Processes and Process Proofing 3 What is a Process Process Structures/Families/Etc. Identify Processes Determining Key Processes and Risk Prioritizing/Selecting.

Slides:



Advertisements
Similar presentations
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Advertisements

Effectively applying ISO9001:2000 clauses 6 and 7.
Effective Contract Management Planning
Software Quality Assurance Plan
Understanding the Requirements Qimpro Standards Organization
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
First Article Inspection Report
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Management System
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Quality Assurance/Quality Control Policy
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9000 Certification ISO 9001 and ISO
Software Engineering Institute Capability Maturity Model (CMM)
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Effective Methods for Software and Systems Integration
ISO/IEC A review of the new standard for laboratory accreditation
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
S/W Project Management
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Introduction to Software Quality Assurance (SQA)
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
From Research Prototype to Production
Software System Engineering: A tutorial
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Project Life Cycle.
Georgia Institute of Technology CS 4320 Fall 2003.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
QUALITY MANAGEMENT STATEMENT
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
State of Georgia Release Management Training
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
LESSON 3 Process Review 15November2013.
UNDERSTANDING ISO 9001:2008.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
ISO/IEC
UNIT V QUALITY SYSTEMS.
Software Requirements
Quality Management Systems – Requirements
CLINICAL INFORMATION SYSTEM
Operationalizing Export Certification and Regionalization Programmes
First Article Inspection
How to conduct Effective Stage-1 Audit
TRAIN ADVENTURE ANALOGY
ISO 9001:2000 Management System Overview
Software Reviews.
Presentation transcript:

Processes and Process Proofing

3 What is a Process Process Structures/Families/Etc. Identify Processes Determining Key Processes and Risk Prioritizing/Selecting a Process for Proofing Who, What, When and Why Proofing Understanding the Process - HOW –Identifying the Requirements –Assessing Inputs –Flowing the Process Assessing the Process as Defined Proofing Questions Assess Outputs Document Proofing Efforts Utilizing Proofing Results Summary

4 What is a Process? “The combination of people, equipment, materials, methods and environments that produce output--given product or service. A process can involve any aspect of a business…(2) a planned series of actions of operations which advances material or procedure from one stage of completion to another, (3) a planned and controlled treatment…” Source: DSMC Glossary Defense Acronyms & Terms

5 Typical Process Process X Identify the key activity that must be performed in order to meet the process objectives and contract requirements Inputs Personnel Methods Materials Environment Equipment Information Outputs Goods Services Reports Products Design Schedule Requirements

6 Process Structure and Relationships Systems (or process families) and their sub- systems are natural groupings of related processes and controls within a manufacturing/business system Process - a series of tasks leading to a common objective and satisfying a requirement Task - actions/steps taken by an individual leading to the completion of a process

7 Purchasing Accounting Estimating Govt. Prop Contract Admin Material Mgt Systems and Process Families Cost/Schedule Management Engineering Change Management Product Design and Definition Systems Engineering Design/Test Management Software Development Product Delivery Manufact. Mgmt. Quality Assur/System Product Integrity/ Technical Requirements Product Support Provisioning Warranty Technical Data Business Planning and Administration Program Planning and Control

8 Sub-Systems and Their Processes Manufacturing Mgmt. Systems Quality Assurance/System Manufacturing Engineering Quality Control Planning Manufacturing Planning Work Instructions/Records Facility Management Nonconforming Supplies Work Measurement Corrective Action Prod., Scheduling and Control Supplier Quality Assurance Packaging, Handling and Transport Metrology and Calibration Subcontract Acquisition Management/Purchasing Advanced Subcontract Planning Subcontract Negotiation or Award Subcontract Administration

9 Sub-Systems and Their Processes (CONT.) Contract Administration Property Management Estimating Property Acquisition Forward Pricing Rate Agreements Receiving Indirect Cost Control Inventory Control Compensation Utilization & Consumption Allocability Engineering and Design Mgmt. Disposition Software Development Maintenance Test Management Performance Management Configuration Program Management

10 System: Sub-System: Process: Tasks

11 Support & Direct Processes SUPPORT PROCESSES SYSTEMS ENGINEERING METROLOGYAUDITS CONFIGURATION MANAGEMENT DIRECT PROCESSES S/W CODE MACHINING HEAT TREAT SOLDERING

12 Identifying Processes Review Contract and related documents –SOW, Drawings, Test and Performance Specs, CDRLs and Schedules Review Contractor’s Documents –Procedures, Method Sheets, Work Instructions, P.O.s, Work Orders, Flowcharts, Control Plans Become Familiar with the Facility, Systems and Products

13 Quality System Processes (Commonly found at most Contractor Facilities) –Receiving & Reviewing Contract Information –Purchasing –Maintaining/Calibrating Equip and Tools –Control of Drawings –Production Planning and Control –Performing Operational Functions/ Mfg. –Inspecting/Reviewing Output Identifying Processes

After Identifying Processes Next Step Select Key Processes Assess Risk

Key Process SIGNIFICANT AFFECT ON PRODUCT/CONTRACT TECHNICAL PERFORMANCE, COST AND SCHEDULE Processes determined to be of a critical nature are identified/labeled as K ey P rocesses

16 Process Risk Assessment Each Key Process Is Risk Classified Based on Data Analysis - Sources: C USTOMER, DCMA, Second Party AND C ONTRACTOR (Consider: history, capacity, capability, maturity and contractor responsiveness) Three Risk Levels - H igh, M oderate and L ow Use Team Approach to D ecision M aking

17 Selecting and Prioritizing a Process for Proofing Identified as K EY P ROCESS(Critical) Processes identified as H IGH R ISK –Assess Relative Severity of Risk - Consider: »Criticality of Process/Impact on End Item »Process Complexity »Process Controls »Process Maturity »Process Performance »Visibility and Customer Needs

18 Process Proofing W ho W hat W hen W hy H ow ? ? ? ?

19 Process Proofing W ho - All functional Technical Specialists can do Process Proofing (may be done as a team) W hat - Comprehensive Audit of Process Inputs, Steps and Outputs W hen - – Conducted on all previously identified high risk key processes IAW prioritized list – May be conducted on all moderate level processes- to help establish confidence – Conducted when significant changes may affect process output (reproofing)

20 W hy –To provide confidence in a contractor’s process to produce the desired outcome –To identify reasons for high risk rating leading to correction or improvement –Develop improvement topics/opportunities for PROCAS & Management Councils –Helps reduce reliance on inspection Process Proofing

21 H ow –Identify Contractual Requirements governing the process –Identify Process Inputs and Conduct a Comprehensive Review of Inputs: Methods Materials Equipment Personnel/Skills Environment Information Do they conform to cost, schedule and technical contractual requirements? Can they be enhanced to improve the process? Process Proofing

22 Process Proofing “Understanding the Process” or “Gaining Profound Knowledge”

23 –NO ONE WAY TO PROOF A PROCESS –Your method/steps of proofing will depend to some extent on: contractor’s system of documenting efforts your familiarity with the process –May identify contractual requirements first or flowchart/sequence the events first or review inputs first or use blended approach H ow Process Proofing

24 Process Proofing Flowchart or Guide “How” - One Approach

25 Process Proofing Flow Could just as easily look like this Select Process to Proof Review Requirements Flow Process Identify Inputs Assess Inputs against requirements Assess inputs/process in practice Assess Process Outcome against Requirements Document Efforts

26 –One Approach »Begin with Methods (one of the process inputs) »Determine governing contractual cost, schedule and technical requirements »Assure contract requirements are flowed into/reflected in contractor methods »In other words: Review Contractor’s Methods, e.g.; procedures, work instructions, manuals, etc., against contractual requirements, e.g.; ISO 9000 Standards, Mil-Specs, Commercial Standards How - review process inputs against requirements Process Proofing

27 –Through reviewing/evaluating contractor methods you will be identifying other requirements and inputs »Materials e.g.; type of materials (hazmat), traceability, availability ( stock, order, make or buy, lead-times, vendors) »Personnel/skills e.g.; training, years of experience, license, certification status »Equipment e.g.; type (on hand,acquire or furnished), calibration, capability, capacity, condition »Environment e.g.; clean-room, atmosphere controlled, EPA, safety »Information e.g.; third party, contractor, government and/or customer records, data –Assure inputs are correctly/adequately addressed in methods (contractor’s documents) How - review process inputs against requirements Process Proofing

28 Typical Process Process X Identify the key activity that must be performed in order to meet the process objectives and contract requirements Inputs Personnel Methods Materials Environment Equipment Information Outputs Goods Services Reports Products Design Schedule Requirements

29 Fuel Containment System Sealing To achieve a leak free containment system, three critical elements are involved. The first is the cleaning process to ensure proper sealant adhesion; the second is the selection of the proper sealant for application; the third is the application of the sealant. - Cleaning Process surface preparation - Selection of Sealant - Sealant Application: Tank entry constraints Methods of application Environmental controls Inspection time INPUTS - Certified Techs -Work Instruct. -Materials OUTPUT -Leak Free Fuel Containment System PROCESS EXAMPLE

30 Configuration Management Process Definition: Change (configuration) Control. Establishment and implementation of a plan to ensure configuration control while documenting design, hardware, and procedural changes. PROCESS INFORMATION Review and evaluate per requirements: Contract/SOW, authenticated spec and applicable approved plans. -Establish item/system baseline -Manage and Control Changes -Maintain current status and reports -Perform reviews and audits...FCA/PCA INPUT OUTPUT Configuration Identification Configuration Control Configuration Status Accounting Configuration Audits Drawings Requirements Specifications: DoD-STD-100C, Mil-Std-973 or commercial equivalents Logistics supportability CI and documents for govt. control and contractor mgmt. Report Certification for CI/FCA/PCA PROCESS EXAMPLE

31 FLOWING THE PROCESS While gaining knowledge about/reviewing the process/inputs -You will also be

32 Flowing The Process »Can develop a flow chart or use a sequence of events (list of process operations or steps) or use contractor’s flowchart (must verify accuracy) »Develop flowchart - Walkthrough process »Does it flow as described by contractor documentation? »If differences in written procedures and in practice - must take action (discuss with contractor, possibly issue CAR/CIO) H ow

33 Procurement Process Flowchart

34 for gaining Profoun d Knowled ge of Process X Certifi cate Understanding the Process -Identified Requirements -Flowed the Process -Evaluated Contractor’s Inputs (as reflected in Methods)

35 Assess Process as Defined (Against Requirements) Requires physical evaluation or monitoring of: –work in progress –verification of inputs in use –evaluating outputs of process activities/steps

36 Proofing Questions Methods –Are methods adequate to produce conforming products –Are changes to these methods translated adequately and in a timely manner –Methods may include, but are not limited to: Work Instructions, Travelers, Procedures, Method Sheets –Examples: Are work instructions available and up to date Is work accomplished IAW WI or are short cuts utilized and not annotated Are all documents completed as required - evaluate samples

37 Environment –Are the processes conducted under controlled conditions IAW requirements –Can these always be controlled –Safety personnel/equipment available if needed Examples: Are temperature and humidity gages within limits and are they calibrated and records available Clean Room - is all protective clothing being worn Proofing Questions

38 Personnel/Skills –Do the people have the required skill level –Does the contractor have a method to train personnel –Do the people have the proper certifications Examples: Are training records available, review samples Are instructor credentials maintained, review Do they have a notification system for certification expiration dates Proofing Questions

39 Materials –Does the material(s) meet all contractual and/or contractor imposed technical requirements –Does the contractor have a method to assure the correct material is always used –Is material traceable as required Examples: Are proper materials are being utilized on the floor Are materials properly identified Proofing Questions

40 Equipment –Is the equipment the proper accuracy –Is it included in the calibration program –Does any equipment require certification/qualification Examples: Is out of calibration equipment properly identified Are tooling fixtures properly identified and stored Are parameters appropriately set, e.g.; heat settings, etc. Proofing Questions

41 Proofing Questions Information Is information pertinent Is information accurate Is information timely Is information validated Example: Do Purchase Orders have complete description of product ordered Are delivery forecasts maintained and updated Are engineering drawings updated Is data correctly recorded, maintained and used

42 After Assessing Process as Defined Next Step Assess Process Output Against Requirements

43 Assess Process Output Against Requirements Sample Process Output, i.e.; product against the requirements and verify compliance –Examples: Review Purchase Orders as a product of the Purchasing Process Inspect manufactured items as product of a manufacturing process such as soldering, welding, coating, machining, painting, etc. Review MRB documents as one of the products of the NCM Process

44 After Assessing the Output Document Process Proofing Efforts

45 Documenting the Proofing Effort Process proofing documentation should be of sufficient detail to: –Answer the questions: Who? What? When? Where? How? –Documentation should describe: the process requirements, inputs, and steps; the methods used to evaluate them; the results of the evaluation; and any follow-up action necessary Simple Check Sheets are Insufficient

46 Utilizing Process Proofing Results Used to Identify Weaknesses in a High Risk Process (CARs/CIOs) Used to Identify Areas for Improvement May be used to Establish Confidence in Processes Rated as Moderate Risk Used to Adjust Plan and Redirect Resources

47 Adjusting Surveillance Plan Proofing Results Risk Level Adjustments Adjustment to Surveillance Techniques

48 Data Collection –Increase or decrease data/reports collected and analyzed –Establish new points for data collection Product Audit Points (process measurement) –Eliminate or add PA points –Reduce or increase frequency and/or intensity Adjusting Surveillance Techniques

49 Identifying Process Improvement Reduce variability, defects & costs Increase process capability, effectiveness, & productivity and on time delivery Increase customer satisfaction –“ Total quality control is an effective system for integrating the quality-development, quality-maintenance, and quality- improvement efforts of the various groups in an organization so as to enable production and service at the most economical levels which allow for full customer satisfaction” Armand Feignbaum

50 DANGER HIGH RISK AREA