Measure Report Profile Project Planning 10.09.14.

Slides:



Advertisements
Similar presentations
HL7 Terminology Authority. Why Need to use existing terminologies rather than develop / maintain our own Availability of well maintained/structured terminologies.
Advertisements

MnM (and FHIR) Roundtable report Baltimore WGM Sept. 13, 2012.
QIDAM Issues and proposals for a logical model For discussion during HL7 WG Meeting in Jan 2014 Thursday Q3.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
© 2012 The MITRE Corporation. All rights reserved. For internal MITRE use 11 July 2013 Meeting #6 hData Record Format Task Force 1 © 2012 The MITRE Corporation.
Doc.: IEEE /0148r0 AgendaRich Kennedy, MediaTek Coexistence Lessons Learned IEEE Briefing Date: Authors: January 2015 Slide.
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
HL7 Ballot Process and FHIR DSTU2 Ballot Review
Submission doc.: IEEE /0089r1 January 2015 Steve Shellhammer, QualcommSlide 1 3GPP LAA Liaison Approval Process Date: Authors: Notice:
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
FEBRUARY 6, 2015 STANLEY M. HUFF, MD CHIEF MEDICAL INFORMATICS OFFICER INTERMOUNTAIN HEALTHCARE Meeting Planning and Next Steps.
Data Provenance Tiger Team May 27 th, 2014 Johnathan Coleman Johnathan Coleman - Initiative Coordinator Lynette ElliottLynette Elliott – Tiger Team Support.
FHIR TSC update May 12, 2015.
Facilitator’s Roundtable MnM report May Sunday Q3 - Planning Completed scheduling of WG sessions RIM ballot reconciliation – Finalized tooling and.
© 2012 Health Level Seven ® International. All Rights Reserved. HL7 and Health Level Seven are registered trademarks of Health Level Seven International.
Data Provenance Tiger Team May 9 th, 2014 Johnathan Coleman Johnathan Coleman - Initiative Coordinator Lynette ElliottLynette Elliott – Tiger Team Support.
Doc.: IEEE Submission May 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on March 2007 plenary meeting Work planned.
Workshop on How to Publish Data in VO ESAC, June 25-June Tips & tricks by the Ivoa Document Coordinator Bruno Rino
Data Provenance Tiger Team May 19 th, 2014 Johnathan Coleman Johnathan Coleman - Initiative Coordinator Lynette ElliottLynette Elliott – Tiger Team Support.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
Doc.: IEEE 802.RR-02/050 Submission March 2002 Vic Hayes, Agere SystemsSlide 1 SEC Closing meeting March 2002 Agenda item 4.6 Reply Comment to FCC.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
Data Provenance Tiger Team June 16, 2014 Johnathan Coleman Johnathan Coleman - Initiative Coordinator Lynette ElliottLynette Elliott – Tiger Team Support.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Standards & Interoperability (S&I) Structured Data Capture (SDC) FHIR Profile IG SWG.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Report December 14, 2015 doc.: /0055r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 14 December 2015 Authors:
Doc.: IEEE /0062r1 Submission May 2010 Joe Kwak (InterDigital)Slide 1 Logistics for July TVWS Workshop Date: Authors: Notice: This.
Data Provenance Tiger Team June 2, 2014 Johnathan Coleman Johnathan Coleman - Initiative Coordinator Lynette ElliottLynette Elliott – Tiger Team Support.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Regulated Product Submission Standard Overview Peggy Leizear FDA.
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
IEEE OmniRAN TG Status Report to IEEE 802 WGs
HL7 Pharmacy Report Paris, FR - May 2015
TG 1 March Session Closing Report
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE aj January 2016 Closing Report
IEEE TGa Project Timeline
Liaison Report Date: Authors: November 2009
SOA FHIR Action Items Creating SOA labeling standard/name space/naming convention for FHIR Operations. The expectation is that SOA FHIR services will be.
IEEE 11073/HL7 HCD Work Group – May 2016 Meeting Minutes Summary
IEEE TGz Vancouver Agenda
Emergency Care Work Group
IMT-2020 Contribution Content
Submission Title: TG4r Sept 2014 Closing Report
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
HL7 Business Architecture Model (PLA TSC Project)
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Preparing for NCPDP Joint Technical Work Group Meetings
Disclaimer The content in these slides represents the anticipated/targeted dates of incorporation or update of the standards used in the annual update.
802.11af Liaison Report Date: Authors: January 2012
<month year> <doc.: IEEE doc> January 2016
TGae Closing Report – May 2010
Knowledge artifact Specification Status & recommendations
TGac Status and Timeline
TGu Timeline Date: Authors: January 2005 January 2005
DSTU Update Process C-CDA R2.1.
FMG Report Co-chairs dinner
Patient Care Elaine Ayres, Stephen Chu, Jean Duteau, Laura Heerman Langford, Russ Leftwich, Michael Tan Paris WGM 2015 Monday.
IEEE SGa Project Timeline
Liaison Report Date: Authors: January 2012
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE White Space Radio Liaisons
Avoiding unnecessary delays in the WG Letter Ballot process
Patient Care WG Allergy and Intolerances Project
802.11af Liaison Report Date: Authors: January 2013
IEEE aj May Closing Report
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

Measure Report Profile Project Planning

Project Management Approvals (Chris) – CQI WG – approved on 9/16! – PMO – project created in Project Insight – FMG – approved on 10/8! – DESD? will follow up after FMG – TSC after FMG + DESD Identify Facilitators (____) – MnM don’t need but CQI WG should be getting a FHIR liaison soon – Vocab – Publishing Notice of Intent to Ballot (____) – Approval from CQI NLT Friday 10/31 – Due Sunday 11/2 12:00am ET

Review of Risks Recap of FMG discussions Incorporation into FHIR DSTU next year (time frame TBD) – Deadlines for profiles to be included FHIR DSTU? – Proposals for new resources and profiles end of sept. – Draft content 12/4 – Final content 3/30 Documentation on creating profiles coming soon from FMG QRDA/CDA on FHIR relationship Maturity FHIR

Next steps Time Frame Overview of CDA on FHIR changes to FHIR development version 10/2 conference callRick Start conceptual high level modeling of Profile 9/24 – 10/9all Start becoming familiar with using Forge9/24 – 10/9All Investigate Value Sets concernsall Review high level models10/9 conference callall Decide on using stable DSTU or development version 10/9 conference callall Write actual profile10/9 - 10/16 Test profiles10/16 – 11/13all January or May Decision?10/31 CQIall Develop corresponding QRDA examples10/30 – 11/13

Next steps(tbd) Time Frame draft to CQI list serv for review11/7 Review with CQI WG and interested WGs11/14 CQI WG callChris 2 nd review with CQI WG and interested WGs 11/21 CQI WG call final draft to CQI list serv for review11/31 Final Approval from CQI12/5 conference callChris Submit final approved content for ballot12/7

Tools and References Project Wiki: – Slides on authoring profiles – Forge: – HL7 publishing calendars – Questions for FMG – Google Doc Google Doc