2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Goshen Area Bus Reconfiguration
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
PacifiCorp-CAISO EIM Initiative Overview
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Turkish Power System Overview March 2012
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
The Impact of Renewable Energy, Distributed Generation, Storage & Energy Efficiency on the Grid Southern California Energy Summit Governor Angelina Galiteva.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
Updated 1/28/2011.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
How the Transmission System Works Really William F. Reinke.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
An Overview of Demand Response in California July 2011.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Operations Update ERCOT Board Meeting March 18, 2003.
2015 IEPR Lead Commissioner Workshop Southern California Reliability University of California, Irvine August 17, 2015 Tom Doughty Director, State Regulatory.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
1 A Conversation about MISO Paul Spicer November 8, 2007.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Transmission Planning in ERCOT- Overview
Wind Management at MISO
Overview of the NYISO Demand Response Programs
MIT tour of the California ISO Control Center March 31, 2015
California ISO’s CIM Based Model Management
Forecasting and Operations CAISO Case
Solar Energy Commercialization
Jim Mcintosh Director, Executive Operations Advisor California ISO
The Future Grid and Energy Storage
Presentation transcript:

2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013

ISO history ISO’s and RTO’s created following the 1992 passage of the Federal Energy Policy Act The California ISO was created in September 1996 as a nonprofit public benefit corporation with the passage of California Assembly Bill 1890 March 1998 began serving 80 percent of the state Page 2 California ISO Overview

NERC Interconnections Page 3

38 Balancing Authorities in the West Page 4

California ISO service area is diverse  58,698 MW of power plant capacity  50,270 MW record peak demand (July 24, 2006)  26,500 market transactions per day  25,627 circuit-miles of transmission lines  30 million people served  309 million megawatt-hours of electricity delivered annually Page 5

Reliability Markets Day Ahead – opens 7 days prior to the operating day –closes at 10 a.m. the day before electricity flows. Real Time –Hour Ahead Scheduling Process (HASP) Prior to real-time (RT) market, schedule energy and ancillary services for static interchange for 24 individual hours –Real-time market (RTM) runs every five minutes Page 6

High-tech control centers The ISO operates two control centers, main headquarters in Folsom and a second control room in Alhambra Operators staff the control center 24/7 six rotating shifts (12 hours). (6 to 6) Page 7

Historical ISO Peak Demand Slide 8

2013 ISO 1-in 2 Peak Load Forecast The ISO peak demand is projected to reach 47,413 MW 738 MW more than the actual peak 46,675 MW recorded in 2012 (2.3 percent higher) 3,393 MW of new generation since last year’s report 2013 Summer Loads Resources Assessment Slide 9

Slide 10

Slide 11

Slide 12 The ISO system and the NP26 and SP26 zonal results are fairly similar to results in last year’s report The areas facing reliability risks during heat waves and other adverse conditions continue to be southern Orange County and San Diego. SUMMARY OF KEY FINDINGS

Overview of the area and summer reliability challenges without the San Onofre nuclear power plant Slide 13

Key actions to mitigate local reliability concerns in southern Orange County and San Diego: Conversion of Huntington Beach Units 3 & 4 to Synchronous Condensers Installation of additional reactive support near SONGS – installation of 80 MVAR capacitors at each of the Santiago and Johanna substations and a 160 MVAR capacitor at the Viejo substation. Barre-Ellis reconfiguration –reconfiguring the Barre-Ellis 220 kilovolt (kV) lines from the existing two circuits to four. Slide 14

Operational Challenges Page 15

System Emergency (Procedure 4420) Restricted Maintenance Operations –cancel or postpone any or all or work to preserve overall System Reliability Transmission Emergency –any event that threatens, harms, or limits the capabilities of any element of the transmission grid and overall grid reliability OP 4420 Page 16

System Emergency (Procedure 4420) Alert Notice –issued by 1500 hrs the day before anticipated operating reserve deficiencies Warning Notice –issued when the Real-time Market run results indicate that Operating Reserves are anticipated to be less required Page 17

System Emergency (Procedure 4420) Emergency Stage 1 –Operating Reserve shortfalls exist or are forecast to occur, and available market and non-market resources are insufficient to maintain Operating Reserve requirements Emergency Stage 2 –cannot maintain its Non-Spinning Reserve requirement Emergency Stage 3 –Spinning Reserve portion depletes, or is anticipated to depleted Page 18

Questions? Jeffrey S McDonald Interregional Coordination Team Facilitators