Research Update Automated Bolting and Meshing Project - C17018.

Slides:



Advertisements
Similar presentations
FATAL ACCIDENT NO. 7. Coal Mine Fatal Accident Operator: Hubble Mining Company, LLC Mine: No. 9 Accident Date: November 7, 2011 Classification:
Advertisements

Office of Mine Safety & Licensing, Division of Investigations.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2008.
Self Drilling Rock Bolt System for the Coal Industry Ground Support Services Pty Ltd & Alminco Pty Ltd March 2008.
ACARP Roadway Development Operators Workshops - October 2011
AUSTAR COAL MINE A2 MAINGATE ROADWAY DEVELOPMENT Experiences and Lessons Learned Presenter Glenn Sobey Development Mining Engineer Austar Coal Mine.
1Copyright © Xstrata plc Tensionable Tendons Phil Howes Tahmoor Colliery.
Self Drilling Rock Bolt Technology for the Coal Industry Advanced Solutions Ground Support Services Pty Ltd September 2007.
1 Metallurgical Coal EXPERIENCES FROM THE USE OF IN CYCLE TENDON SUPPORT Richard Campbell Principal Geotechnical Engineer Blackrock Mining Solutions.
ACARP – Roadway Development 11, 13, 21 September 2007
Mike Marr Safety Consultant Specialist
‘Feeder Blockage Removal Device’ Shane Phillips – Saraji Mine (BMA)
Development Taskforce Presentation
Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University.
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary.
CRINUM MINE SAFETY INITIATIVE CRINUM BOOT END CONVEYOR BARRIER.
ACARP Australian Roadway Development Improvement Project CM2010 IMPLEMENTATION STRATEGY August/September 2009 Guy Mitchell, BMA Coal Bob Miller, Centennial.
Department of Consumer and Employment Protection © 2008 Resources Safety 1 Please read this before using presentation The charts and tables in this presentation.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 ACARP PROJECT C17004 TOUGH SKIN – A SPRAY-ON POLYMERIC.
Technology Impact on Coal Mine Safety Management – Intelligent Mines Tongyu Liu Shandong Coal Mine Safety Technology Innovation Consortium, China Shandong.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
16 Beltana Development ACARP Roadway Development Operators Workshop Sept
Sandvik Mining & Construction (Tomago) Pty Ltd
ACARP 2008 Improving Development Performance. 2 ABM25s – From Plan to Production Background to Development at Ulan The plan to move development forward.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS September 2007.
Research Update Automated Bolting and Meshing Project.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
ACARP Roadway Development - Operators Workshop March 2008
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
ACARP Australian Roadway Development Improvement Project ROADWAY DEVELOPMENT OPERATORS’ WORKSHOPS March 2009.
Preventing Silicosis in the Mining Environment. 1.Prevention of Silicosis to Improve Mine Workers Health and Quality of Life. 2. Compliance with MSHA.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Ergonomics and Human Factors LECTURE 1. HISTORY OF ERGONOMICS  In the early 1900’s, the production of industry was still largely dependent on human power/motion,
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops September 2009 ACARP PROJECT C17004 UPDATE: TOUGH SKIN – A SPRAY-ON.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
1 ACARP Roadway Development Operator Workshops March 2009 Modelling of Gateroad Development Ernest Baafi – UOW Geoff Gray – SMS Ian Porter – UOW Osvaldo.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
New Mexico MINE ACT Of Modified Statute 2015 Immediately Reportable Accidents.
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2007.
Immediately reportable Accidents New Mexico MINE ACT Of 2006 U.S. MINER ACT of 2006.
CM2010 IMPLEMENTATION STRATEGY
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
MNM Fatal /14 Fall of Material Accident Fall of Material Accident August 12, 2010 (Nevada) August 12, 2010 (Nevada) Underground Gold Mine Underground.
DEVELOPMENT OF THE ABM25 POST CRINUM March 2007 Doing the basics better - West Wallsend, Crinum and Ulan.
Experience with Mining through Surface to Seam Large Diameter Boreholes. 26/11/14 Scott Dennis – Appin Mine.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS August 2008.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Date - 01/02/2003 San Juan Coal Company Thermal Coal Customer Sector Group 1 #BHP Roof Control Jeopardy.
Industrial Automation and Robotics Mr. Muhajir Ab. Rahim School of Mechatronic Engineering UniMAP.
Automated Monitoring and Warning Systems Presented by Mark Johnston – PIMS Group Principal Engineer Dave Dowell – PITS Engineering Manager Introduction.
AAC Monthly Report RA-UG Mine September 2016
TRADITIONAL ENERGY Key Vocabulary: -Energy -Wood -Oil -Coal Mining
Introduction to Electrical Drive
Project Overview Introduction to Factory Automation Numerical Control
Maniks High Quality ECONET for Better Performance
Mining.
Immediately reportable Accidents
Automated Bolting and Meshing Project - C17018
Safety Performance at Aquila Colliery ‘from worst to best in 4 years’
Roof Control Jeopardy.
INTRODUCTION. INTRODUCTION FATALITIES PER YEAR ( )
Immediately reportable Accidents
Automatic Tank Cleaning
Presentation transcript:

Research Update Automated Bolting and Meshing Project - C17018

Introduction This project aims to help contribute to ACARP and the Australian’s underground coal industry’s CM2010 initiative in achieving production rates from a continuous miner of at least 10 metres per operating hour and 20 hours per day utilisation by We aim to do this by developing a system integrated into a continuous miner platform that will fully automate the process of self loading and installing:  rib and roof Self Drilling Rock Bolts, and associated plates, washers etc.,  steel roof and rib mesh or other alternative roof confinement material,  materials handling systems needed to efficiently supply consumables at the expected rates of use. Summary of the Project Today ACARP Funded Project C17018

Shiny new Broken & Battered Reality Check Major Challenges:  Physically constrained work volume  Adverse environment – rock falls, water ingress, corrosion, vibration, dust etc.  IS compliancy – valves, sensors, processors, actuation etc.  Constrained work platforms & limited access  Interacting machinery  Limited power  Materials delivery: surface → panel → Continuous Miner  Etc. etc. etc.

Background

Where do you fit something new on here without interfering with the basic operation and maintenance?

Project Outcomes Reduced cycle time for roof and rib support installation that will directly increase roadway development production rates; Reduced exposure of personnel to unsupported roof, dust, noise, water, moving equipment and outburst conditions. – For LTI frequency of hand/finger injuries by employer activity, roof/rib bolting had the highest incidence at 26% followed by materials handling at 16%. For injuries causing death, there have been 107 fatalities for NSW coal mine in the past 25 years with 61% occurring at the development face and 57% related to rock falls; Reduced manual handling injuries by improving the logistics and storage method for the loading and transportation of roof support consumables to and then within the development area and finally onto a continuous miner. The removal of remedial and repetitive manual tasks that allows for better utilisation of mine operators elsewhere in the production process. The expected major benefits of this project will be:

System Variance Although roadway development when simply broken down is “cut, bolt, convey”, there is an amazing amount of variance in the process that makes it difficult to automate. Geotechnical conditions Bolt pattern density & Type Seam height Work force culture Management standards Physical Variance Intangible Variance Machinery preferences Cutting cycles Logistics Retrofit – one fits all bolt on system Targeting the following: 12CM30/32 and ABM25. 6 roof 4 rib bolt pattern. Minimum roof height 2.8m and 5.0m – 5.4m roadway width. Peter Gray and/or Hilti self drilling bolt.

Initial Concept Two cooperating robots with additional linear motion Mesh dispensing unit Multifunctional end effector Bolt, nut and plate presenter

Bolt Manipulator

Bolt Cassette

END VIEW

Bolt Manipulator

Mesh Handling PLAN VIEW

Mesh Handling PLAN VIEW SIDE VIEW

Mesh Cassette PLAN VIEW FRONT VIEWSIDE VIEW

Where to from here Year one Shortly we should be demonstrating the automatic loading of self drilling bolts into a drilling rig. Demonstration is to be in the laboratory using a prototype manipulator currently being fabricated. Year two Demonstration of mesh handling system. Beyond this project Modification of prototype system for underground trials Transfer of research over to OEM’s for commercialisation and further development.