Incident Management System Process Flow RESTRICTED All Staff and Contractors within scope of HSSE MS Line Manager and Contract Holders (Designated Incident.

Slides:



Advertisements
Similar presentations
Background Presenters Work done in preparation for WHS changes
Advertisements

Contract CloseOut.
Major Incident Process
The key steps in an annual cycle Produce the annual work programme Create an annual Internal Audit plan for approval by the Audit Committee, typically.
SIEP HSE Management System
Bomb Threat Training Crime Prevention Office University of Miami Police Department 5665 Ponce De Leon Boulevard Coral Gables, FL
Harassment, Intimidation, and Bullying Policies and Legislation
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Follow Emergency Procedures. Aims – Follow Emergency procedures. Objectives – To understand the definitions of accidents and incidents. Know the accident.
Image zone Incident Reporting Instruction – Technical Update.
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
Business Continuity Check List PageOne. - Why Does Your Business Need A Continuity Checklist? Should the unexpected occur, your business will be able.
Risk Assessment – An Essential Standard
Incident Reporting Procedure
Background  The new system has been developed by SUNY System Administration and is part of SUNY's five-year technology plan.  Features and Benefits.
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Main contractor name – LTI# - Date of incident Incident details Contractor name/number: (subcontractor-contractor- PDO)/CXXXXXX Incident owner: Name /
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
SERVICE MANAGER 9.2 CHANGE PRESENTATION JUNE 2011.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Penny Shields. Team Leader Manages and is responsible for approx 10 employees Front-line manager Reports to Executive Manager for business line.
PII BREACH MANAGEMENT Army Privacy Office 7701 Telegraph Road Casey Building, Room 144 Alexandria, VA DSN: Fax:
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
Developing Plans and Procedures
NEW FOR 2009 Faster, Easier, Friendlier. Before you start Any student, staff, or faculty member can file an accident/incident report. Accident reporting.
Significant Events. Significant Event Analysis (SEA) An SEA is concerned with investigating any occurrence which are identified by any practice members.
Internal environmental audit procedure Purpose: To ensure that the environmental management system is used and is effective Scope: The entire environmental.
EliminationSubstitutionEngineeringAdministrationPPE Incident Reporting.
Main contractor name – LTI# - Date of incident Incident details PDO directorate/dept: (e.g. OSD _OSO_OSO4) Contractor name/number : (subcontractor-contractor-PDO)/CXXXXXX.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
As children enter custody in the Northeast Region, the placement specialists will discuss children who pose potential risk behaviors in the area of.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
EGEE is a project funded by the European Union under contract IST NA3 Execution Plan Malcolm Atkinson Director of the National e-Science Centre.
7 Day Self Assessment Tool (7 Day SAT) March 2016 Survey - User Guide v4 (March 2016)
Response to an Emergency Training for 211 Staff in Ontario Updated September
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
Bomb Threat Training Crime Prevention Office
Toolbox Intent – Presentation leaders’ notes
Incident Reporting And Investigation Program
Canfor Incident Reporting
Administration of a FIDIC Contract - Project Control
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Accident and Incident Investigation
Quarry Operator and Contractor Code of Conduct
Module 8 Prepare management procedures
Bomb Threat Training Crime Prevention Office
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Unsafe Condition/ Near Miss – Electrical Safety (1)
Incident Reporting And Investigation Program
CONTRACTOR HSE MANAGEMENT
Incident details Contractor name/number : (subcontractor-contractor-PDO)/CXXXXXX Incident owner : Name / Ref Ind Location : Area / unit - (road/yard/station/rig/hoist/plant.
PDO Second Alert Date: Incident: LTI What happened?
Health, Safety & Environmental Management System 2018
Level 1 HSE M S Audit Insert Title here Closing Presentation
Always use the correct tools for the job
Always report Near Misses
Open access in REF – Planning Workshop
Always intervene an unsafe act
ANALYSIS PATIENT SAFETY REPORT Pharmacy name Month / Year
Near Miss During Cargo Operations
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Always follow NORM protocol!
Directions for this Template
CR-GR-HSE-801 Management of HSE Events and Return on Experience
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

Incident Management System Process Flow RESTRICTED All Staff and Contractors within scope of HSSE MS Line Manager and Contract Holders (Designated Incident Owners ) HSSE Support (S&D) HSSE ManagerExecutive Team Member Notification (verbal, phone, or ) as soon as possible and within the guidelines set in the incident notification table Appendix 3: Requirements for HSSE Incident Reporting, Investigation, Review, and Learning. Activate Emergency Response Procedures Notification and Reporting 1 Incident or Near Miss Occurs Designated First Reporter to submit First Report (Appendix 4) to HSSE S&D within 24 HRS. On Going Emergency ? YES NO HSSE S&D receives First Report and Inputs details into IMIS within 24HRS Not later than 48 hours from notification through IMIS, Incident Owner accepts ownership of the incident or reassign ownership to another party if appropriate. Incident Owner commences the requirements for investigation Incident Investigation Injury Involved? Commence Injury Management YES NO Activate Crisis Procedures Incident Management Information System (IMIS) Direct IMIS Access YES NO First Reporter input First Report into IMIS (within 24 HRS)

Incident Management System Process Flow RESTRICTED Line Manager and Contract Holders (Designated Incident Owners) Executive Team Member LFI Coordinator (HSSE Specialist) HSSE Manager Investigation, Review, and Learning 1 Action items will remain open in IMIS until completed. Incident Owner to commence investigation Severity Actual 2+ or Potential 3+? As soon as practical, relevant ET member determines level of Investigation: Investigation Team Leader (if other than Incident Owner); Investigation Method (e.g. Tripod, Causation Model) YES NO Within 10 working days from date of incident, Incident Owner to complete investigation details on IMIS then close the incident record Investigation Team Leader to commence investigation Severity Actual 1 or Potential 2? Complete Incident Investigation & Learning Report (Appendix 7) and submit to relevant LT/ET member, and the LFI Coordinator within 15 days from date of incident. YES NO Upon receipt of signed-off Significant Incident Investigation Report, Incident Owner loads investigation details and remedial actions into IMIS, then closes the incident record. Within 14 calendar days from date of incident, Investigation Team Leader completes Significant Incident Investigation Report (Appendix 7) Within 7 calendar days from receipt of Incident Investigation and Learning Report, issues out a LFI Awareness Alert (ref. Appendix 8) Within 7 calendar days from receipt of Significant Incident Investigation Report, relevant ET member reviews and signs- off report and circulates within ET, Incident Owner, Investigation Team Leader, HSSE, and the LFI Coordinator. Within 7 calendar days from receipt of Significant Incident Investigation Report, issues out a Action Alert ( LFI ref. Appendix 8) Within 5 days from receipt of signed-off Significant Incident Investigation Report, issues out an incident classification as per Performance Monitoring and Reporting Specifications (Appendix 2). Monthly management review of incident and investigation at ET Level (Tier 2). Additional action items may be identified. Monthly management review of incident and investigation at ET-1 Level (Tier 1). Additional action items may be identified. Corporate HSE MIS