings from study supported concept of F-CO project efforts; models formed foundation for work.

Round 2: These 2 storage facilities

D05 watershed and channels

How should we determine the 100-yr Howe + Northrup?  Use 100-yr design storm yr d/s boundary condition (BC)  Use 100-yr design storm + ? d/s BC  Use ? design storm yr d/s BC  All of the above

“Coincident frequency” analysis If statistically independent, use total probability theorem Pick a stage Use eqn to get probability Pick another stage Repeat, repeat, repeat Combine to get stage-probability

Interior area elevation-frequency function (at pond)

Illustration of computation LAR (exterior) stage (ft) (1) F(32.18| LAR stage) (2) F(LAR stage) (3) F(32.18| LAR stage) * F(LAR stage) (4) sum = 0.04

Hydrology for map modernization for San Joaquin basin? Although study not yet completed, hydrology tools being developed. Can’t use typical simple river approach in lower reaches due to impact of SJ river. So what do we do?

Round 2: D05 pond and New Melones Dam Stages in channel upstream of D05 pond affected by watershed runoff AND by pond elevation, which is affected by LAR stage. Need “coincident frequency analysis” to account properly for both upstream and downstream conditions if independent. Stages at some locations in channel downstream of New Melones affected by releases and San Joaquin River flow (stage), so need coincident frequency analysis here too.

Round 3: These 2 guys

Martis Dam PMF study Joe DeVries managed PMF study (for Corps) of Martis Dam. PMF=runoff from severe combo of meteorologic + hydrologic conditions. Caused by PMP. PMP in this watershed has snowmelt.

FERC snowmelt guidelines Compute using HEC-1 energy-budget model. Requires Shortwave radiation Dewpoint temperature Temperature sequence Wind speed sequence Rainfall sequence Area covered by snow at start of storm Snowpack water equivalent Snowmelt temperature Change in temperature with elevation

Where do we get data to calibrate/ verify snowmelt model? Our hero

Round 3: Joe DeVries and David Parker Joe DeVries managed PMF study of Martis Dam for Sacramento District of Corps. Martis Dam PMF inflow includes snowmelt runoff, so snow data + snowmelt model needed. Snow data stored by CDEC. David Parker manages CDEC data dissemination system.

What’s my point? Kevin Bacon linkages are a fact in flood modeling. Flood studies often related by goals, methods, data, analysts, results. We never really finish much. Flood studies may have a long legacy, so: Do them good enough initially. Take the time to document them. Share your toys. Flood models, carefully assembled, can be re-usable and scalable.