Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
CDOT WATER QUALITY PROGRAM
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Preventing Storm Water Pollution: What We Can Do Question and Answer Game PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
What is NPDES? “National Pollutant Discharge Elimination System”
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Building Green in Bowling Green
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
BEING READY FOR AN INSPECTION No matter when the inspector shows up.
Reasonable and Prudent Practices For Stabilization (RAPPS) of Oil and Gas Construction Sites.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Applying for the VT Multi-Sector General Permit
Sanitary Engineering Lecture 16
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Erosion Control on Construction Sites David Athey, PE Deputy Public Works Director, Engineering City of Atascadero.
Office of Sustainability Presented by Sofia Habity EROSION AND SEDIMENTATION CONTROL.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
MDOT Storm Water Management Plan Module 2: Best Management Practices
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
An Overview of our Community’s Stormwater Management Program
1 Module 2: Enhanced Systems When it’s more than a straight pipe from the catch basin to the waterbody Stormwater System Maintenance: A 4-Part Workshop.
Nonfarm Erosion Control
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Part 5 - Good Housekeeping
1 Module 3: Typical Roadway Drainage Where it goes in Where it comes out Stormwater System Maintenance: A 4-Part Workshop Series.
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
View of well and location from the northern slope. According to a company representative, the location size has not been reduced because the well still.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
City of Clarksville Storm Water Management Manual Revisions 2014.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Construction Land Disturbance Pollution Control
Storm Water Pollution Prevention Plan Development
BEST MANAGEMENT PRACTICES (BMP’S)
EPA Public Meeting Dallas, Texas May 10, 2005
INDOT Storm Water Management
MS4 OVERVIEW 2015.
Presentation transcript:

Stormwater Management

Outline Background Colorado Regulatory Requirements Stormwater Management Plans (SWMPs) Best Management Practices (BMPs) Questions

Background In 1992, the State of Colorado stormwater regulation went into effect to control municipal and industrial stormwater discharges, based on EPA regulations. The State regulation(5 CCR 1002-61) covers discharges from specific types of industries including construction sites, and storm sewer systems for certain municipalities. In Colorado, the program is under the Colorado Department of Public Health &Environment. The Colorado program is referred to as the Colorado Discharge Permit System (CDPS), and regulated stormwater discharges from construction activities are covered under the CDPS General Permit for Stormwater Discharges Associated with Construction Activities (the Stormwater Construction Permit)

Background June 30, 2005 – The Colorado Water Quality Control Division extends permitting for stormwater discharges from construction activities associated with small construction activity (those that disturb between one and five acres) Stormwater permitting was previously required for all sites with disturbance in excess of five acres

Colorado Regulatory Requirements Stormwater Discharges are Regulated by the CDPHE Water Quality Control Division Stormwater permit coverage is required for all construction activities that disturb one acre or greater Coverage is also required for construction that is part of a larger common plan of development Oil & gas activities covered include construction of well pads, road, pipelines, pumping stations, etc.

Colorado Regulatory Requirements (cont.) Permit coverage for construction activities is obtained under CDPHE’s Construction General Permit Application for coverage must be submitted at least 10 days prior to the start of construction A Stormwater Management Plan (SWMP) has to be prepared at the time the application is submitted Implementation of SWMP must occur immediately upon initiation of construction

Colorado Regulatory Requirements (cont.) CDPHE Permit Requires Routine Self-Inspections Active Sites (Disturbed but Not Seeded) Must be inspected at least once every 14 days and after any precipitation or snowfall event that causes erosion Completed Sites (Seeded but not Stabilized) Must be inspected at least once every month Stabilized Sites (at least 70% vegetation established) Inspections no longer required Inspections are not required when snow cover exists over the entire site for an extended period and melting conditions do not exist Inspection records must be maintained for a period of 3 years and must be made available to CDPHE/EPA upon request

Colorado Regulatory Requirements (cont.) CDPHE Allows Some Flexibility in Defining the Area to be Covered by a Stormwater Permit Single site with disturbance greater than 1 acre Multiple sites within a common plan of development Interpreted to be sites up to ¼ mile apart and/or having the area between the sites disturbed

Colorado Regulatory Requirements (cont.) Final Stabilization as Applied to Construction Construction has been completed and disturbed areas have been built on, paved, or at least 70% of pre-disturbance vegetation has been established or equivalent permanent, physical erosion reduction methods have been employed Stabilized unpaved surfaces – Dirt road surfaces and portions of pads that cannot be revegetated due to operational necessity are considered finally stabilized as long as they are prepared as to prevent ongoing erosion issues

Stormwater Management Plans (SWMPs) SWMP Goal to describe appropriate controls and measures to improve water quality by reducing pollutants in stormwater discharges and ensure compliance with the requirements of the stormwater permit. The SWMP must be completed and implemented at the time the project breaks ground, and revised if necessary as construction proceeds to accurately reflect the conditions and practices at the site.

Stormwater Management Plans (Cont.) SWMP Requirements General Requirements Prepared in accordance with good engineering, hydrologic and pollution control practices Identifies Best Management Practices (BMPs) Identifies potential sources of pollution associated with construction activity Construction operations must implement the provisions of the SWMP

Stormwater Management Plans (Cont.) SWMP Requirements (cont.) Narrative Site Description Describe construction activity Sequence for major activities Estimates of total area of site and area that will be disturbed Estimate of runoff coefficient of the site before and after construction Location of other potential pollution sources Location and description of non-stormwater components of discharge (springs, landscape irrigation return, etc.) Name and description of receiving water(s) or municipal storm sewer

Stormwater Management Plans (Cont.) SWMP Requirements (cont.) Site Map Construction site boundaries Areas of soil disturbance Areas of cut and fill Areas used for storage of building materials, soils or wastes Location of any dedicated batch plants Location of major erosion control facilities or structures Surface waters Boundaries of 100-year flood plains

Stormwater Management Plans (Cont.) SWMP Requirements (cont.) BMPs and Other Controls Description of appropriate controls and measures that will be implemented Structural Practices Non-Structural Practices Identify procedures to control spills, etc. (coordinate with SPCC plans) Identify other measures to control pollutants (waste disposal, limiting off-site soil tracking, etc.) Site stabilization methods Inspection and maintenance procedures

Stormwater Management Plans (Cont.) SWMP Requirements (cont.) SWMP Revision The SWMP must be modified to accurately reflect the actual field conditions and BMPs used SWMP Administration The SWMP must be on site during active construction and site inspections and available to those directly responsible for installing an maintaining BMPs

Best Management Practices (BMPs) Reflect the measures taken to control stormwater as dictated by the SWMP. Proper selection and implementation of BMPs are the keys to an effective stormwater management program Common sense approach There is no one right answer Often involves trial and error to find what works best Describe a wide range of structural treatment processes, pollution prevention practices, schedules of activities, prohibition on practices, and other management practices

Best Management Practices (cont.) BMPs fall into 2 general categories Nonstructural – Operational/managerial techniques, such as Phasing of operations Housekeeping practices Spill prevention Preventive maintenance Preserving natural vegetation Structural – Physical processes Erosion Control BMPs – Practices to prevent the erosion of soil Sediment Control BMPs – Practices to remove sediment from runoff

BMP Examples

Silt Fence The silt fence has been installed correctly The silt fence needs to be repaired and BMPs should not be placed in drainage waters of the US

Straw Bales/Waddles This technique utilizes bound straw bales to filter sediment from runoff of small areas Limitations Filters sheet flow from small drainage areas Short term use Decomposes and/or consumed by livestock Removal of stakes will be necessary after stabilization is complete Installation Embed into trench Anchor with 2 stakes (metal or wood) Compact backfill on the upgradient side Use at outfall points from sediment ponds, diversion ditches, turnouts, etc.

Straw Bales/Waddles

Sediment Pond (Trap) This technique uses a pond to hold sediment-laden water so that sediment can settle and water is absorbed into the soil. Sediment traps are useful for construction sites where excessive runoff will need to be captured and filtered. Limitations Size of surrounding area Require regular maintenance due to sediment build-up Installation Excavate trap or basin within area where runoff may be directed toward Sideslopes should be machine compacted Sideslopes should be 2:1 or flatter Volume of trap should handle runoff from 2-year storm event Construct spillway or outfall structure with rock, straw bale, or other appropriate BMP

Sediment Pond Vertical and steep slopes should be avoided as these will result in erosion

Diversion Ditch This technique is useful to filter sediment from concentrated flows and/or runoff of moderate grades and larger drainage areas. Additionally, rock berms may be utilized to reduce velocity of flows within diversion ditches Limitations Availability and/or cost of rock Difficult to remove after construction Require regular maintenance due to sediment build-u Installation Use medium to large diameter rock May secure rock within woven wire sheathing (not required) Berm side slopes should be 3:1 or flatter Top of berm should be a minimum of 2 feet wide

Diversion Ditch

Geotextiles/Erosion Blankets Geotextiles and erosion blankets are typically a porous fabric constructed of woven fibers. They are useful for stabilization and preventing erosion on slopes, especially adjacent to streams Limitations Decompose Effectiveness depends on proper installation Expensive Installation Select appropriate fabric type for necessary purpose Remove any protruding rocks and smooth soil prior to installation Fabric needs to be entrenched into the soil Anchor fabric securely Apply seed prior to fabric installation for final stabilization of sites Follow manufacturer’s recommendations for installation

Erosion Control Blanket

Surface Roughening (Tracking) This technique utilizes the horizontal grooves created by tracks of construction equipment to reduce runoff flow velocities. Tracks are established on the slopes perpendicular to water flow. Limitations Not for use on rocky slopes May cause soil compaction which limits vegetation re-growth Roughening may have to be re-established if lost due to heavy sheet flow runoff Installation Tracking should be done up and down the slope, not across the slope

Surface Roughening

Road-Side Ditches This technique requires construction channels parallel to access roads. The ditches convey concentrated runoff of surface water from roads and surround areas to a stabilized area Limitations Erosion occurring within channel Channel does not necessarily filter sediment from runoff Installation Excavate channel along roadside to a width and depth that can handle expected flows Slope channels so that water velocities do not cause excessive erosion Install BMPs into the ditches to slow water velocities and collect sediment

Road-Side Ditches

Berm/Water Bar This technique may be used to collect runoff from undisturbed areas and divert around construction activity. Additionally, berms can be used to limit the accumulation of water volume by diverting runoff from construction area into a stabilized outlet (i.e. rundown, sediment pond) or a well-vegetated area Limitations Not for use on concentrated flows May cause concentrated flows from sheet flow Requires vegetative cover or other filter at discharge point Installation Pile and compact soil (berms need to be compacted to hold water, prevent blow-outs and minimize vandalism/intention breaches) The side slopes should be 2:1 or flatter Increase the frequency of water bars with an increased slope Discharge should enter a well-vegetated cover (water bars) or a stabilized out (a constructed sediment pond)

Water Bar

Questions ?