Cingular Case Studies September 24, 2007. 2© 2007 BearingPoint, Inc.IM – Content, Portals and IntegrationCommunications and Utilities AT&T B2B Wireless.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
Statistical Process Control for the Medical Industry.
AACE Goals Goals as identified by AACE’s Board of Directors for
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Agile development By Sam Chamberlain. First a bit of history..
Internet Management Consultants and Solution Providers Outstanding CMS Projects Lessons from the Front Line.
1. Failure is when users do not feel they get what they paid for. 2. Failure is when the overall organization fails to adopt the solution.
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
Unit Five – Transforming Organizations
September 2001Chapter 10: B2B Grows Up Key questions answered in this chapter: What are the four stages to the evolution of B2B capabilities? What are.
Karolina Muszyńska Based on
Why Managers Must Understand IT Managers play a key role –Frame opportunities and threats so others can understand them –Evaluate and prioritize problems.
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
Supplement 02CASE Tools1 Supplement 02 - Case Tools And Franchise Colleges By MANSHA NAWAZ.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Lean Manufacturing Case Study Prototype Design-Build.
Lesson 10: IT Project and Program Management. Lesson 10 Objectives  Identify resources for technical data  Identify project management fundamentals.
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
Web Design Process CMPT 281. Outline How do we know good sites from bad sites? Web design process Class design exercise.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Key questions answered in this chapter:  What are the four stages to the evolution of B2B capabilities?  What are the three categories of B2B?  Describe.
Requirements analysis Speaker: Chuang-Hung Shih Date:
Bogdan Lazaroae: Using technology for improved decision making Bucharest, Romania, May 30, 2007 From Call Data.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
OneView Benefits Sales collaboration across network A “one-stop” utility portal Ease of use, scalability & accessibility Useful reports and metrics Improved.
Best Practice OSNI – CAMEO project (Customer Access to Maps Electronically Online)
Dr. Ralph R. Young Director of Software Engineering Systems and Process Engineering Northrop Grumman Information Technology (703)
Software Waterfall Life Cycle Requirements Construction Design Testing Delivery and Installation Operations and Maintenance Concept Exploration Prototype.
1 REQUIREMENT ENGINEERING Chapter 7. 2 REQUIREMENT ENGINEERING Definition Establishing what the customer requires from a software system. OR It helps.
Business Analysis and Essential Competencies
Bennett Adelson. Microsoft Solution Center. Independence OH February 4, 2010 BENNETT ADELSON Microsoft® Solution Center.
Globalizing Content for Online Security Stephan Cocron Global Content Manager VeriSign, Inc.
Requirements Engineering Requirements Elicitation Process Lecture-8.
International Center for Agricultural Research in the Dry Areas Web strategy ICARDA2.0 :: re-design project 1.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
IT Requirements Management Balancing Needs and Expectations.
1561 INITIATIVE Lessons Learned and Future Considerations
1 Software Process Models-ii Presented By; Mehwish Shafiq.
Heuristic evaluation Functionality: Visual Design: Efficiency:
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
Web Site Usability. Benefits of planning usability Increased user satisfaction, which translates directly to trust and brand loyalty Increased user productivity,
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Project Portfolio Management Business Priorities Presentation.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Virtually Agile Astro Sabre (Matt Ganis) IBM, Senior Technical Staff Member Hawthorne, NY - September 20, 2007.
Installation and Maintenance of Health IT Systems Unit 8b Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Confidential and Proprietary 1 Project Management using Scrum at Wachovia.
Creating & Building the Web Site Week 8. Objectives Planning web site development Initiation of the project Analysis for web site development Designing.
An Agile Requirements Approach 1. Step 1: Get Organized  Meet with your team and agree on the basic software processes you will employ.  Decide how.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Perfecto We help customers deliver exceptional digital experiences.
V7 Foundation Series Vignette Education Services.
Powerpoint Templates Page 1 Powerpoint Templates Get Up to Date Effective Website And Build a More Robust Ecommerce Business.
 The processes used for RE vary widely depending on the application domain, the people involved and the organisation developing the requirements.  However,
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
THE PRESENT AND FUTURE nopCommerce  .
B2B VERSION 1.0: Recent Updates B2B VERSION 2.0 Relaunch Oct 3, 2016
About Client Client is a pioneer in industry that provides catastrophe risk modeling, real-time risk exposure and risk management through available live.
Identify the Risk of Not Doing BA
Tech Genuine offers interactive and feature-rich ecommerce website solutions which enable clients to market their products and services online. We specialize.
By Jeff Burklo, Director
Improving Communication and Collaboration Across the School District
Presentation transcript:

Cingular Case Studies September 24, 2007

2© 2007 BearingPoint, Inc.IM – Content, Portals and IntegrationCommunications and Utilities AT&T B2B Wireless eCommerce Web Design Process Web Design Process Store Re-Design Store Re-Design Content Management Content Management

3© 2007 BearingPoint, Inc.IM – Content, Portals and IntegrationCommunications and Utilities Case Study: Web Design Process Challenge n Existing people and processes couldn ’ t manage the timely transformation of business and system changes. Communication within teams involved in projects was often fractured and inconsistent and projects weren ’ t prioritized across teams or properly scoped. n Development resources could not interpret requirements accurately and often required excessive communication for clarification. n Requirements often required rework during development. Solution n Developed a new intake process for business teams and product owners to engage the requirements and design teams. n Provided skilled staff to provide a bridge between business and development resources to enhance requirements, design and project management capabilities. n Introduced use cases as a way to refine the functional requirements and clearly communicate business needs to the development teams. n Introduced agile design techniques with the use of rapid prototyping to define functional specifications and conduct usability studies. n Developed advanced methods for assuring traceability and commitment to quality with the highest degree of user experience engineering. Results Improved standards, traceability and capacity for the design and requirements teams. Reduced rework of requirements through development time and achieved less than 2% rework after User Acceptance Testing. Reduced average project delivery time by 6 weeks Implemented a design “ toolkit ” to expedite new projects and standardize requirement and design documents. Collaboratively trained 20+ resources on agile/rapid web design concepts.

4© 2007 BearingPoint, Inc.IM – Content, Portals and IntegrationCommunications and Utilities Challenge n Company wasn ’ t fully realizing the value from its online channel. It wanted to quickly implement a new eCommerce operating vision and transform it ’ s user experience. n ForSee surveys consistently revealed that many users had problems with the navigation and function of the eStore site or “ buy flow ”. n Log analysis revealed that there was a high rate of dropout through the buy flow funnel and shopping cart abandonment. Solution n Conducted an extensive analysis of the usability of the buy flow and provided a comprehensive heuristic review. n Developed As-Is process map to clearly define improvement areas. n Redesigned the interactive flow of the shopping experience to maximize usability and address issues that were critical to quality as expressed by customers. n Authored use cases to clearly define the functional aspects of the redesign and bridge a gap between the communications between the business stakeholders and IT development resources. n Developed visual artifacts to accurately communicate the look and feel of the new eCommerce experience. n Worked with business stakeholders and IT developers to assure that new application met all requirements through User Acceptance Testing before it was released in production. Results B2B eCommerce sales (gross adds) have increased over 20% since launch of new buy flow. This extremely complicated project was executed without any major delays or scope changes. The redesign effort had very few post-release issues in comparison to prior releases. Application was developed in record time (Reduced average project delivery time by 6 weeks) Case Study: B2B eStore Re-Design

5© 2007 BearingPoint, Inc.IM – Content, Portals and IntegrationCommunications and Utilities Challenge n Company has thousands of customized eCommerce sites that provide customers with their own shopping experience. n Customized sites are based on a complex set of relational rules which govern everything from pricing to product availability. n A vendor system is used to manage these complex rules and but it is cumbersome and allows users to save mistakes that can inadvertently bring down these sites. n The vendor system is extremely complex and requires extensive training and guidance with a 95 page step by step training document. n User errors account for a great amount of system downtime. Solution n Developed As-Is process map to clearly define improvement areas. n Identified all common user errors and identified all the correct business rules to assure that catastrophic errors do not occur. n Designed a new front end application to interact with vendor system which does not allow user to enter any data that conflicts with the system and cause an outage. n Developed comprehensive prototype to conduct usability testing and provide integrated page specifications. n Worked with offshore team to provide all visual design specifications. Results Eliminated all user error induced outages. Decreased time to create custom shopping site by more than 60%. Reduced training time by more than 90%. Since use of tool prevents catastrophic events, trainees can do real work while they learn. Case Study: B2B Content Management