More Variable Control Charts A. A. Elimam. What about the Short Run? n n X-bar and R charts track process with long production runs or repeated services.

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Statistical Process Control
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Statistical Process Control Operations Management Dr. Ron Lembke.
BPT2423 – STATISTICAL PROCESS CONTROL
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Slide 1 Choosing the Appropriate Control Chart Attribute (counts)Variable (measurable) Defect Defective (MJ II, p. 37) The Lean Six Sigma Pocket Toolbook,
Statistical Process Control Control charts Quality Quality is an old concept Artisan’s or craftsmen’s work characterised by qualities such as strength,
Agenda Review homework Lecture/discussion Week 10 assignment
Chapter 18 Introduction to Quality
Introduction to Control Charts.
Statistical Process Control Managing for Quality Dr. Ron Lembke.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
originally developed by Walter A. Shewhart
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
Using Control Charts to Keep an Eye on Variability Operations Management Dr. Ron Lembke.
15 Statistical Quality Control CHAPTER OUTLINE
IE 355: Quality and Applied Statistics I Short Run SPC
X-bar and R Control Charts
Control Charts for Moving Averages
Control Charts Other Variable Control Charts Chapter Seven.
Statistical Process Control
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Variables Control Chart Chapter 10. Variables Control Chart Dr. Walter Shewhart ( ) –Father of Statistical Process Control –Inventor of Control.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Control Charts An Introduction to Statistical Process Control.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
 We will now consider the precontrol chart and the individual X and MR chart.  Techniques are similar to the charts we.
Statistical Quality Control
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
Quality Control  Statistical Process Control (SPC)
In the name of Allah,the Most Beneficient, Presented by Nudrat Rehman Roll#
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Statistical Quality Control
Process Control Charts
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
POPULATION VERSUS SAMPLE
Chapter 7 Process Control.
10 Quality Control.
TM 720: Statistical Process Control
Agenda Review homework Lecture/discussion Week 10 assignment
Other Variable Control Charts
What is the point of these sports?
CHAPTER 6 Control Charts for Variables
Statistical Process Control
Process Capability.
Objectives Discuss advantages of a control chart over a run chart Describe how to set limits and revise limits on a control chart.
Statistical Process Control
Presentation transcript:

More Variable Control Charts A. A. Elimam

What about the Short Run? n n X-bar and R charts track process with long production runs or repeated services n n No. of sample measurements : Insufficient to create either chart n n Would SPC ideas apply to new processes or short runs? n n What happens when only one sample is taken from a process? n n Situations when the traditional X-bar, R and S charts cannot be used.

Individual & Moving Range Charts When ? n n data is collected once per period n n single value measurement n n few units of each product n n individual Values Chart Plot Individual measurements, X iPlot Individual measurements, X i X-bar is the average of all X iX-bar is the average of all X i

Individual & Moving Range Charts n n Moving Range Chart Value-to-value difference of individual data, R iValue-to-value difference of individual data, R i R-bar is the average of all R iR-bar is the average of all R i (m-1) ranges(m-1) ranges Plot Individual measurements, R i starting on the second observationPlot Individual measurements, R i starting on the second observation

Individual & Moving Range Charts Control Limits n n Individual Charts x = X + R UCL x = X R x = X - R LCL x = X R n n Moving Range Charts R = R UCL R = 3.27 R R = LCL R = 0 n n At least 80 samples n n Interpret similar to traditional charts

Moving-Average & Moving-Range Charts n n Combine n individual values to form a group n n Create average & range per group n n Moving: new value in- oldest one out n n Find UCL, LCL & Process Capability using the same methods for traditional control charts (TCC)

Moving-Average Charts n n Moving Average smoothes out short term variation n n User Concentrate on trends n n Mostly used for seasonal products n n Always lag behind changes in process n n Best when process changes slowly

A Chart Plotting Individual Values n n Explains concept of variation compared to the average n n Picture worth 1000 words n n Useful in training staff on interpreting R or S charts

Median and Range Charts n n Study process variation n n Steps: record subgroup measurements rank in decreasing order find median & range in each subgroup Median Chart Center = all medians AVG Range Chart Center = all ranges AVG Determine UCL & LCL for the Median & Range Charts

Median and Range Charts n n Median Charts: Md = Md + 6 Md UCL Md = X Md + A 6 R Md Md = Md - 6 Md LCL Md = X Md - A 6 R Md n n Range Charts R = 4 Md UCL R = D 4 R Md R = 3 Md LCL R = D 3 R Md n n Record Median & Range on chart n n Interpret Charts similar to TCC

Run Charts n n Monitor changes in a particular characteristic over time n n Can be used for Variable or Attribute n n Data: measurements, counts, subgroup averages n n Easily spot trends, runs and other patterns

Run Charts: Steps n n Identify time increments to study process n n Scale the Y axis to reflect values n n Collect data n n Record data on chart n n Interpret the chart (limited to looking for data patterns) n n No out of control points

Variable Subgroup Size Charts n n Subgroup size, n, Varies n n Re-compute Control Limits (CL) for each n n n As n increases - CLs closer to center n n Too many calculations n n Limit the useful of this chart

Precontrol Charts n n Compare product made against tolerance limits n n Assumes process is capable of meeting specifications n n Uses specifications for limits n n More false alarms or missed signals n n Simple to setup

Precontrol Charts n n Useful for setup operations or short production runs n n Less powerful than TCC n n Provide little about actual process performance n n Cannot be used in problem solving or calculating process capability

Precontrol Charts n n Use Portion of Tolerance Spread (PTS) to account for difference in spread for individuals and averages n n Desired Process Capability (PC) dictates this portion: PC index PTS 1.2(100/1.2) = 83 % 1.1(100/1.1) = 90 %

Precontrol Charts: Steps Create the zones for the used PTS Place USL, LSL and center (SC) on chart Divide (USL-SC) in 2 equal zones: green- yellow Divide (SC-LSL) in 2 equal zones: green- yellow Green zones (GO SECTION) are next to center Yellow zones (CAUTION) are next to the limits Zones above or below yellow area are colored in RED (UNDESIRABLE)

Precontrol Charts: Steps Take measurements & apply setup rules n n Record and plot measurement n n If measured piece is in green zone-continue running inside limits but outside green zone-check next piece second piece is also outside green zone-reset process in red zone, stop, make corrections & reset process n n If 2 successive pieces fall outside green zone, one high and the other low, reduce variability n n Whenever process is reset, need 5 successive pieces inside the green zone before sampling

Precontrol Charts: Steps Apply the precontrol sampling plan n the green zone- begin running the job n If 5 pieces in a row fall in the green zone- begin running the job n Use the run rules, randomly sampling 2 pieces at intervals to monitor process n For example: Sampling Two PARTS every 15 minutes. n Suggest Sampling >= 25 pairs after setups n Repeat whenever the process is reset

Short-Run Charts n n TCC : effective in long continuous operations n n Real life: need to switch products (FMS) n n Use Short-Run charts n n Different Methods: First and last pieces 100 % inspection (costly, maybe inaccurate) TCC for each part # & each different run of each part # (many charts- little information)

Nominal X-bar and R Charts n n Uses coded measurements based on nominal dimension. For example “Print Dimension” of 3.75 (+ or -) = 3.75 n n Shows process centering and spread n n Assumes similar variations for each of the part numbers n n If variation of a part > 1.3 R-bar, then it must be plotted on a separate graph

Nominal X-bar and R Charts Steps n n Identify parts monitored using same chart (same operator, machine, material,...) n n Find nominal spec. for each part n n Collect data using same subgroup size for all parts n n Coded X i = measured value-nominal value n n Calculate X-bar for each subgroup

Nominal X-bar and R Charts Steps n n Plot all X-bars on the chart n n Continue the above for the entire run of this particular part number n n Repeat the above for another part number n n If the number of subgroups (from any combination of parts) >= 20, calculate the control limits

Nominal X-bar and R Charts Steps n n Centerline = Average of all coded X-bars n n Control limits: Nominal X-bar Chart x = + 2 UCL x = Centerline + A 2 R x = - 2 LCL x = Centerline - A 2 R n n Control limits: Nominal range Charts R = 4 UCL R = D 4 R R = 3 LCL R = D 3 R n n Draw center and CL on the chart n n Interpret the chart

Nominal X-bar and R Charts n n Most useful when FOR ALL PARTS Subgroup size, n, is the same Nominal is the most appropriate target value n n Control charts should be selected based on: What aspect of process need to be monitored. Identifying the chart that best meet such need.