Federal Fund Exchange Training. What is the Federal Fund Exchange? This is a voluntary program in which a Local Public Agency can trade its federal obligation.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
MnDOT Metro District State Aid Construction Thursday February 19 th, 2015.
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
District Information Session For the American Recovery and Reinvestment Act.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Basics of County Offices Highway Department County Officials Academy.
Moving Ahead for Progress in the 21 st Century (MAP-21) – ROW Impacts Dianna Nausley, HQ RES Assistant Program Administrator Washington State Department.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Small City Funding Opportunities Transportation Improvement Board June 2010.
David C. Larson CTEP Project Engineer Engineering Conference Missoula.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Single Point of Contact (SPOC) MTC Workshop PRESENTED BY: Sylvia Fung District 4 Local Assistance September 2014.
PROJECT AUTHORIZATIONS September 24, 2014 by Peter Anderson HQ Area Engineer – Districts 1 and 4 & Ephrem Meharena i- Team, Caltrans District 4 + VTA.
Overview of the Federal Aid Process for Transportation Projects.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
2012 FTIP/FSTIP Workshop Project Selection Process.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
NDACo Legislative Wrap-up Funding for Non-Oil Producing County Highways and Bridges Jason Benson Cass County Engineer.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Trail Funding Sources & General Information
Federal Highway Administration Emergency Relief (ER) Program Brian Hogge Field Operations Team Leader July 2013.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
Public Disaster Assistance Grant Program Briefing Severe Storms June 23-30, 2015 June 23-30, 2015.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
ROW, AASHTO OKLAHOMA CITY 2009 MELVYN R. COOPER REALTY OFFICER South Carolina Nonconforming Sign Upgrade/Removal (Pilot) Project.
Nicole Fox, P.E. Iowa DOT – Office of Local Systems Secondary Roads Engineer New County Supervisor Information “The Importance of the County Engineer”
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
June 2012 Washington State Transportation Improvement Board Small City Funding Programs.
LEVEE PERMIT SUBMITTAL & REVIEW PROCESS. Federal Law CODE OF FEDERAL REGULATIONS TITLE CHAPTER II -- CORPS OF ENGINEERS, DEPT OF THE ARMY, PART.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
WYDOT CLEARING UTILITIES Keri Bohlmann, P.E. Utilities & DSS Supervisor.
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
Winton Emmett, Chief Project Implementation North January, 2016 Division of Local Assistance John Hoole, Chief Project Implementation South.
Nathan Pryor Eileen Yazzie February 17, 2009 American Recovery and Reinvestment Act of 2009 Working Group Meeting #2.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
Change Orders on Federal-aid Highway Construction Projects Bren George-Nwabugwu (FHWA) ; (317)
PROJECT DELIVERY TEAM Design, ITS and ADHS Construction, Maintenance and Asset Management Team Leader, Pavement and Materials Safety, Emergency Relief.
WEST VIRGINIA INDUSTRIAL ACCESS ROAD PROGRAM West Virginia Economic Development Council January 27, 2016.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Community Crossings Matching Grant Fund Program Kathy Eaton-McKalip
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
State Transportation Bond Funds
Force Accounts.
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
State Transportation Bond Funds
Federal Fund Exchange Training
State Transportation Bond Funds
Presentation transcript:

Federal Fund Exchange Training

What is the Federal Fund Exchange? This is a voluntary program in which a Local Public Agency can trade its federal obligation authority with KDOT or another local agency in exchange for state funds. State funds are paid on a reimbursement basis as the LPA incurs costs.

What Are the Benefits of the Fund Exchange? Eliminates costly and time-consuming requirements of federal-aid projects. – Reduced environmental documentation – Plans development to meet local needs – Inspection to meet local needs – Avoid many restrictive federal provisions – Buy America – Davis-Bacon – DBE – Pipe Policy

What Are the Benefits of the Fund Exchange? More flexibility in selection of projects – Projects can be on non-federal aid routes – Bridges don’t have to meet eligibility requirements – Much wider range of scopes allowed

“Transportation Project” Road construction, reconstruction, rehabilitation Pavement preservation (overlay, mill/overlay, chip/seal, pvt. patching, crack sealing) Purchase of aggregate used exclusively on a specific section of road Safety improvement (signing, pvt. marking, roadside obstacles, intersection, etc.)

“Transportation Project” Bridge construction/replacement Bridge rehabilitation, repair Bridge removal Low-water crossing

“Transportation Project” Erosion protection in ditches or around drainage structures. Const. of sidewalks, ADA ramps, pedestrian signals. Construction of trails. Curb & Gutter repair or replacement. Storm sewer repairs.

Allowable Use of State Funds All phases of project are eligible. LPA determines procedures, criteria and standards. – Must meet applicable laws, regulations, accepted engineering practices. LPA may “stockpile” funds for up to 3 years.

FHWAKDOTCity/County Federal funds are made available to KDOT through FHWA. KDOT shares a portion of federal funds with cities and counties. LPA develops project. KDOT lets/administers project with federal/local funds Current Fed.-Aid Process

How the Fund Exchange Works FHWAKDOTCity/County Federal funds are made available to KDOT through FHWA. KDOT shares a portion of federal funds with cities and counties. LPA requests KDOT exchange funds. KDOT agrees to provide LPA $0.90 state funds per $1.00 fed.

How the Fund Exchange Works KDOTCity/County KDOT reimburses LPA up to maximum amount of total exchange. LPA lets/administers project(s) themselves and pays contractor/suppliers. LPA submits request for reimbursement to KDOT along with appropriate documentation of expenditure.

Fed. Funds Available for Exchange 5-Year Plan funds (STP and BR) – Counties: $34 million (FFY 2010) – Cities: $13 million (FFY 2010) Minus Federal-Aid Local Bridge Program. – Approx. $8 million annually. Minus Local Bridge Inspection Compliance Effort. – Approx. $5 million annually. – Through 2014.

Implementation Plan Fall 2010 – Federal Fiscal Year All counties Cities over 5,000 not in metro area. Details – Federal funding uncertainty. – Current fund balances – counties. – Fund distribution to cities. – Ongoing project commitments.

“5-Year Plan Letter” No longer 5-year plan update Letter will: – Tell you how many fed $ available for year – Give you option of either programming fed-aid project or requesting exchange. – Provide deadline for informing us of decision.

What do I need to do to exchange my federal funds?

Understand the Rules

County Name or City Name

Amount City/County wants to exchange

Agency Contact and contact information

Must be signed by authorized representative for agency, not a consultant

Must be dated

List of Projects 2 per page, attach as many sheets as needed

1 st Project

2nd Project

Brief description of project location

Describe the Scope of the work to be done

Estimated construction start date.

Estimated costs for only those cost for which you will request reimbursement

Design cost estimates

Right of Way cost estimates

Utility adjustment cost estimates

Construction cost estimates

Inspection cost estimates

Total Estimated Costs

Request is submitted to KDOT, now what?

KDOT reviews request, determines if projects meet program requirements

Reimbursement Process

County Name City Name

Date of Request

Description of work and location

Project name as decided by LPA

Same agreement number as in agreement

Name of Firm or Supplier

Firm/Supplier Invoice Number

Brief description of services/materials

Amount requested to be reimbursed

KDOT requests amounts to be at least $1,000 per request

Invoices must be attached in order to process payments

Must be signed by authorized representative for agency, not a consultant

Statutes, Regulations & Engineering Practices

When do I need to hire an engineer? “A Study of the Duties of a County Engineer in the State of Kansas” By: Thomas Mulinazzi, KU Chaitanya Gampa, KU Eugene Russell, KSU

Work Requiring Engineer Establishing design standards Roadway and crossroad culvert design Bridge (structural) design Sizing crossroad culverts and bridges Determining needed repairs on bridges & culverts Bridge inspection & load rating Drainage and flooding studies Computing drainage areas and runoff rates

Work Requiring Engineer Prepare state & federal permit applications Prepare construction specifications Construction Inspection Traffic control/signage design and review

Work That Does Not Require Engineer Project cost estimates Right of way acquisition Utility relocations Advertisement and contract administration Manage project for LPA Maintenance type projects

Work That Does Not Require Engineer Pavement preservation w/o geometric, safety, drainage or other changes – Overlay, mill/overlay – Chip and seal – Pavement patching – Crack sealing – Placement of aggregate Replace deteriorated curb & gutter Storm sewer repair to restore function Installation of erosion protection measures in ditch or at drainage structure outlet

K.S.A Estimates, plans and specifications for bridges and culverts; employment of engineer. Whenever the board of county commissioners... Deem it necessary to repair any county bridge or culvert it shall... direct the county engineer to prepare complete plans for the same,... Provided, that the board may employ an engineer to act in conjunction with the county engineer in preparing plans, specifications, estimates, and in superintending the construction of any bridge or culvert work: Provided, however, That no engineer shall be employed by the board to furnish or to prepare plans, specifications or estimates for any county or township bridge or culvert work, or to supervise the construction of any such work, who is in the employ of or represents any bridge company, bridge firm, or bridge contractor...

Design Criteria General Road Design – AASHTO, NACE, APWA – Depends on scope of work Bridge Design – AASHTO

Bridges NBI – All bridges on public roads must be inspected. – New or altered bridge must be on inventory in 180 days. K.S.A – KDOT review and approve plans for bridges over $200,000

K.S.A Approval of plans by county engineer or state engineer. All plans for the construction or repair of highway bridges and culverts, the estimated cost of which does not exceed the sum of $200,000, shall be submitted to the county engineer for approval. If the estimated cost thereof exceeds the sum of $200,000, such plans and estimates, before final adoption, shall be submitted to the state transportation engineer for approval...

Surveying Minimum Standards for the Practice of Land Surveying (K.A.R ) Statutes regarding survey practices and protection of cornerstones and monuments

Environmental - Permits NEPA documentation not required Permits may be needed – Division of Water Resources – Corps of Engineers – NPDES – Others?

Right of Way Acquisition Uniform Relocation Assistance and Real Property Acquisition Act K.S.A. Chapter 26

Contracts Method of contracting shall meet appropriate Kansas statutory requirements and procedures. Work with your attorney or counselor.