TARGET AFFORDABILITY AND CONTROL COST GROWTH David G. Ahern Portfolio Systems Acquisition Office of the Assistant Secretary of Defense (Acquisition) April.

Slides:



Advertisements
Similar presentations
Presentation for ASMC PDI 2010 June 4, 2010 Thomas Hessel Office of the Under Secretary of Defense for Personnel and Readiness Requirements and Program.
Advertisements

SHOULD-COST TEMPLATE See notes pages on subsequent slides for key points and tailor format as appropriate to suit the particular initiatives of program.
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
Better Buying Power: Guidance for Obtaining Greater Efficiency and Productivity in Defense Spending.
1 The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter. Understand.
CLINTON COMMUNITY SCHOOL DISTRICT. MISSION STATEMENT The Clinton Community School District, proud to be in partnership with family and community, is committed.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
The Medium Term Expenditure Framework
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Air Force Cost Analysis in 2011 Mr. Rich Hartley Deputy Assistant.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
Tuition & Aid Advisory Board A Discussion of UCB Priorities and Funding Strategies September 27, 2004.
Core Performance Measures FY 2015
Program Visibility, Analysis, and Reporting (PVAR)
Tools used by Entrepreneurs for Venture Planning
For Official Use Only (FOUO) Joint Program Executive Office for Chemical and Biological Defense Chemical Biological Defense Acquisition Initiatives Forum.
CONTRACTOR MANPOWER REPORTING
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
1 Professional Development Discussion: OSD Study of Program Manager Training and Experience Mr. David Ahern Director, Portfolio Systems Acquisition OSD(AT&L)(A&T)(PSA)
N By: Md Rezaul Huda Reza n
“WHY AFFORDABILITY IS A SYSTEMS ENGINEERING METRIC” Quentin Redman Director – Solutions Architect PRICE Systems L.L.C.
Environment, Safety and Occupational Health (ESOH) in the DoD Business Management Modernization Program April 2005 John Coho I&E Business Transformation.
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Capital Planning and Investment Control (CPIC) Revisions to the Construction.
JPEO-CBD Update to the Chemical and Biological Acquisition Initiatives Forum: The Changing Strategic Environment September 10, 2010 Mr. Douglas Bryce.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
MEMORANDUM TO: The Defense Industrial Base FROM: Brett B. Lambert, Director, Industrial Policy July 13, 2010 “The Department is committed to working with.
0 Achieving Dominant Capabilities through Technical Excellence and Innovation Better Buying Power 3.0.
RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer Naval Probability of Program Success (PoPS)
Stuart A. Hazlett Deputy Director, OUSD(AT&L) Defense Pricing Defense Procurement and Acquisition Policy A Presentation to NCMA Pentagon 8 September 2011.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
ARA Conference March 28, 2012 | 1DISTRIBUTION STATEMENT A -- Cleared for public release by OSR on 27 March SR case # 12-S-1515 applies Nicholas.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
UNCLASSIFIED The Analytics of Tough Choices Christine Fox, Director 12 April 2011.
0 17 Nov 2010, V2.1 Bill Parker Director for Acquisition & Program management Better Buying Power: Guidance for Obtaining Greater Efficiency and Productivity.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
Guidance Roadmap Target Affordability and Control Cost Growth -Mandate affordability as a requirement -Implement “should cost” based management -* AT&L.
The Planning, Programming, Budgeting and Execution (PPBE) Process
Sea Enterprise Right Force Right Readiness Right Cost RDML Bill Kowba Projecting decisive joint capabilities! Sea Power 21 NDIA.
State IT Agency Briefing on Annual Report 2014/15 to Parliamentary Portfolio Committee on Telecommunications and Postal Services 16 October 2015.
Materiel Development Decision (MDD) Information Requirements
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
Changing Landscape…… 1 What was once performed by uniformed military may now be provided by contractors Contractors perform vital services in support of.
CGSIC International Subcommittee Prague, Czech Republic March 14, 2005 Michael E. Shaw Director, Navigation and Spectrum Policy U.S. Department of Transportation.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
BBP Mar 13 Better Buying Power 2.0 Achieve Affordable Programs Mandate affordability as a requirement Institute a system of investment planning to derive.
1 Integration of Process Initiatives And Assessments Common Process Framework Integration of Management System Standards and Initiatives (QMS/CMMI/Lean/PMBP)
Approve a Market Adjustment to the City of Southlake Employee Compensation Program Item 9B.
Role Responsibilities
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Measuring Impact Guide
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Implementing Will-Cost & Should-Cost Management
Parliament and the National Budget Process
Guiding Principles The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter.
MEMORANDUM FOR ACQUISITION PROFESSIONALS
Financial Bootcamp – Module 4 Affiliate Budgeting
Program Visibility, Analysis, and Reporting (PVAR)
Changing Landscape…… What was once performed by uniformed military may now be provided by contractors Contractors perform vital services in support of.
Information Required for Milestone and Decision Reviews
Weapons System Lifecycle Management (WSLM) Information Brief
Digital Government Initiative Initiation Department of Information Technology Estevan Lujan, Acting Cabinet Secretary Susan Pentecost, Managing Director,
Economic Development Department Annual Financial Statements 2011/12
Capability Maturity Model
NIGP 2014 Public Procurement Benchmark Survey
U.S. Army Contracting Command
Capability Maturity Model
Presentation transcript:

TARGET AFFORDABILITY AND CONTROL COST GROWTH David G. Ahern Portfolio Systems Acquisition Office of the Assistant Secretary of Defense (Acquisition) April 12, 2011

2 Excerpts from Secretary Gates January 6, 2011 Speech America is at war and confronts a range of future security threats, it's important not to repeat the mistakes of the past by making drastic and ill-conceived cuts to the overall defense budget. At the same time, it is imperative for this department to eliminate wasteful, excessive and unneeded spending, to do everything we can to make every defense dollar count. The goal was, and is, to sustain the U.S. military's size and strength over the long term by reinvesting those efficiency savings in force structure and other key combat capabilities.

3 Excerpts from Secretary Gates January 6, 2011 Speech (con’t) Not every defense program is necessary, not every defense dollar is sacred and well spent, and that more of nearly everything is simply not sustainable. The Defense Department will continue to see real, albeit steadily diminishing, growth for the next three fiscal years before flattening out in the fourth and fifth year. What is important is to have a budget baseline with a steady, sustainable and predictable rate of growth that avoids extreme peaks and valleys in defense spending that can be enormously harmful to readiness, planning and financial management.

4 Mandate for Restoring Affordability and Productivity in Defense Spending (USD(AT&L) June 28, 2010 Memo) Deliver the warfighting capability we need for the dollars we have Get better buying power for warfighter and taxpayer Restore affordability to defense goods and services Improve defense industry productivity Remove government impediments to leanness Avoid program turbulence Maintain a vibrant and financially healthy defense industry Obtain 2-3% net annual growth in warfighting capabilities without commensurate budget increase by identifying and eliminating unproductive or low-value-added overhead and transfer savings to warfighting capabilities. Do more without more.

5 USD(AT&L) 23 Principal Actions Addressing 5 Major Areas Target Affordability And Control Cost Growth Incentivize Productivity And Innovation In Industry Promote Real Competition Improve Tradecraft In Services Acquisition Reduce Non-productive Processes And Bureaucracy USD(AT&L) Memo, September 14, 2010: “Better Buying Power: Guidance for Obtaining Greater Efficiency and Productivity in Defense Spending”

6 Target Affordability And Control Cost Growth Mandate affordability as a requirement Drive productivity growth through Will Cost/Should Cost management Eliminate redundancy within warfighter portfolios Make production rates economical and hold them stable Set shorter program timelines and manage to them USD(AT&L) Memo, November 3, 2010: “Implementation Directive for Better Buying Power - Obtaining Greater Efficiency and Productivity in Defense Spending”

7 Mandate Affordability As A Requirement Milestone A Affordability targets to be treated like a Key Performance Parameter (KPP) –Average unit acquisition cost –Average annual operating and support cost per unit Basis for pre-MS B decision making and systems engineering tradeoff analysis Affordability targets in context of projected resources in portfolio(s)/mission area(s) associated with program If introducing a new program into a portfolio or mission area, components should indicate what specific adjustments will be made to absorb the new program

8 Mandate Affordability As A Requirement Milestone B Present systems engineering tradeoff analysis showing how cost varies as major design parameters and time to complete are traded Address spiral upgrades Establish 'Affordability Requirement' for acquisition cost and for operating and support cost in ADM and APB –Functional equivalent of KPP

9 Drive Productivity Growth Through Will Cost/Should Cost Management "Should Cost" targets established as management tools for all programs as they are considered for major milestone decisions –Use sound estimating techniques based on bottom-up assessments of what programs should cost, if reasonable efficiency and productivity enhancing efforts are undertaken Basis for contract negotiations/incentives and to track contractor and program executive officer/project manager performance

10 Additional Principal Actions Eliminate redundancy within warfighter portfolios –Component portfolio reviews for selected ACAT II and III programs to identify and eliminate redundancy –Annual report to USD(AT&L) Make production rates economical and hold them stable –Establish production rate change limits based on MS A or B affordability assessments –Deviations require USD(AT&L) review and approval prior to implementation or POM submission Set shorter program timelines and manage to them –Proposed schedule justified in cost tradeoff analysis at MS B –Justification part of ADM. Deviation from the schedule without prior approval could lead to MS revocation

11 Questions?