Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.

Slides:



Advertisements
Similar presentations
ET-meeting, 22 th Oct N. KIMURA/KEK The Latest Status of the KAGRA Cryogenics N. KIMURA A, D. CHEN B, T. KUME A, S. KOIKE A, Y. SAKAKIBARA B, T.
Advertisements

Status Report to ATF2 Technical Board Brett Parker, BNL-SMD URL : 11th ATF2 Project.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Brett Parker Brookhaven National Laboratory Superconducting Magnet Division 20 October 2010 ILC QD0 R&D Update IWLC2010 International Workshop on Linear.
ATF2 test facility Andrei Seryi, SLAC for the ATF2 team to be presented to ILC Accelerator Advisory Panel April 19, 2009.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007.
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
Presented by, Brett Parker, BNL-SMD QD0 Prototype Status.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK May, 2007.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Brett Parker* BNL-SMD *For BNL Superconducting Magnet Division and the ATF2 Superconducting Magnet Upgrade Collaboration ILC Superconducting Final Doublet.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 Heat load for a beam loss on the superconducting magnet Yosuke Iwamoto, Toru Ogitsu, Nobuhiro Kimura, Hirokatsu Ohhata, Tatsushi Nakamoto and Akira Yamamoto.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Cryogenic System for Superconducting Final Focus Magnets* at ATF-2
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
ILC IR FINAL FOCUS & EXTRACTION MAGNETS Prepared by Andy Marone ILC Workshop, Sept
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Summary: Detector Integration/Engineering/MDI Marco Oriunno (SLAC), May 31, 2013 ECFA Linear Collider Workshop 2013, DESY.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –16/Dec./2009 at ATF2 TB meeting ) 1 Cryogenic System for Superconducting Final Focus Magnets (SCFFM) at.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
ATF2 Meeting December Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October participants from 3 regions! LAPP/Annecy in.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
20 April 2010 “ATF2 SC Magnet Upgrade Update,” Brett Parker, BNL-SMD 1 ATF2 SC Magnet Upgrade Update Brett Parker, BNL-SMD One hour ATF2 SC FD Webex meeting.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Beam Delivery System Summary Andrei Seryi LCWS 2010 / ILC 2010 March 30, 2010.
Alignment and stability session
S-BPM Support Issues to be discussed with LAPP and KNU
Yingshun Zhu Accelerator Center, Magnet Group
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
presented by Brett Parker, BNL-SMD
Anti-DID, Anti-Solenoid and QD0: MDI Issues and Opportunities
SLHC –PP WP6 LHC IR Upgrade - Phase I.
SLAC 1:30 Monday meeting June 18, 2007 A.Seryi
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
report from 12th ATF TB & SGC meeting and trip to KEK
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
CLIC-ILC BDS & MDI work.
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
Beam-based alignment measurements
ATF2 review R. Tomas ATF2 review web:
Updates on IR and FF for super-B factory
Beam Delivery System Schedule at ILC2010
Summary for the Sources working group
First look at final focus part of super-B factory
Presentation transcript:

Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule

A Superconducting Magnet Upgrade of the ATF2 Final Focus: Collaboration List 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 2 Michael Anerella, John Escallier, Ping He, Animesh Jain, Andrew Marone, Brett Parker, Peter Wanderer, and Kuo- Chen Wu (BNL), Rogelio Tomas Garcia, Claude Hauviller, Eduardo Marin Lacoma and Frank Zimmermann (CERN), Nobuhiro Kimura, Kiyoshi Kubo, Tatsuya Kume, Shigeru Kuroda, Toshiyuki Okugi, Junji Urakawa, Toshiaki Tauchi, Nobuhiro Terunuma, Takayuki Tomaru, Kiyosumi Tsuchiya and Akira Yamamoto (KEK), Philip Bambade (LAL), Andrea Jeremie and Benoit Bolzon (LAPP), Paul Coe and David Urner (Oxford University), Andrei Seryi, Cherrill Spencer, and Glen White (SLAC) Co-Spokesmen: Brett Parker (BNL), Andrei Seryi (SLAC) and Toshiaki Tauchi (KEK)

ATF2 Coil Winding Status 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 3 Winding Schematic for ATF2 Quad Two coil sets are complete

B-Field Harmonic Content (Units: at R ref of 25 mm) Measured After Winding Two Coil Sets 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 4 Quad’Sext’

Cryogenics Interface Status 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 5 New box at ATF2 with cryocoolers, control valves, current leads etc. for 4.2K operation. ATF2 magnet & cryostat design (BNL Produced) 4.2K LHe Interface Cryo’ interface as discussed at ALPG’09. A lot of progress was made at a recent all day meeting held at BNL. Meet at BNL

Cryogenics Interface Status 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 6 New box at ATF2 with cryocoolers, control valves, current leads etc. for 4.2K operation. ATF2 magnet & cryostat design (BNL Produced) 4.2K LHe Interface Cryo’ interface as discussed at ALPG’09. ATF2 Option 1 (now the preferred option) (now the preferred option) Service Cryostat Under Construction at BNL ATF2 Option 2 Develop option that allows for ILC-like 1.9K tests at BNL and 4.2K operation at ATF2 (KEK) with cryo-coolers.

Laser View Port Interface Status 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 7 Calculate the 3D Magnetic Field with Shield With newest heat shield design it is fairly straightforward to add laser viewing ports. At our recent “Face To Face” meeting we tentatively decided to have these ports positioned at the respective magnetic centers. Before making a final decision we have to evaluate the impact of putting small holes in the quadrupole magnetic shield.

ILC R&D Prototype & ATF2 Comparison 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 8 ATF2 Upgrade Magnet ILC QD0 Full-Length R&D Prototype Magnet Both magnets will be tested at 1.9K with the ILC-style Service Cryostat (SC) at BNL. The ATF2 magnet will be tested at BNL at 4.2K both with SC and ATF2 Cryogenic Box before being shipped to KEK. The ATF2 magnet can be tested with beam; we do not have a way to test R&D prototype with beam.

ATF2 Coil Package Information 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 9 Have complete set of correctors to shift magnetic center of the quadrupole and sextupole independently (like ILC). For “Pushed-Beta” will also evaluate options for higher order correctors.

Presentation Summary 16 December 2009 at the 9th ATF2 Project Meeting “Update on SC Magnets and Schedule,” Brett Parker, BNL-SMD 10 Recently the ATF2 Superconducting Magnet Upgrade Collaboration has grown considerably* and a lot of progress has been made recently (esp. during the face-to-face meeting) both in terms of coil production and fine tuning parameters to enable a robust experimental program. *Please contact me if you want to be added to the collaboration (or possibly just the mailing list).