Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

6 July EFET Position on Information Transparency Paul Dawson, Barclays Capital ERGEG Public Hearing on Transparency 6 th July 2006.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
NTS Update Gas Customer Forum 25 th September 2006.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
1 The Spanish Gas Industry and the 3 rd Package Antoni Peris Mingot – Sedigas President GIE Annual Conference – Madrid.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft for discussion1 Daily Outlook Gas Day : Wednesday, 15/01/06 Todays Opening Linepack296mcm Predicted Closing Linepack (PCLP1)293mcm Change in Linepack-3mcm.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Review Group -140 Thoughts on additional information requirements.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Restricted Invoice Period Criteria Rochelle Hudson.
Work Plan and Key Deliverables 2 November WORK PLAN.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Transmission Workstream 6 January 2011
Review of System Alerts
2009 TSO Transparency Gas Regional Initiative North-West
GRI NW TRANSPARENCY PROJECT
European Transparency Requirements
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Development of Entry Capacity Substitution
Richard Fairholme E.ON UK
Proposed Changes to UNC Section O
Entry Capacity Transfer and Trade
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Stefan Leedham Transmission Workstream 2nd November 2006
Transmission Workstream, 1 Mar 07
Presentation transcript:

Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy

Agenda Background Considerations Current Landscape Way Forward

Background Tight supply/demand positions and threats to security of supply have led to a “clambering” for information and market transparency Various initiatives have come forward to address concerns and make information more readily available to industry participants and interested parties: –Modifications 006, 097, 104 and 121 –DTI/UKOOA initiative on North/South aggregated physical flows

Considerations There are perceived benefits from greater transparency and availability of information, with Ofgem believing this to be a requirement to ensure economic and efficient operation of the market There are questions over commercial sensitivity of information and also the benefits to the wider market of the release of certain aspects of information What is the optimum information transparency position and how do we ensure cost effectiveness?

Current Landscape Flows into the NTS – by entry zone Terminal supplies – instantaneous flows Within day daily reports –NB05 – System Nomination Balance –NB92 – System Status Information –NTSAFF – Aggregate Forecast flows into the NTS –NTSAPF – Aggregate physical flows into the NTS –NTSDE – D-2 to D-5 NTS demand forecast report –SISR03 – Forecast Demands

Current Landscape After day daily reports –NORD01 – Daily balance report –NORD06 – Gas trading report –SISR04 – Actual demands –NTS Entry end of day flow Does current information provision satisfy market needs?

Way Forward It is proposed that discussion and analysis of information transparency should commence, involving customers, Shippers, Storage Operators, Ofgem, energywatch and interested industry parties Consideration should be given to the optimum provision of information, in light of cost benefit and promotion of the relevant objectives of the UNC Usefulness and commercial sensitivity of the information should also be considered, as well as whether or not aggregate information is sufficient and mitigates against commercial risk