Delays and the consequences and time management

Slides:



Advertisements
Similar presentations
Construction Delays & CPM Schedules
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ABC Change Orders College of Environmental Design
LPA Time Extension Guidance. The Department will grant time extensions when Work on the critical path is delayed and impacts the completion date Contractor.
Failure Rates: Source: BizMiner Building, heavy/highway, and specialty trade contractors In BusinessSurvivorsFailure Rate 853,372 (2002) 610,357.
DPS 304 : Procurement Management Purchasing Role in a Business System
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Time Is Money - Delay Claims in Construction June 18, 2012
PROJECT SCHEDULE PROJECT SCHEDULE Able to : a)Produce a network diagram based on the activities in a construction work b)Produce a network.
MANAGEMENT OF SMALL/MEDIUM FIRM Paweł Bilski Piotr Mazur Paulina Wawryca.
1 Quality in Contracting Dr. Tariq A. Aldowaisan; CSP, CQA, CQE, CQM/OE Gulf Lead Consultants Kuwait Electricity & Water Contractors Conference & Exhibition.
Getting Acquainted 1-2 Unit 4 Themes Understanding and reinforcing the rights and responsibilities of each party involved in a project. Understanding.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Avoiding disputes to deliver success What types of problem can escalate into disputes? Richard Bayfield FICE FCIArb ( Ice.org.uk.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Delay Claims from the Owner and Contractor’s Perspectives
PRODUCTIVITY Dr. Ahmed Elyamany.
Construction Industry. Salisbury Cathedral Taj Mahal.
Syed M. Ahmed, Ph.D. Department of Construction Management Risk Management in Construction Syed M. Ahmed, Ph.D. Department of Construction Management Florida.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Chapter 16 Capital Goods McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Project risk and control. Tender risk Programme and method – Tightness of completion LAD’s Extent of change – Construction method Temporary works Change.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
Introduction Time Quality Cost Project Constraints Success Introduction.
An-Najah National University Graduating project II Delay in construction projects.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 5 Advanced Techniques of CPM Deception and Mystery.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
King Fahd University of Petroleum & Minerals
Nguyễn Văn Tâm Bsc of Civil Engineering, 1997 (CTU, VN) Lecture notes: TU Delft, Holand Geotextile and Structural Experiment, 2000 Construction equipment.
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
FORMULATION & PRESENTATION OF EOT CLAIMS
CONSTRUCTION PROJECTS DELAY. Attitude of Contractor and CompanyAttitude of Contractor and Company Agreement between Contractors and consultantsAgreement.
Chapter Small Business Basics. Small Business Ownership ► Small Business-is an independent business with fewer than 500 employees ► The owner is.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Project Name: Web Content Management System for Macquarie University Macquarie University ITEC841-Project and Risk Management Semester 1, 2012 Presented.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Construction Eng 221 Project Management and Administration.
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
INTRODUCTION TO DEVELOPMENT LEARNING OBJECTIVES Discuss issues specific to the development and construction business. Identify the members of development.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
 understand that administration involves the storing, processing, retrieving and disseminating of information to support the business functions (i.e.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Completing Jobs Early ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Why Do Contractors Fail?. Failure Rates Source: US Census: Business Information Tracking Series.
Profession Practices (ECIV-5105)
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
PROJECT MANAGEMENT 2 Chu Eu Ho
Costs and Economics of Construction
ENGINEERING MANAGEMENT (GE 404)
Failure Rates. Failure Rates Failure Rates Building, Heavy/Highway, Specialty Trade Contractors % 29.3%
How to perform Time Impact Analysis / Window Analysis in Primavera P6
An - Najah national university Civil engineering department
Construction Contracts
‘ Causes of Delay During Construction Phase at Palestine ’
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Delays and the consequences and time management Luise Lorenz Christina Mohr

DELAYS Completion of a project in time and within budget is a common goal of contractor and client Delays  failure of budget  disputes (time = money) Delayed completion of work compared to the planned/contract schedule (= loss of time) It’s possible to make up time by working faster or rearranging the work sequence Contractor related delays are the most significant ones

GENERAL REASONS FOR DELAYS Delays can be caused by one or more of the following agencies: Client and his team-mates Contractor and his team-mates Nature (i.e. earthquakes) Due to a third party (i.e. strike)

SOME REASONS FOR DELAYS faults in documents, designs or decisions insufficient number of equipment inaccurate cost or time estimation poor site management and supervision shortage of construction materials incompetent project team contractor’s/client’s financial difficulties etc.

TYPES OF DELAY The following types of delay help to determine the impact of a delay on the project. critical or non-critical excusable or non-excusable concurrent or non-concurrent compensable or non-compensable

1. CRITICAL or NON-CRITICAL Critical delays: the delay interferes with the total time frame Non-critical delays: the delay does not interfere with the total time frame

2. EXCUSABLE or NON-EXCUSABLE Excusable delays delay caused by the client, e.g. the owner denies access to the site delay caused by strike, fire, unusual weather etc. Non-excusable delays: delay caused by the sub-/contractor, e.g. not enough manpower on site to complete the job in time

3. CONCURRENT Concurrent delays: two or more delay events occur at the same time or overlap to some degree at least one of the delays has to be caused by the contractor and one by the client Non-concurrent delays: delays do not overlap

4. COMPENSABLE the client’s failure to coordinate several prime contractors the client’s failure to provide adequate access to the project change orders placed by the client any interference by the client delays caused by a third party under the control of the client

CONSEQUENCES The claim depends on the cause of the delay, which must be identified. Therefore the responsibility is being clarified. Possible Claims: Time extensions (for the contractor) Financial compensations (for client and contractor)

FOLLOW-UP For the client: For the contractor: Delay in use of project Capital is blocked Escalation in subsequent investment For the contractor: Delay in getting profit Idle of resources (machines, workers etc.) Productivity loss due to uncontracted work period

MINIMIZING DELAYS Identifying the cause that led to the delay Providing enough financial resources Competent project management Resource availability Frequent progress meetings Choosing the right (experienced) consultants, suppliers and contractors Accurate cost estimation etc.

TIME MANAGEMENT Part of the construction budgeting process Project management team determines the amount of time which is needed for the project Determining the amount of man hours and employees Major role for cost estimation

Thank you!

References Singh, P. (n.d.). Delay in construction project and its consequences. Retrieved from http://www.scribd.com/doc/6106511/Delay-in-Construction-Projects- and-Its-Consequences Ibbnu Abbas, M. (2006). Causes and effect of delays in aceh construction industry. Retrieved from http://eprints.utm.my/5304/ Cooke, B., & Williams, P. Construction planning, programming and control. Wiley-Blackwell.