BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to.

Slides:



Advertisements
Similar presentations
© 2004 Flashline Inc. The Seven Faces of Reuse Enterprise Architect Summit June 8, 2004 Charles Stack Founder and CEO Flashline, Inc. © 2004 Flashline.
Advertisements

Building Information Management (BIM)
Presentation by Priyanka Sawarkar
Test Automation Success: Choosing the Right People & Process
Components of a Product Vision/Strategy
VSE Corporation Proprietary Information
Please open full screen The new effective way for reducing costs in construction projects.
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Chapter 6 Enterprise e-Business Systems.
Product Configurator for Marketing to Manufacturing design automation.
1 Autodesk MEP Solutions Autodesk MEP Solutions Mechanical Electrical Plumbing Design for Buildings AMS | CAD Consulting Group
© 2012 Autodesk Beyond Design with Autodesk Revit 2013 and Autodesk 360 Cloud Services Kal HouhouJohn Harriman BIM ImplementerPrincipal.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
The Global API Federation
ProjectWise Navigator Visual Collaboration for Immersive Project Review & Analysis Joe Croser Global Marketing Director, Platform & SELECT.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Reverse Auctioning at the University of Pennsylvania SUNY Purchasing Association Fall Conference October 9, 2003.
Enterprise Architecture The Arkansas Approach. Key Areas What is enterprise architecture? Why is it important? How you can participate Current status.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Essentials of Management Information Systems, 6e Chapter 2 Information Systems in the Enterprise 2.1 © 2005 by Prentice Hall Information Systems in the.
Product Lifecycle Management: Meeting the Needs of Collaboration
1 sm Using E-Business Solutions to Meet Management Challenges: Interoperability & Flexibility Bring Success to the Implementation of Specialized Components.
The Methodology for Business Transformation (MBT): A Well Rounded and Practical Application of Enterprise Architecture A|EA August Meeting Presented By:
Remedy, a BMC Software company Storyboarding the User Interface: Blueprint for an Application Shanaz Kanga | Michele Sarko Sr. UI Design Engineer | Manager,
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
AXSYS ®.Process Overview. AXSYS Products AXSYS.Process – Process Engineering Environment for Front End Design & Engineering, providing an integrated Process.
BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to.
Business Rules: The Promise of Data Warehousing. In the Beginning: Formulating Business Rules The Business Objectives The Promise (Data Warehousing) –
Introduction to BIM BIM Curriculum 01.
Automotive Warranty System 1.  Challenges faced by CIO  Our Solution  Our Methodology  Cloud Based Architecture  Clientele  Highly customizable.
7 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
PO Box 1508, Vancouver, WA (360) THE COMMERCIAL & INDUSTRIAL BILLING SOLUTION.
Publish Your Work BIM Curriculum 04. Topics  External Collaboration  Sharing the BIM model  Sharing Documents  Sharing the 3D model  Reviewing 
IT Systems Analysis & Design
4NJT opt BuildingSMART Munich APRIL ICT ENABLED COLLABORATIVE WORKING Nick Terry BDP Chairman IAI UK Chair & International Deputy Chair Munich.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Welcome to Lunch & Learn Simplify Your Digital Workflow with Smarter Solutions.
B2B E-Commerce Characteristics
ProjectWise StartPoint An entry-level collaboration tool built on Microsoft SharePoint technologies Joe Croser Global Marketing Director, Platform Products.
7-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 7 IT Infrastructures.
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Copyright© 2002 Avaya Inc. All rights reserved Anna Dorcey Director, Avaya DeveloperConnection Program August 4, 2004 Partnering in the VOIP World Anna.
In 8 Minutes SocialSimple Personalize Your Web Through Social Networking.
EPA Geospatial Segment United States Environmental Protection Agency Office of Environmental Information Enterprise Architecture Program Segment Architecture.
CEN5011, Fall CEN5011 Software Engineering Dr. Yi Deng ECS359, (305)
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
1 - 1 Systems Analysis and Design, Key Ideas Many failed systems were abandoned because analysts tried to build wonderful systems without understanding.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage and Disposition Inventory Returns.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
COMPANY INTERNAL — CONFIDENTIAL Unauthorized Use and Disclosure Prohibited Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. COMPANY INTERNAL.
Introduction to SQL Server 2000 Reporting Services Jeff Dumas Technical Specialist Microsoft Corporation
EPIC Connections® is a leading provider of contact center consulting, outsourcing and managed infrastructure services. Our highly qualified teams deliver.
© 2009 Bentley Systems, Incorporated Intermediate Status Dec 8, 2009 FM Handover Aquarium (COBie2)
WELCOME TO A WORLD OF SHARING. Collaboration as a Service Service-minded vision based on cloud collaboration With a vision rooted in the belief that progress.
Visualization and 3D Rendering Software Market to Global Analysis and Forecast by Application, by Deployment Type and by End User No of Pages: 150.
DESIGN TOOLS UPDATE.
BIM & IPD This PPT is about Building Information Modeling (BIM) and
Beck Technology Innovation in all Dimensions.
On-Site Health & Wellness Centers
Victoria Australia (BUGVA).
Committed to delivering winning solutions
Introducing Everglow – How can we be of service to you?
Chasm Institute Copyright Notice
Presentation transcript:

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One SM Welcome An on-line introduction to

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Agenda Why BIM? BIM is what ? Measuring the benefits. Who is doing BIM? Examples of BIM in practice. Highlighted technologies for BIM …and 1 minute about Bentley.

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Outline Agenda Why BIM? BIM is…? Measuring the payoffs. Who is doing BIM? Examples of BIM in practice. Highlighted technologies for BIM …and 1 minute about Bentley.

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One Benefits of integrated processes, teams, and tools

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One… Integrate the work, processes and information of: – Multiple Disciplines Architects, Engineers, Specialists – Multiple Companies Peers, Subs, Partners, Clients A “one-time enterprise” – Multiple Project Phases Design Construct Operate

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One - Time Teams that build as one, waste less time. – Design Increase opportunity for design iterations Exchange information between disciplines quickly – Documentation Spend less time on grunt work Spend less time documenting, avoid redundant efforts – Construction Fast-tracking Managed schedules Design/Build

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One - Quality Teams that build as one, improve the quality of work. –Improve coordination between documents between disciplines between teams –Reduce errors & omissions Coordinated documents Well captured design intent –Enhance the design process Informed design environment

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Build As One - Money Teams that build as one, enhance profitability & competitiveness. –Effectively applied man-hours –Efficient deliverables –Lower error and omission remediation costs –Lower contingencies –Lower insurance premiums –Faster delivery of service –More competitive quality of work –Tighter bidding for design and construction

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. What is BIM? And how does it help us build as one?

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Image courtesy NBBJ BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. A working definition of BIM Image courtesy NBBJ Building –The entire lifecycle of the building (Not just design…) Information –All information about the building and it’s lifecycle (Not just Architectural Drawings…) Modeling –Defining & Simulating the building, its delivery, operation (Not just the physical characteristics…) Image courtesy NBBJ

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. 20 Enabling Technologies for BIM 5.Facility/Asset Mapping 4.Interactive Visualization/Analysis 3.Feature-based Solids Modeling 2.Parametric Design 1.Discipline-specific applications 20.IP Management 19.Scalable, Open System 18.Enterprise System Integration 17.Project Standards Management 16.Multi-Disciplinary Model 15.Context-sensitive Representation 14.Change Management 13.Coordinated Documentation 12.Construction/Schedule Simulation 11.Rapid Prototyping 10.Anywhere Publishing 9.Project Querying 8.Document Management 7.Federated Data Architecture 6.Native DWG/DGN Create / Access / Analyze Shared Information Synchronized Information Information Context Secure Information

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. BIM Business Benefits… As told by our users

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Evolution Building Information InformationModeling ’00s Computer Modeling ( 3D ) ’90s Computer Drafting ( 2D ) ’80s T-SquareAidedDrafting ’70s Benefit

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Building Information InformationModeling ’00s Computer Modeling ( 3D ) ’90s Computer Drafting ( 2D ) ’80s T-SquareAidedDrafting ’70s Benefit Evolution

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Building Information InformationModeling ’00s Computer Modeling ( 3D ) ’90s Computer Drafting ( 2D ) ’80s T-SquareAidedDrafting ’70s Benefit Evolution

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Right information, at the right time Time Impact of decisions In traditional methodologies high impact decisions are often made when minimal relevant information is available… Amount of information

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Right information, at the right time Time Impact BIM enables high impact decisions to be better informed by increasing the availability and timeliness of relevant information. Information

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. design documentation construction design documentation construction remediation cost The Cost of Design Errors Cost and time to rectify a design error or omission increase dramatically the later it is discovered

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Measuring the value in practice –15.8 Billion cost/yr. in the US due to fragmentation –$1.2 Billion to AEs –10% Schedule Reduction potential

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. “Reductions in delivery time, on the order of 20 to 50 percent, are possible…” “Our industry’s inability to communicate effectively has created tremendous waste and inefficiency, estimated at up to 30 percent of the total cost of each building project.”

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. BIM is being Demanded

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Where Does the NIST Money Go? Planning, Design & Engineering Construction Operations & Maintenance $2.7b $4.1b $9.1b Source: NIST

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Where Does the NIST Money Go? Planning, Design & Engineering Construction Operations & Maintenance $2.7b $4.1b $9.1b You should care about this…

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Where Does the NIST Money Go? Planning, Design & Engineering Construction Operations & Maintenance $2.7b $4.1b $9.1b You should care about this…

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Where Does the NIST Money Go? Planning, Design & Engineering Construction Operations & Maintenance $2.7b $4.1b $9.1b You should REALLY care about this…

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. So, where is BIM first and strongest? Where risks and rewards are shared –Between design disciplines –Between Phases of work/responsibility Where the building is strategic to the owner’s business –Integrated into the business, not just containing it Where ‘extra’ is desired –Delivery Process –Performance –Form

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. So what does that mean to you? How are BIM practitioners capturing those NIST dollars?

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Measuring the value in practice

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Measuring the value in practice

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Measuring the value in practice

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Measuring the value in practice

BUILD AS ONE BENTLEY.COM/BIM Architects - Engineers SSOE BUILD AS ONE BENTLEY.COM/BIM

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. BE Award Nominee Founded in employees 11 offices in US, Puerto Rico & Shanghai Key Markets  Automotive  Chemical  Civil/Infrastructure  Commercial  Education  Energy  Food & Beverage  Glass  Health  Manufacturing  Personal/Household Care  Pharmaceutical  Retail

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. ½ the Time at ½ the Cost What if that was the goal you client was setting for themselves?

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. The Old Way – 2d Abstraction BIM removes abstraction, connects processes

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Building Information Modeling A multidisciplinary 3d model that integrates –Multiple disciplines –Design and documentation –Plans, Sections, Details, Elevations –Graphics and data BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc.

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Coordinated Documentation 3D Details One 3D = Three+ 2d One recent project: 16 3D Details Replaced 50 2d Saved 200 hours Saved $20K fees

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Coordinated Documentation

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Measuring the value in practice BIM beats the budget by 14%

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Time to Market A typical auto project = 36 months 12,000 Pickup Trucks per month 1 month = $40 million A typical auto project = 36 months 12,000 Pickup Trucks per month 1 month = $40 million Structural steel reduced by 1 month BIM reduces design by 5 months Structural steel reduced by 1 month BIM reduces design by 5 months = $40 Mil. More Revenue for the owner = $200 Mil. More Revenue for the owner

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Time to Market A typical auto project = 36 months 12,000 Pickup Trucks per month 1 month = $40 million A typical auto project = 36 months 12,000 Pickup Trucks per month 1 month = $40 million Structural steel reduced by 1 month BIM reduces design by 5 months Structural steel reduced by 1 month BIM reduces design by 5 months = $40 Mil. More Revenue for the owner = $200 Mil. More Revenue for the owner

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. What you need to BUILD AS ONE

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Discipline Specific Applications Architecture Structural Engineering M/E/P Engineering –HVAC –Plumbing –Fire Protection –Electrical –Communications/Data Civil/Site Engineering –Site –Infrastructure Etc. Optimized per discipline To Design, Refine, Analyze In your domain, language, libraries

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Working Together A Shared, Common Technology Platform –Ensure data compatibility –Avoid data re-entry –Integrated functionality –Coordinated user environments Open and Customizable –APIs, VBA, COM, ODBC, Scripts and Macros, Interface, etc... Supporting Industry Standards –IFC, CIS/2, SDNF, STEP, IGES, STL, VRML, DXF, CGM, PDF, DGN, DWG, PDF... Managed Environment –Integrate distributed teams, tools and processes –Manage and publish building information

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. for more information

BUILD AS ONE BENTLEY.COM/BIM (c) 2005 Bentley Systems, Inc. Notice Presentation version V5e – 8/26/2005 Special for Build As One web zone – online ‘e-Seminar’ Copyright ©2005 Bentley Systems, Incorporated. All rights reserved. This presentation is provided solely for informational purposes and does not constitute conveyance of any intellectual property rights. This presentation may not be reproduced or redistributed, in whole or in part, without the prior consent of Bentley Systems, Incorporated. For more information please contact Note: Videos in this presentation may require the TechSmith video codec (available at