PHMSA Perspectives Construction Process & Standards

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
Materials and Joining March 2005 R&D Forum David Horsley TransCanada Pipelines Limited.
Pipeline Personnel Qualification
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
Bill Bruce 30 June 2010 Appendix B Revisions for Twenty-First Edition of API 1104 Proposed Letter Ballots.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Gas Transmission Pipelines
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Office of Pipeline Safety Kenneth Y. Lee Engineering & Research.
High Consequence Areas & Pipeline Assessment Intervals –Is there a need for change? Terry Boss Sr. VP Environment Safety and Operations Interstate Natural.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Update Kenneth Y. Lee Engineering & Research Division
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
Tim Haeberle API SC Winter Meeting
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Technical Advisory Committee December 2012 Fitness for Service.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
1 Research, Development & Demonstration for Pipeline Operations Funding Overview & Key Projects Paul P. Gustilo Southwest Gas Corporation
1of 27 GUSSET PLATE EVALUATION Tom Macioce, P.E. Chief Bridge Engineer April 2009 PennDOT Load Rating of Gusset Plates.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Rulemakings. Change in Derating Factor for PA-11 From.32 to.40.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Update on the API Work Group Activities on Pipe Markings.
Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
An Industry Response to the Expected Control Room Management Rule Western Regional Gas Conference Daron Moore – El Paso Pipeline Group August 25, 2009.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview of Integrity Verification Process (IVP) Workshop Held.
1 Comparative Study: EN – ASME VIII Workshop on the Pressure Equipment Directive Warsaw, June, 2004 Dr. Reinhard Preiss TÜV Austria Krugerstrasse.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
PIPELINE SPECIFICATIONS
Consequence Analysis: A More Comprehensive Proposed Regulatory Approach Western Regional Gas Conference Tempe, Arizona Daron Moore August 19, 2014.
WHAT DOES IT MEAN FOR YOUR MAOP? REAUTHORIZATION, SAN BRUNO, AND PHMSA’S ADVISORY BULLETIN.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Verification of Records Linda Daugherty – Dep Associate.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Transmission 2012 Annual Reports Joint Advisory Committees.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable.
Technology … Can It Save Us? - Toolbelt Evolution - J. A. Drake, P.E. Director, Technical Serivces Duke Energy Gas Transmission.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Cost effective while providing customer focused solutions.
INGAA Quality Management Systems White Paper Supporting Pipeline Construction.
Service is the difference MEA Roundtable October 30, 2007.
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
PIPELINE SPECIFICATIONS
4th Annual Construction Law Summit
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
AGA Positions on Current PHMSA Rulemakings
API STANDARD 1104 Welding of Pipelines and Related Facilities
PIPELINE SPECIFICATIONS
Gas Transmission Pipelines
Presentation transcript:

PHMSA Perspectives Construction Process & Standards API – AGA Joint Committee Oil & Gas Pipeline Welding Practices New Orleans, LA Steve Nanney January 27, 2010

Overview Regulatory Overview of 2009/2010 PHMSA Expectations PHMSA Actions to Date API 5L Actions to Date Construction Issues - Summary API – Needed Actions Challenges Looking Ahead PHMSA Links

Regulatory Overview of 2009/2010 Editorial Rule – Published 11/30/09 Distribution IMP – Published 12/4/09 Control Room Management – Published 12/7/09 One Rule - Summer 2010 Standards Update - Summer 2010 Miscellaneous Rule – Summer 2010 Excavation Damage – To Be Determined (TBD) Low Stress Integrated Insp. – TBD

PHMSA Expectations Hold safety paramount Protect the public and environment Follow the regulations Update standards - reflective of issues Focus on people and processes Quality Management Systems

PHMSA Actions to Date April 23, 2009: PHMSA New Construction Workshop May 14, 2009: ADB: Potential Low and Variable Yield and Tensile Strength & Chemical Composition Properties in High Strength Line Pipe June 5, 2009: PHMSA Letter to Industry Trade Associations June 22, 2009: API Standards Conference Summer 2009: Letters to Alternative MAOP SP holders on Low Strength Pipe Spring/Fall 2009: Worked with Operators to identify low strength pipe & remove August 2009: Construction web site established November 2009: Weld in service rupture due to alignment and welding January 2010: Weld in service leak due to alignment and welding

API 5L - Actions to Date API 5L – sub-committee proposed changes for “low strength” pipe issues QA management system for the supplying steel and rolling mill (8.3.1) Coil/plate rolling practice shall be controlled to ensure mechanical properties are uniform (8.3.7) Qualifications in hot rolling practice deviations (8.3.8) Standard sampling locations along plate or coil length according to documented procedures (10.2.3.2) Modifications to retest procedures (10.2.12.2)

API 5L Actions to Date - continued Manufacturing Procedure Specification – new (B.3) Inspection and Test Plan – required (B.4) Manufacturing Procedure Qualification Tests – mechanical tests (B.5.3) Qualification consider assessment of coil/plate tensile property variability and coil/plate to pipe strength changes Purchaser shall be notified of all plate/coil/pipe that do not meet the initial defined rolling practices control parameters, but have been re-qualified (B5.6 and B5.7)

API Actions to Date API 5L – subcommittee – co-chairs and members Great effort to improve API 5L standards API 5L – sub-committee proposed changes for “low strength” pipe Needs API Membership approvals PHMSA is appreciative of Efforts “Proposed” Revisions to API 5L need timely approvals

Construction Issues - Summary Topic Occurrences Coating* 117 Welding* 87 Excavation 20 Nondestructive testing Pipe material* 12 Bending 9 Lowering in* 7 Hydrotesting 4 Design 3 Other 8

Construction Issues Low Strength Pipe Coating Adhesion

Construction Issues Repair Weld Cracking Issues

Construction Issues Pipe bevel ends and alignment – high/low

Construction Issues Welding, NDT, Transitions, & Alignment Cut Induction Bends

Construction Issues Alignment – does it meet standards for API 1104?

Construction Issues Alignment – does it meet standards for API 1104?

Construction Issues Weld Failures – Transition and Cracking Pipe Sizes 42-inch 36-inch 30-inch 20-inch

API 1104 – Needed Actions Appendix A – Guidance for ECA Input Parameters for ECA Defined steps in defining Defect Acceptance Criteria Pipeline stress analysis – using field construction and operational extremes for procedures WPQ – Essential Variables Defect Acceptance Criteria UT – verification procedures Procedures – for field usage Training

Joint API – Needed Actions Appendix A - Weld Procedure – Essential Variables Change in the grade or manufacturing process of the pipe material or a change in the chemical composition or processing – Different- steel manufacturers and hot rolling practices Major change in joint design – (API 1104 & API 5L) Pipe Bevel Alignment – usage of API 5L and/or ASME B31.8 or 31.4 criteria - (API 1104 & API 5L)

Joint API – Needed Actions Weld Tolerances – (API 1104 and API 5L) Pipe, diameter of body and pipe ends - API 5L Bevel Design – API 1104 & ASME B31.8 and B31.4 Alignment – API 1104 Varying/uneven wall thickness (ASME B31.4 and B31.8) Bends – cut within bend – ovality/out-of-roundness criteria Repair welding – (API 1104) Preheat Welding procedures Post heat NDT standards

Transition Weld Failures Alignment – bevel and uneven wall thickness Ovality and out-of-roundness Lateral displacement during construction Soil settlement Overburden loads Pipeline right-of-way topography Weld stress concentration factor (SCF) Internal pressure

Transition Weld Failures Alignment – does it meet standards for API 1104?

Challenges Industry People Processes Putting safety first – in practice Establishing standards that address all issues Recognize that large diameter, higher grade material with higher operating pressures need “updated and some new” practices People Getting people to consistently do it right Finding and retaining appropriate skill sets Achieving sustained improvements Processes Establishing proper procedures Ensuring a seamless transition between contractors and owners Contracting methods

Looking Ahead PHMSA construction inspection focus will continue Expect increased use of enforcement actions on all construction issues – 72%SMYS and 80%SMYS MAOP Rule Construction OQ – required by MAOP Rule (If planning project, contact PHMSA Region for details.) May need to explore other options: More effective regulations and standards Timely enforcement actions Operator qualification for construction

PHMSA – links Pipeline Safety Guidance – Advisory Bulletins, Low Strength Pipe Guidelines, MAOP Rule FAQs http://www.phmsa.dot.gov/pipeline/guidance Construction Workshop http://primis.phmsa.dot.gov/construction/index.htm MAOP Rule – FAQs http://primis.phmsa.dot.gov/maop/index.htm Special Permits – FAQs http://primis.phmsa.dot.gov/classloc/faqs.htm

QUESTIONS

E-mail: steve.nanney@dot.gov Thank you Steve Nanney Office: 713-272-2855 Mob: 713-628-7479 E-mail: steve.nanney@dot.gov