Project Engineering & Construction Management Solution Project Access BOQ Component 1 Model WBS BudgetSchedule PlanRequisition AdministerProcure StockVendor.

Slides:



Advertisements
Similar presentations
Amitava Mitra, Solution Architect, Oracle Primavera, TCS
Advertisements

Bentley’s Substation Design Solution Al Gray
The Engine Driving Business Management in Project Centric Environments MAGSOFT INTERNATIONAL LLC.
Bentley Systems, Incorporated
NetWORKS Strategy Manugistics NetWORKS Strategy 6.2.
Trimble  Quantm  Haul Road Optimization Presenters Name.
Well, Sort-of.
The Quiet Revolution in Building Design and Construction: BIM.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
Introduction to SAP R/3.
Project Portfolio Management Technology Analysis Russ Hopler IBM Rational Software.
Managing Projects
Module 1: Overview of Information System in Organizations Chapter 2: How Organizations use IS.
XII- COST CONTROL, MONITORING & ACCOUNTING
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Build your Business Growth on the ground of Dataman’s ERP Solutions Powered By :- Dataman Computer Systems Pvt. Ltd.
NASA Growth Strategy Cindy Bolt Group Vice President March 10, 2009.
CORPORATE PROFILE
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Introduction to BIM BIM Curriculum 01.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
The Engine Driving Purchasing Management in Complex Environments MAGSOFT INTERNATIONAL LLC.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
September 3, 2013 Project on Inventory Control System (PICS) P.I.C.S
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Intuit Master Builder 2003 System Tour Intuit Master Builder 2003 We need that estimate today! It takes me 2 days to get out that billing. Where’s our.
IT Strategic Planning.
CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER
Project Cost Management
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
AEC Budget An estimating application for construction contracting companies Product High Level Features.
NAV in Construction Aleksandar Totovic, MVP
How to Implement Microsoft Dynamics NAV in Construction Aleksandar Totovic, MVP
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #15.
Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks Information Technologies for Construction 2.
Manufacturing Solutions- Knitting TexManage. Knitting Functional Flow Receipt of Orders Generation of Internal Order Yarn Requirement Allocation of Machinery.
Virtual Building Solutions Better Buildings. Better Built. BIM Marketing.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Integrated Modeling Environment System Engineering Seminar Johnny Medina / Code 531 Chris Stone / Code 531 / Constellation Software Engineering.
Join us on Twitter: #AU2013 CI1754-R BIM for Infrastructure in Concrete Terms Francesca Maier, PE Aaron KrovanceKevin Gilson Parsons BrinckerhoffHDR, Inc.Parsons.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
© 2009 Bentley Systems, Incorporated Intermediate Status Dec 8, 2009 FM Handover Aquarium (COBie2)
EC&O – BUSINESS Business Benefit Due to OMNI. OMNI – Complete EC&O Solution What is EC&O stands for… Real Estate Developer Developer plus contractor Core.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
6 DIMENSIONAL APPROACH TO CONSTRUCTION 2nd floor, S&R Building, Soonora Church 1st Cross Road, Elamkulam, Kochi 20, Kerala, India
Webinar II: Enterprise IPM Schedule Integration Solution
© 2011 Autodesk Autodesk ® Sustainability Solutions Buildings and Infrastructure Name Title.
1 Taruna Kalra Ms lisha. 2 What Is ERP? Enterprise Resource Planning (ERP) is a business management system that integrates all facets of the.
For Successful Projects
Design Quality (30%) - 6slides Explain your key concept? (2slides)
INTRODUCTION TO CAPSTONE PROJECT
Copyright Scott Bloss, All rights reserved.
SAP S/4HANA 1709 – SAP S/4HANA Suite
Create, Collaborate, Construct - A Guide to Projects
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Presentation transcript:

Project Engineering & Construction Management Solution Project Access BOQ Component 1 Model WBS BudgetSchedule PlanRequisition AdministerProcure StockVendor Bill GOExecute QualifyAccount for Client BillReconcile EARN 2D to 3D BIM BOQ to WBSCost EstimatesConstruction SchedulesProject PlanningProject DeliveryBCWS, BCWP & ACWP 1.AEC BIM can generate 2D AutoCAD objects from architectural, structural and MEP drawings to generate in to a 3D model geometry to set project scope in visual environment. 2.AEC Apps can set relation between billable BOQ items and 3D model geometry objects with engineering calculations running behind as project WBS. 3.AEC Budget capable to estimate project costs based on enterprise resources categories in real-time environment taking costs from library resources like manpower, machines, materials and subcontracts. 4.AEC Apps capable to project master schedule to generate cash flows and resource requirements to build digitally first. 5.AEC planning engine can communicate with HRM, Assets and Inventory modules to plan project day activities and generate man and machine calendars as BCWS. 6.AEC execution engine can capture actual resource deployments and consumption in line with project budgets, schedules, WBS geometry for each BOQ to generate BCWP and ACWP. This can pull real-time quantities and costs from HRM and Asset modules and push cost and revenue journals to accounting modules. 7.Creates a virtual engineering and construction environment integrating Microsoft Dynamics ERP, AutoCAD, MS Project, STAAD Pro to coordinate, communicate and collaborate project team to accomplish construction business functions and processes. 1.AEC BIM can generate 2D AutoCAD objects from architectural, structural and MEP drawings to generate in to a 3D model geometry to set project scope in visual environment. 2.AEC Apps can set relation between billable BOQ items and 3D model geometry objects with engineering calculations running behind as project WBS. 3.AEC Budget capable to estimate project costs based on enterprise resources categories in real-time environment taking costs from library resources like manpower, machines, materials and subcontracts. 4.AEC Apps capable to project master schedule to generate cash flows and resource requirements to build digitally first. 5.AEC planning engine can communicate with HRM, Assets and Inventory modules to plan project day activities and generate man and machine calendars as BCWS. 6.AEC execution engine can capture actual resource deployments and consumption in line with project budgets, schedules, WBS geometry for each BOQ to generate BCWP and ACWP. This can pull real-time quantities and costs from HRM and Asset modules and push cost and revenue journals to accounting modules. 7.Creates a virtual engineering and construction environment integrating Microsoft Dynamics ERP, AutoCAD, MS Project, STAAD Pro to coordinate, communicate and collaborate project team to accomplish construction business functions and processes.

Project Management – Interpretation WBS BOQ Project Component Model System integration architecture explained here is based on real time simulation. 1. Projects can contain component models. 2. Each model contains several WBS items to make up in to a model. 3. Sum of each category type of WBS elements is termed BOQ or Task or Activity. 4. BOQ or Task are billable quantities. 5. Activities are internal quantities as enabling works to facilitate construction or to produce captive resources System integration architecture explained here is based on real time simulation. 1. Projects can contain component models. 2. Each model contains several WBS items to make up in to a model. 3. Sum of each category type of WBS elements is termed BOQ or Task or Activity. 4. BOQ or Task are billable quantities. 5. Activities are internal quantities as enabling works to facilitate construction or to produce captive resources

AutoCAD Tools to Automate 2D Formatting

3D Models from 2D Drawing Quantity Take-Off on the FLY

3D ReBar 1. 3D rebar application that can design nerve system of your concrete construction. 2. This is the most Intelligent RC Designer, Detailer and Drawing solution to produce BBS on the fly. 1. 3D rebar application that can design nerve system of your concrete construction. 2. This is the most Intelligent RC Designer, Detailer and Drawing solution to produce BBS on the fly.

Highway Design and Modeling AEC Roads can quickly prepare your alignment Designs from terrain, produce Drawings and Quantity Estimation for all road components including complicated earthworks.

Cross Drainage Works - Culverts AEC Culverts can quickly prepare your cross drainage works Designs, produce Drawings and Quantity Estimation for all structural components

Land Development – Terrain Management AEC Terrain can quickly prepare your LAND management works, designs and produce profile drawings along with Quantity Estimation

Cut-Fill AEC Cut-Fill Tool can quickly produce profile drawings from data files along with Quantity Estimation for all engineering projects involving earthworks.

BIM-BOQ Mapping (Billable Items) Each model be mapped to billable BOQ items for production, delivery and revenue generation

Budget / Cost Estimation (BOQ wise) Machinery, Material, Manpower and Sub-Contract BOR AEC ERP system has unique power than other solutions to consider bill of resources than merely confining to bill of materials to include manpower, machines and subcontract resources. These resources generally contribute about 40% cost of a project. We buy and employ BOR to produce and sell the BOQ.

Sequence of Construction AEC ERP finally schedules BOQ and BOR to indicate most practical Project Resource Requirement Planning than mere Material Requirement Planning in traditional ERP systems. The schedules, models, WBS and BOQ can then drive a visual scheduling to make your incredible project management plans. AEC ERP finally schedules BOQ and BOR to indicate most practical Project Resource Requirement Planning than mere Material Requirement Planning in traditional ERP systems. The schedules, models, WBS and BOQ can then drive a visual scheduling to make your incredible project management plans.

Planning & Execution With the aforesaid system architecture planning and execution are most simplified as unique solution for the construction and manufacturing industries by AEC.

Thank you