The project delivery specialists Presentation on ADC facility concepts- NIBRT, June 2014. expertise. The project delivery specialists.

Slides:



Advertisements
Similar presentations
Production Management, Inventory Control & Supply Chain Management
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
TabWare Overview for NetSuite
Innovative and well established product development company.
1 Agent Program Partner With Us. 2 About Xact Communications Xact provides superior cloud-based and traditional IP voice and data technology and is founded.
Company Background: Nestlé SA is a giant food and pharmaceuticals company that operates virtually all over the world. Headquartered in Vevey, Switzerland,
FACT SHEET o Established in the Year 2010 and excise benefit upto o The production unit is a large scale in size. o The company has established.
K S Gopinath Managing Director Mission Be a quality supplier of Automation Solution to all process industries with paramount importance for.
IDEAL PHARMACEUTICAL FACILITY PRESENTED BY: IHSAN ULLAH KHAN KHATTAK Chief Manager Production Highnoon Laboratories Limited 17.5 K.M. Multan Road, Lahore,
Regulatory Compliant Performance Improvement for Pharmaceutical Plants AIChE New Jersey Section 01/13/2004 Murugan Govindasamy Pfizer Inc.
Supply Chain Management 2 August Introduction What: Supply Chain Management Where: Organizations that have significant costs spent on purchasing.
SE 464: Industrial Information systems Systems Engineering Department Industrial Information System LAB 02: Introduction to SAP.
Materials Management BUS 3 – 141 Quality and Specification Leveraging Technical Excellence Week of Aug 31, 2010.
electronic Value Stream Mapping
Supply Chain 101 – July 2010.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Chapter 9: Software Tools and Dashboards. 2 V. Kumar and W. Reinartz – Customer Relationship Management Overview Topics discussed  CRM Implementation.
ERP Benefits.
AXSYS ®.Process Overview. AXSYS Products AXSYS.Process – Process Engineering Environment for Front End Design & Engineering, providing an integrated Process.
CORPORATE PROFILE
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Corporate Efficiency Meeting Improving Your Business Processes Using SharePoint and Beyond.
Key components of the business plan
Operational Excellence at Roche: PI Delivers Robert Fretz F. Hoffmann-La Roche Ltd. Basel, Switzerland.
Careers Matthew Ganey, Indiana University General Mills Company of Champions.
Innovative and well established product development company.
LSS and Commercialisation in MSD Daniel J. Hoey Merck Sharp & Dohme (Ireland) Ltd. 16 th October, 2009.
Overview of APL Logistics. Supply Chain Management Container Shipping Chartering & Enterprise Our Heritage Founded in 1968 Largest shipping company listed.
UNIT 4. All facilities, functions, activities, associated with flow and transformation of goods and services from raw materials to customer, as well as.
Materials Management
Process Selection Chapter 3, Part 2. Intermittent Operations Intermittent operations: processes used to produce a variety of products with different processing.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
ISAT 211 Mod 2-1  1997 M. Zarrugh ISAT 211 Module 2: Competitiveness and Operations Strategy  The learning objectives of this module are –To explain.
Veiovis LifeSciences Pvt Ltd
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Foundations of Value.
ASG Group Limited FINANCIAL RESULTS PRESENTATION - FY2006 Geoff LewisMD and CEO Dean LangenbachChief Financial Officer.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Pryor-Hale Business Plan Competition April 18, 2001 Michael McCorquodale, Chief Executive Officer Keith Kraver, Chief Technical Officer Mobius Integrated.
Logistics Management CHAPTER ELEVEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Chapter 14 Copyright ©2012 by Cengage Learning Inc. All rights reserved 1 Lamb, Hair, McDaniel CHAPTER 14 Supply Chain Management © iStockphoto.com/Robert.
Life cycle services for automation products
Wound Drainage Suction Pumps Fill Need in Marketplace AC has developed and tooled a novel wound drainage suction pump with the following unique proprietary.
ISPE Central Canada Chapter Annual Meeting September 28, 2006 Yvon R. Tessier Pharmaceutical contract manufacturing challenges.
Chapter 12 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Achieving World-Class Operations.
O BJECTIVES To Explain the aim of production. To Explain the dynamics of Operating Environment. To identify manufacturing types and lead-time concept.
Chapter 12 Global Production, Outsourcing, and Logistics.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
2015 NetSymm Overview NETSYMM OVERVIEW December
Operational Strategies: Lean Production A2 Business Studies.
ESilicon Corporation Summary. Confidential 2 Who is eSilicon? eSilicon is a Fabless ASIC Company Our mission: “To dramatically improve our customer’s.
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
TICKETMASTER CULTURE EATS STRATEGY FOR
1 Chapter 1: Product Development in the Changing World Introduction New technologies are changing the world we live in. How can a company succeed in this.
Packaging Design: Key Requirements in the Thermoformed Package Development Process.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Group member: Mohd Yatim Bin Idris (805540) Monalisa Lee (803737)
Upturn Consulting 27, March 2017.
Brian Walsh, MD Carbon Group
Functional and Enterprise Systems
Continuous Delivery- Complete Guide
Manufacturing Capacity Increase via Cycle Time Reduction
The NxtWall Advantage.
Functional and Enterprise Systems
Company Presentation.
Production and Operations Management
Agenda About us Industry expertise Service Contact us.
from ideation to design and realization
Founded in 1946 Manufactured in Michigan
Presentation transcript:

The project delivery specialists Presentation on ADC facility concepts- NIBRT, June expertise. The project delivery specialists

Agenda 1. PM Group Overview 2. ADC process flow 3. PMG- Dance floor concept 4. PMG’s Standardized Disposable Design Initiative – SDD 5. How to apply PMG concepts to ADC manufacture 1. Facility design 2. Connectivity and routing 3. Remote operation 4. Handling of toxic waste

The Project Delivery Specialists You can rely on our team of 2,100+ people to deliver your project successfully Integrated Design and Construction firm Proven track record since 1973 Employee-owned company Revenue over €300 million 18 offices worldwide Projects in 30 countries 3

Our work Spans the Full Pharma Spectrum 4 Biopharmaceuticals Vaccines Blood Fractionation Chemical API Fill & Finish Formulation Oral Solid Dosage Packaging Pilot Plants QA/QC Laboratories R&D Laboratories Warehousing

Key Technical strengths 5 Lean facility design. Impartial advice. Biosolve TM modelling. Cost of goods (COG) modelling. Cost / benefit vs stainless. Disposables strategy document. Prototyping & 3D modelling. Automation/MES advice. Standardised Disposables Design (SDD). Can be used as a COG’s tool for disposables. Application of the ‘Dance Floor’ concepts - where needed. SDD 3D

The project delivery specialists Pall’s ADC process flows skill. The project delivery specialists

Process Flows 7 100L to 500L scale for in- market supply

Process Flows 8

The project delivery specialists Lessons learnt in the Ballroom (The Dance Floor concept) excellence. The project delivery specialists

The Dance Floor Concept Static Totes. Defined Tubing Paths. The 3M rule. No trip Hazards. Ability to Automate. Facility engineered to be lean. Smaller footprint. Less HVAC costs. Note:- Ballrooms concepts are suited for clinical facilities, where flexibility is key. However the Dance Floors concepts are more suited to in-market supply, where reliability and efficiency are paramount. Article For Pharmaceutical Engineering Magazine

The project delivery specialists PMG’s Standardized Disposable Design Initiative - SDD excellence. The project delivery specialists

End User Advantages of SDD “Standardisation of disposables is what the industry has being ‘crying out for’ for years. The benefits in terms of interconnectivity between items from different suppliers, simplification of dual sourcing of materials and reduction in prototype lead times will be significant”. Declan O’Sullivan Area manager Pfizer Grange Castle Suppliers ‘on-board ’

High level benefits of SDD Initiative Interconnectivity between different vendors, Speeds up plant design, Standardizes parts, Multiple vendor selection, ‘Like for like’ comparisons, Increased security of supply,

Disposable Design Strategy Flow Chart PM Group Standardised Disposables Design Process Flow Diagram (PFD) Parts List sent to vendors for pricing Use PMGroup’s Supplier Drawing Database to choose suitable part PM Group 2013 PM Group’s Visio ‘Drag & Drop’ Design Tool

The project delivery specialists Can PMG concepts be applied to ADC manufacture ? excellence. The project delivery specialists

Rapid prototyping & 3D modelling Fit the facility round the process, rather than the process into the facility Media/buffer on the other side of the wall Facility design & ADC’s

Reliability and repeatability is paramount from a health/safety and product quality/productivity perspective. Connectivity and defined tubing routes

Reliability and repeatability is paramount from a health/safety and product quality/productivity perspective. Automation & remote reliable operation

The cleaning solution & the CIP system will be contaminated with toxic compounds and need to be contained. Single use systems can Remain contained during disassembly Do not need to be CIPed Can be incinerated without opening Provide more reliable operator protection Need less maintenance & prep for maintenance CIP and Toxic waste

Questions