1 Transportation Operations Group Utility Research at TxDOT Cesar Quiroga, TTI AASHTO ROW & Utilities Subcommittee Conference Austin, TX, May 15-19, 2005.

Slides:



Advertisements
Similar presentations
PPT Presentation of Planned Website Prepared for the Task Force 13 Meeting June 3-5, 2009 San Antonio, Texas.
Advertisements

Making the Case for Metadata at SRS-NSF National Science Foundation Division of Science Resources Statistics Jeri Mulrow, Geetha Srinivasarao, and John.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Asset Management and Sewer Engineering Using GIS Integrated with Document Management in San Francisco Greg Braswell - City & County of San Francisco, Bureau.
Fulton County GIS Overview. Fulton County GIS  Division of Economic & Community Development  Heavy reliance on open- source software  Self-supported.
3-1 Utility Conflict Identification and Management Lesson 3.
June 11, 2008West Virginia GIS Conference 2008 Integration of Mobile GIS Technologies in the West Virginia Department of Environmental Protection Bond.
LOTUS to SharePoint Migration Services. © 2010 Star Knowledge Technology Team Alliance 2 Key Discussion Points Star Knowledge Value Proposition Microsoft.
Dr Gordon Russell, Napier University Unit Data Dictionary 1 Data Dictionary Unit 5.3.
1 Transportation Operations Group Utility Installation Review (UIR) System Internet-Based Utility Permit Implementation.
Chapter 7 UNDERSTANDING AND DESIGNING FORMS. Input Forms: Content and Organization Need for forms Event analysis and forms Relationship between input.
1 Transportation Operations Group Utility Installation Review (UIR) System Internet-Based Utility Permit Implementation.
17-Oct-07 Spatial Engineering, Inc.1 Installation Management Agency Korea Region Office KOROGIS CADD/GIS Interoperability Presented By: Anna Austin, GISP.
Information Systems Development and Acquisition Chapter 8 Jessup & Valacich Instructor: Ramesh Sankaranarayanan.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
System Implementation
INDOT’s Scheduling / Project Management System (SPMS) Vision & Objectives for Next Generation SPMS Mike Jenkins, Indiana DOT Teresa Franklin, Info Tech,
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
Centre for Excellence & Innovation In Infrastructure Delivery.
2010 Construction Contract Standards Training Part 2 TOOLS November 2011.
Enterprise Asset Management
Strategies for Utility Owner Participation in Transportation Projects Strategies for Utility Owner Participation (Course Code) Ch 0-1.
Introduction to Interactive Media 02. The Interactive Media Development Process.
Overview of the Database Development Process
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
Copyright © 2005 Trimble Navigation Ltd. All rights reserved GPS Processing within the Geodatabase.
Project Proposal Interface Design Website Coding Website Testing & Launching Website Maintenance.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
1 Introduction to Database Systems. 2 Database and Database System / A database is a shared collection of logically related data designed to meet the.
1 Chapter 15 Methodology Conceptual Databases Design Transparencies Last Updated: April 2011 By M. Arief
Introduction to Interactive Media The Interactive Media Development Process.
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Web GIS Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 MCS Web GIS Commander is Web-based GIS (Geographical.
Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS.
ArcGIS Data Reviewer: An Introduction
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Matt Eitrem GIS Coordinator City of Ashland Wisconsin.
Use of Administrative Data Seminar on Developing a Programme on Integrated Statistics in support of the Implementation of the SNA for CARICOM countries.
“This presentation is for informational purposes only and may not be incorporated into a contract or agreement.”
Utility Relocation Electronic Document Management System (UREDMS) AASHTO R/W & Utilities Subcommittee Conference San Diego, California April 2010 Utility.
Implementing SiteManager in a non-P/L/C State Dawn E. Scheel, P.E. TxDOT.
TxDOT Utility Installation Review (UIR) System
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
Project Management Inspections and Reviews 1 February.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Making Friends with Your Public Works Department Using GIS Sherry Coatney Intergraph Corporation
Integrating As-Built Policies and GIS Maintenance Procedures
3 Copyright © 2010, Oracle. All rights reserved. Product Data Hub: PIM Functional Training Program Setup Workbench Fundamentals.
RECENT DEVELOPMENT OF SORS METADATA REPOSITORIES FOR FASTER AND MORE TRANSPARENT PRODUCTION PROCESS Work Session on Statistical Metadata 9-11 February.
ISO 191** Overview A “Family” of Standards. Resources ISO Standards Web Page – Technical.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Routing Texas into the Future
Carol Levin, PhD Department of Global Health
Project Management Chapter 3.
BIM EXECUTION PLANNING PROCESS
R.U.M.S. (Right of Way and Utilities Management System) Overview
WVDOT Geospatial Transportation Information
GIS Data Management for SHA’s Bay Restoration Program
BIM EXECUTION PLANNING PROCESS
Asset Management Journey
Txdot field inspection
Presentation transcript:

1 Transportation Operations Group Utility Research at TxDOT Cesar Quiroga, TTI AASHTO ROW & Utilities Subcommittee Conference Austin, TX, May 15-19, 2005

2 Transportation Operations Group Utility Research Plan at TxDOT Strategies to manage and integrate utility data Procedures to optimize utility placement within ROW Strategies to reduce utility relocation delays

3 Transportation Operations Group Utility Research Plan at TxDOT Strategies to manage and integrate utility data Improve utility inventory practices Automate utility data submittals Improve utility conflict information management Procedures to optimize utility placement within ROW Planning tools to determine optimum utility placement Strategies to reduce utility relocation delays Innovative contracting practices Optimize utility reimbursement practices

4 Transportation Operations Group Research Projects No.Description GIS Utility Inventory Platform Feasibility of Utility Corridors in TxDOT ROW Technology to Identify Non-Metallic Pipelines GIS-Based Inventory of Utilities Internet-Based Utility Permitting Process Delays in ROW Acquisition and Utility Relocation Combined Utility Relocation/Highway Construction Standardization of Utility Specifications and Unit Costs Utility Data Integration in Project Development Process CompletedActiveFY 06 – pending RMC approval

5 Transportation Operations Group GIS-Based Inventory of Utilities Project PD: Jesse Cooper, TxDOT Right of Way Division RS: Cesar Quiroga, TTI

6 Transportation Operations Group Why is Research Important? Before Relocation: Quality of SUE deliverables Utility conflict identification and resolution During Relocation: Quality of inspection Post-Relocation: Quality and completeness of as-builts

7 Transportation Operations Group Objectives Update inventory data model Test updated model using sample project Katy Freeway Reconstruction Project Develop GIS database of relocated utilities Develop positional accuracy and deliverable requirements for utility data submittals

8 Transportation Operations Group CodeLogical NameClassType COM_LNECommunication LineCommunicationsLine COM_MHOLCommunication ManholeCommunicationsPoint ELE_LNEElectric LineElectricLine ELE_POLEElectric PoleElectricPoint WAT_FHYDWater HydrantWaterPoint WAT_LNEWater LineWaterLine WAT_MHOLWater ManholeWaterPoint WAT_VLVWater ValveWaterPoint

9 Transportation Operations Group Primary key ArcGIS Reserved Fields GAIP Attributes Field Attributes

10 Transportation Operations Group Data Collection Protocols Conventional surveying (SDMS) GPS-based surveying (Trimble) SDMS: Survey Data Management System AASHTO product Several states, including Texas Feature codes, data tags, and sequences

11 Transportation Operations Group AC:SS PN: 100 FE:WAT_LNE FG:1 SH:5 GM:P HZ: VT: DS:100 ID:SAWS TY:WATER MAIN I0:PVC DI:18 DP:3 CC:NONE SP:DIRECT BURIED CR:OPEN TRENCH ES:CONCRETE CAP TW:NO WT:NO CM: I Material, ;ASBESTOS CEMENT ;CAST IRON ;CPVC ;DUCTILE IRON ;FIBERGLASS ;HDPE ;PVC ;REINFORCED CONCRETE ;STEEL ;OTHER

12 Transportation Operations Group Trimble Feature Code Library Pathfinder Office 2.7 Version

13 Transportation Operations Group

14 Transportation Operations Group Internet-Based Utility Permitting Process Project PD: Joe Graff, TxDOT Maintenance Division RS: Cesar Quiroga, TTI

15 Transportation Operations Group Why is Research Important? 10,000+ utility permits per year Paper and labor intensive Incomplete documentation Scaled schematic 20% ROW line or centerline depiction 21% Control section and mile point data 10% Reference marker and offset data 5% Variability in drawing standards Utility maps not up-to-date Institutional memory at TxDOT

16 Transportation Operations Group System Implementation Oracle database Interactive ArcSDE/ArcIMS-based mapping Secure 128-bit SSL encryption PDF file conversion Utility company user management TxDOT user management

17 Transportation Operations Group Workflow Diagram Permitting Pre-construction Construction Post-construction Utility inventory update

18 Transportation Operations Group Sample Interface Screens

19 Transportation Operations Group

20 Transportation Operations Group

21 Transportation Operations Group Current Activities Testing and debugging Interactive online help system System management and reporting System documentation Training materials

22 Transportation Operations Group Standardization of Utility Specifications and Unit Costs Project PD: Jeff Masek, CCA, Houston District RS: Cesar Quiroga, TTI

23 Transportation Operations Group Why is Research Important? Utility Accommodation Rules (UAR) Cover basic requirements No standard specs for utility installations Many special specs and provisions Utility relocation costs Utility relocation cost estimates No standardized cost data submittal Difficult to assess validity of cost data

24 Transportation Operations Group Objectives Review specifications for utility installations Review utility relocation cost documentation Develop recommendations for specifications and changes to the UAR Develop methodology for estimating costs

25 Transportation Operations Group Cost Estimation Approaches ItemQtyUnit Cost MatLabEquipTransTotal 1Q1Q1 u1u1 M1M1 L1L1 E1E1 T1T1 C1C1 2Q2Q2 u2u2 M2M2 L2L2 E2E2 T2T2 C2C2 3Q3Q3 u3u3 M3M3 L3L3 E3E3 T3T3 C3C3 4Q4Q4 u4u4 M4M4 L4L4 E4E4 T4T4 C4C4 5Q5Q5 u5u5 M5M5 L5L5 E5E5 T5T5 C5C5 MLETy Cost Categories

26 Transportation Operations Group Category and Activity Variability Names Level of detail 9 subcategories within overhead … 3 subcategories within materials and supplies … Design, Construction, Removal Inconsistent use Activities treated as categories Categories treated as activities

27 Transportation Operations Group Storm Sewer

28 Transportation Operations Group Water Main, Sanitary Sewer

29 Transportation Operations Group Integration of Utility Data in the Project Development Process Project FY 06 – pending RMC approval PD: Gary Ray, Houston District

30 Transportation Operations Group Why is Research Important? Utility relocation on critical path Earlier utility depiction for design Absence of utility conflict data standard Multiple data management systems Incompatibilities Data format and content limitations Data access limitations Delays, added project costs, liabilities

31 Transportation Operations Group

32 Transportation Operations Group Sample Project Right of Way Information System (ROWIS) Utility coordinator web site Conflict data in Excel and Word 1,400 utility conflict locations 40 utility companies 300 contacts Microstation schematics Meeting schedules Other information Incompatible Systems!

33 Transportation Operations Group Research Objectives Prototype Utility Conflict Data Management System Prototype Programmer Guide Prototype User Guide and Educational Materials Draft Standard and Specifications

34 Transportation Operations Group Additional Information Jesse Cooper, TxDOT (512) Joe Graff, TxDOT (512) Jeff Masek, TxDOT (713) Gary Ray, TxDOT (713) Cesar Quiroga, TTI (210)